key MAZDA MX-5 1994 Workshop Manual
[x] Cancel search | Manufacturer: MAZDA, Model Year: 1994, Model line: MX-5, Model: MAZDA MX-5 1994Pages: 1708, PDF Size: 82.34 MB
Page 62 of 1708

ON-VEHICLE MAINTENANCE B Steps After Installation 1. Connect the neaative batterv cable. Oil seal 1. Cut the oil seal lip with a razor knife. 2. Remove the oil seal with a screwdriver protected with a rag. Installation Note Oil seal 1. Apply a small amount of clean engine oil to the lip of a new oil seal. 2. Push the oil seal slightly in by hand. 3. Tap the oil seal in evenly with a pipe and a hammer until it is flush with the edge of the oil pump body. Note Oil seal outer diameter: 50.5mm (1.99 in} Oil seal inner diameter: 36.5mm (1.44 in} Timing belt pulley 1. Install the timing belt pulley. 2. Install the pulley woodruff key with the tapered side to- ward the oil pump body. 2. Start the enginsand check, and if necessary, adjust the ignition timing. 3. Connect the negative battery cable. 4. Start the engine and check follows: (1) Engine coolant leakage (2) Ignition timing (Refer to page B-9.) 5. Recheck the engine coolant levels. Gartner Banana
Page 111 of 1708

B ASSEMBLY TIMING MARK Timing Belt Pulley 1. lnstall the timing belt pulley. 2. lnstall the pulley woodruff key with the tapered side to- ward the oil pump body. d Idler lnstall the idler. Tightening torque: 38-51 N.m (3.8-5.3 kgf.m, 28-38 ftlbf) Tensioner and Tensioner Spring 1. lnstall the tensioner and the tensioner spring. 2. Temporarily secure the tensioner with the spring fully ex- tended. Timing Belt 1, Turn the crankshaft and align the timing belt pulley mark with the timing mark. Do not turn the crankshaft counter- clockwise. 2. Verify that the camshaft pulley marks are aligned with the seal plate marks. E for intake side and I for exhaust side. Do not turn the crankshaft counterclockwise. 3. lnstall the timing belt so that there is no looseness at the idler side or between the two camshaft pulleys. 4. lnstall the pulley boss and pulley lock bolt. 5. Turn the crankshaft two turns clockwise, and align the timing belt pulley mark with the timing mark. Do not turn the crankshaft counterclockwise. 6. Verify that the camshaft pulley marks are aligned with the seal plate marks. J If not aligned, remove the timing belt and repeat from tensioner installation. Gartner Banana
Page 371 of 1708

TRANSMISSION 1. Snap ring 2. Washer 3. Retaining ring b 4. C-washer 5. Mainshaft rear bearing Disassembly Note . below Inspection ... page J-25 6. Retaining ring 7. C-washer 8. Thrust lock washer 9. Steel ball 10. Locknut (Countershaft) Disassembly Note ................ below 11. Countershaft rear bearing Disassembly Note ........... page J-18 Inspection ... page J-25 12. Counter 5th gear Inspection ... page J-23 13. Spacer 14. 5th gear 15. 5th synchronizer ring Inspection ... page J-24 16. Locknut (Mainshaft) Disassembly Note ........... page J-18 17. Clutch hub assembly (5thIReverse) Inspection ... page J-23 18. Reverse synchronizer ring Inspection ... page J-24 19. Reverse gear Inspection ... page J-23 20. Bearing Inspection ... page J-25 21. Bearing race 22. Washer 23. Counter reverse gear Inspection ... page J-23 24. Main drive gear bearing Disassembly Note ........... page J-18 Inspection ... page J-25 26. Countershaft front bearing Disassembly Note ........... page J-18 Inspection ... page J-25 27. Bearing housing assembly Disassembly Note ........... page J-18 Disassembly page J-20 28. Mainshaft gear assembly 29. Main drive gear Inspection ... page J-23 30. 4th synchronizer ring Inspection ... page J-24 31. Bearing Inspection ... page J-25 32. Washer 33. Countershaft Inspection ... page J-23 34. Spacer 35. Synchronizer key springs 36. Clutch hub sleeve 37. Synchronizer key . . Inspection ... page J-23 25. Snap ring 38. Clutch hub 45UOJX-012 Disassembly note Mainshaft rear bearing Remove the mainshaft rear bearing by using the SST. Locknut (Countershaft) 1. Shift the clutch hub sleeves into 1 st and Reverse gears to lock the rotation of the mainshaft. 2. Use a suitable tool to uncrimp the tabs of the locknut. 3. Connect the SST to the mainshaft and secure it in a vise. 4. Remove the locknut. Gartner Banana
Page 373 of 1708

TRANSMISSION J Mainshaft Parts Disassemble in the order shown in the figure, referring to Disassembly Note. 1. 1st gear 10. Synchronizer assembly (2nd) Inspection ................... page J-23 lnspection ................... page J-24 2. Bearing 11. Inner cone Inspection ................... page J-25 12. Double cone 3. Bearing race 13. 2nd synchronizer ring 4. 1st synchronizer ring Inspection ................... page J-24 Inspection ................... page J-24 14. 2nd gear 5. Snap ring Inspection ................... page J-23 6. Clutch hub assembly (3rdl4th) 15. Mainshaft Disassembly Note ............ page J-20 Inspection ................... page J-23 Inspection ................... page J-23 16. Synchronizer key springs 7. 3rd synchronizer ring 17. Clutch hub sleeve Inspection ................... page J-24 18. Synchronizer key 8. 3rd gear 19. Clutch hub ................... u Inspection page J-23 9. Clutch hub assembly (1 stl2nd) Disassembly Note ............ page J-20 Inspection ................... page J-23 Gartner Banana
Page 377 of 1708

TRANSMISSION J INSPECTION lnspect all parts and repair or replace as necessary. Each Gear and Main Drive Gear 1, lnspect synchronizer cones for wear. 2. lnspect individual gear teeth for damage, wear, and cracks. 3. lnspect synchronizer ring matching teeth for damage and wear. 4. lnspect main drive gear splines for damage and wear. MEASUREMENT POINTS 35UOJX-046 Mainshaft 1. Measure the mainshaft runout as shown. Maximum runout: 0.03mm (0.0012 in} 2. lnspect splines for damage or wear. 3. Measure the clearance between mainshaft and gear (or bushing). Maximum clearance: 0.15mm (0.006 in} Countershaft 1. lnspect gear teeth for damage, wear, and cracks. 2. lnspect splines for damage and wear. Clutch Hub Assembly 1. lnspect clutch hub sleeve and hub operation. 2. lnspect individual gear teeth for damage, wear, and cracks. 3. lnspect synchronizer keys for damage, wear, and cracks. Gartner Banana
Page 380 of 1708

J TRANSMISSION ASSEMBLY Precaution 1. All O-rings and gaskets must be replaced with the new ones included in the overhaul kit. 2. Before assembly, make sure all parts are completely clean. 4 3. Assemble the parts within 10 minutes after applying sealant. Allow all sealant to cure at least 30 minutes after assembly before filling the transmission with transmission oil. 35UOJX-053 (5TH) (REVERSE) (~RD, 4TH) (1 ST, 2ND) 45UOJX-029 Clutch hub For the synchronizer assemblies, align the synchronizer ring grooves and synchronizer keys. The synchronizer rings can be distinguished as shown in the figure. The inner diametes of the 2nd synchronizer ring is larger than the 1 st. When installing the gears and clutch hub assemblies in the following procedure, make sure that they are installed in the direction shown in the figure. Gartner Banana
Page 385 of 1708

TRANSMISSION J Mainshaft Parts Assemble in the order shown in the figure, referring to Assembly Note. WPPLY SPEwim OIL To IwiviDwL PmTs 45UOJX-034 Clutch hub Synchronizer key Clutch hub sleeve Synchronizer key springs Mainshaft 2nd gear Assembly Note .............. page J-32 2nd synchronizer ring Double cone Inner cone Synchronizer assembly (2nd) Clutch hub assembly (Istf2nd) Assembly Note .............. page J-32 3rd gear Assembly Note .............. page J-32 3rd synchronizer ring Clutch hub assembly (3rdl4th) Assembly Note .............. page J-32 Snap ring Assembly Note .............. page J-32 1 st synchronizer ring Bearing race Assembly Note .............. page J-32 Bearing Assembly Note .............. page J-32 1 st gear Assembly Note .............. page J-32 5-31 Gartner Banana
Page 389 of 1708

TRANSMISSION 1. Clutch hub 2. Synchronizer key 3. Clutch hub sleeve b 4. Synchronizer key springs 5. 4th synchronizer ring 6. Bearing 7. Main drive gear 8. Bearing housing assembly 9. Washer 10. Mainshaft gear assembly Assembly Note .................. below 1 1 . Spacer 12. Countershaft .................. Assembly Note below 13. Counter reverse gear 14. Washer 15. Bearing race 16. Bearing 17. Reverse gear 18. Reverse synchronizer ring 19. Clutch hub assembly (5thlReverse) 20. Locknut (Mainshaft) .................. Assembly Note below 21. 5th synchro-niter ring 22. 5th gear 23. Steel ball 24. Thrust lock washer .............. Assembly Note page J-36 25. C-washer .............. Assembly Note page J-36 26. Retaining ring .............. Assembly Note page J-36 27. Spacer 28. Counter 5th gear 29. Mainshaft rear bearing .............. Assembly Note page J-36 30. C-washer .............. Assembly Note page J-36 31. Retaining ring .............. Assembly Note page J-36 32. Washer .............. Assembly Note page J-36 33. Snap ring 34. Countershaft rear bearing .............. Assembly Note page J-36 35. Locknut (Countershaft) .............. Assembly Note page J-37 45UOJX437 Assembly note Mainshaft and countershaft 1. Place the mainshaft gear assembly and the countershaft on the bearing housing. 2. Use a suitable bar to press in the countershaft. Locknut (Mainshaft) 1. Secure the bearing housing assembly in a vise. 2. Shift the clutch hub sleeves into 1 st and Reverse gears to lock the rotation of the mainshaft. 3. Install a new locknut and tighten it by using the SST. Tightening torque: 128-235 N.m (13-24 kgf.m, 95-173 ftdbf) 4. Use a chisel to stake the locknut. Gartner Banana
Page 394 of 1708

J TRANSMISSION CLUTCH SLEEVE SYNCHRONIZER KEY Shift fork and rod, interlock pin 1. Set the 1 stf2nd shift fork onto the 1 sV2nd clutch hub assembly. 2. Install the 3rdI4th shift fork and 3rdl4th shift rod, and ii install the interlock pin into the bearing housing as shown in the interlock pin assembly note. (Refer to page J-39.) Roll pin Install a new roll pin into each shift fork. The roll pin must be installed with the split facing as shown. Spring, spacer, clip 1. Slide the spring and spacer onto the 5thlReverse shift rod. While pressing the spacer, install a new clip. 2. Install new clips to the 3rdl4th shift rod and 1 sV2nd shift rod. 3. Verify that the centers of the shift fork and clutch hub sleeve are aligned properly< If they are not, select the proper washer to install between 1st gear and the mainshaft front bearing, and between reverse gear and the mainshaft front bearing. Gartner Banana
Page 402 of 1708

Before beginning any service procedure. refer to section T of this manual for air bag system service warnings and audio antitheft system alarm conditions . AUTOMATIC TRANSMISSION INDEX ................................ K- 2 OUTLINE ............................. K- 3 SPECIFICATIONS ................... K- 3 ........... CROSS-SECTIONAL VIEW K- 4 POWER FLOW DIAGRAM ............ K- 5 OPERATION OF COMPONENTS ...... K- 5 FLUID PASSAGE LOCATIONS ........ K- 6 TROUBLESHOOTING .................. K- 8 GENERAL NOTES ................... K- 8 .......... QUICK DIAGNOSIS CHART K- 9 ON-BOARD DIAGNOSIS SYSTEM ...... K- 11 DESCRIPTION ...................... K- 11 PREPARATION ...................... K- 11 ....... DIAGNOSTIC TROUBLE CODE K- 11 .......... MECHANICAL SYSTEM TEST K- 22 PREPARATION ...................... K- 22 STALL TEST ........................ K- 22 TIME LAG TEST ..................... K- 25 LINE PRESSURE TEST .............. K- 26 ROAD TEST .......................... K- 29 D-RANGE TEST ..................... K- 29 S-RANGE TEST ..................... K- 31 ..................... L-RANGE TEST K- 32 . P-RANGE TEST ..................... K- 33 AUTOMATIC TRANSMISSION FLUID (ATF) ................................ K- 35 ATF ................................ K- 35 REPLACEMENT ..................... K- 37 ELECTRICAL SYSTEM COMPONENTS . . K- 38 PREPARATION ...................... K- 38 HOLD SWITCH ...................... K- 38 PARWNEUTRAL SWITCH ............ K- 39 .............. ATF THERMOSENSOR K- 41 VEHICLE SPEED PULSE GENERATOR ...................... K- 41 1-2 SHIFT. 2-3 SHIFT. 3-4 SHIFT. ... 3-2 CONTROL SOLENOID VALVE K- 42 LOCKUP CONTROL SOLENOID ....... VALVE ............................ K- 42 POWERTRAIN CONTROL MODULE (TRANSMISSION) .................. K- 43 TRANSMISSION ....................... K- 46 TRANSMISSION UNIT (REMOVAL) .... K- 46 TRANSMISSION UNlT (DISASSEMBLY) ................... K- 50 TORQUE CONVERTER .............. K- 61 OILPUMP .......................... K- 62 FOURTH GEAR CONNECTING SHELL AND FOURTH GEAR PLANETARY GEAR UNIT (FOURTH GEAR SUN GEAR. FOURTH GEAR PLANETARY PINION CARRIER. FOURTH GEAR CLUTCH HUB) ...... K- 67 DIRECT CLUTCH .................... K- 70 FOURTH GEAR BAND SERVO ........ K- 76 DRUM SUPPORT. ACCUMULATOR. AND FOURTH GEAR CASE ......... K- 79 2ND BAND SERVO .................. K- 83 FRONT CLUTCH .................... K- 86 REAR CLUTCH ...................... K- 91 CONNECTING SHELL AND FRONT PLANETARY GEAR UNlT (REAR CLUTCH HUB. FRONT PLANETARY PINION CARRIER. REAR SUN GEAR) ................. K- 96 REAR PLANETARY GEAR UNlT (CONNECTING DRUM. REAR PLANETARY PINION CARRIER. ONE-WAY CLUTCH) K- 98 LOW AND REVERSE BRAKE K-102 ................ ......... EXTENSION HOUSING AND PARKING MECHANISM ............. K-107 OIL SEAL ........................... K-ill CONTROL VALVE BODY ............. K-112 UPPER VALVE BODY ................ K-116 LOWER VALVE BODY ............... K-120 CONTROL VALVE BODY ............. K-125 VACUUM DIAPHRAGM ............... K-130 TRANSMISSION UNIT (ASSEMBLY) ... K-132 TRANSMISSION UNIT (INSTALLATION) ................... K-147 OIL COOLER .......................... K-151 REMOVAL I INSPECTION I INSTALLATION ..................... K-151 DRIVE PLATE ......................... K-152 PREPARATION ...................... K-152 REMOVAL 1 INSPECTION I INSTALLATION ..................... K-152 SHIFT MECHANISM (WITH SHIFT-LOCK SYSTEM) ......... K-154 SHIFT-LOCK SYSTEM COMPONENTS K-154 TROUBLESHOOTING ................ K-155 SHIFT-LOCK ........................ K-157 EMERGENCY OVERRIDE BUTTON ... K-157 KEY INTERLOCK .................... K-157 KEY INTERLOCK SOLENOID ......... K-157 KEY INTERLOCK UNIT ............... K-158 P RANGE SWITCH .................. K-159 SHIFT-LOCKACTUATOR ............. K-159 SELECTOR LEVER .................. K-161 HYDRAULIC CIRCUIT .................. K-168 P RANGE ........................... K-168 R RANGE ........................... K-169 N RANGE; BELOW 7 kmlh I4.34 mph) . K-170 N RANGE; ABOVE 9 kmlh (5.58 mph} . K-171 D RANGE; 1 ST GEAR ................ K-172 D RANGE; 2ND GEAR ............... K-173 D RANGE; THIRD GEAR ............. K-174 D RANGE; FOURTH GEAR. LOCKUP ON ....................... K-175 S RANGE; 1 ST GEAR ................ K-176 S RANGE; 2ND GEAR ............... K-177 S RANGE; THIRD GEAR ............. K-178 L RANGE; 1 ST GEAR ................ K-179 L RANGE; 2ND GEAR ................ K-180 Gartner Banana