JEEP CHEROKEE 1994 Service Repair Manual

JEEP CHEROKEE 1994 Service Repair Manual CHEROKEE 1994 JEEP JEEP https://www.carmanualsonline.info/img/16/57038/w960_57038-0.png JEEP CHEROKEE 1994 Service Repair Manual
Trending: service indicator, odometer, fuse chart, parking brake, spare tire location, wheel bolts, battery capacity

Page 1161 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (10) Press 3-4 hub and sleeve off output shaft as
assembly (Fig. 63).
(11) Remove synchro ring.
(12) Remove third gear and needle bearing (Fig. 63).
TRANSMISSION CLEANING AND INSPECTION
Clean the tran

Page 1162 of 1784

JEEP CHEROKEE 1994  Service Repair Manual Maximum allowable clearance is 0.16 mm (0.0063
in.). If any gear exhibits excessive clearance, replace
the gear and needle bearing.
Check clearance between the shift forks and syn-
chro sleeves with a

Page 1163 of 1784

JEEP CHEROKEE 1994  Service Repair Manual FRONT BEARING, SEAL AND PIN
INSTALLATION
(1) Press front bearing on input shaft. Then secure
bearing with thickest snap ring that will fit in shaft
groove (Fig. 70).
(2) Press front bearing on cluster

Page 1164 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (5) Lubricate reverse shaft and gear components
with Mopar 75W-90 gear lubricant.
OUTPUT SHAFT ASSEMBLY
(1) Lubricate output shaft journals, gears and nee-
dle bearings with Mopar 75W-90 gear lubrican

Page 1165 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (16) Install first gear spacer on shaft and against
selective fit snap ring (Fig. 79).
(17) Install first gear and needle bearing (Fig. 79)
on output shaft.
(18) Install locating pin and thrust washer

Page 1166 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (6) Install snap rings on cluster and output shaft
rearbearings only (Fig. 82). Do not install front
bearing snap rings at this time.(7) Install reverse idler gear and shaft (Fig. 83).
(8) Position re

Page 1167 of 1784

JEEP CHEROKEE 1994  Service Repair Manual SHIFT RAIL AND FORK INSTALLATION
The shift rail interlock pins, balls and plugs must
be installed in the correct sequence for proper shift-
ing. Refer to the installation diagram (Fig. 85) dur-
ing as

Page 1168 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (2) Install reverse shift rail in intermediate plate
(Fig. 87).
(3) Install reverse shift rail C-ring (Fig. 51).
(4) Position 1-2 and 3-4 shift forks in synchro
sleeves (Fig. 88).
(5) Coat reverse rai

Page 1169 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (8) Install 1-2 shift rail in intermediate plate and
1-2 fork (Fig. 92).
(9) Coat 3-4 shift rail interlock plug with petro-
leum jelly and install plug in intermediate plate (Fig.
93).
(10) Install 3-

Page 1170 of 1784

JEEP CHEROKEE 1994  Service Repair Manual FIFTH-REVERSE GEAR AND SHIFT
COMPONENT INSTALLATION
(1) Install thrust ring lock ball in cluster gear
journal (Fig. 97). Use petroleum jelly to hold ball in
place.
(2) Install fifth gear thrust ring (
Trending: wiper blades, fog light, brakes, remote control, recommended oil, relay, battery location