boot MITSUBISHI ECLIPSE 1991 Workshop Manual

MITSUBISHI ECLIPSE 1991 Workshop Manual ECLIPSE 1991 MITSUBISHI MITSUBISHI https://www.carmanualsonline.info/img/19/57104/w960_57104-0.png MITSUBISHI ECLIPSE 1991 Workshop Manual

Page 681 of 1216

MITSUBISHI ECLIPSE 1991 Workshop Manual STEERING - Power Steering Gear Box4 $143
13130549
13Ro581
Pipe
13RO218
31. REMOVAL OF BALL BEARINGUse a brass bar to remove the ball bearing from the gear
housing.
-)-’9,I :
>.,I:32.REMOVAL
 OF NEED

Page 710 of 1216

MITSUBISHI ECLIPSE 1991 Workshop Manual 21-16MANUAL TRANSAXLE <FWD> - Transaxle Control
INSPECTIONN21JcAD
ICBA0160 1Incorrect 
5I,I
-ri
IIIncorrect 
1,-I I,,1 :
Sele’ctcableFlange side
yof the resin LbushingLever 
&OSAOl72l Check the sele

Page 760 of 1216

MITSUBISHI ECLIPSE 1991 Workshop Manual 21-66MANUAL TRANSAXLE <FWD> - Clutch Housing Assembly
CLUTCH HOUSING ASSEMBLYNZlMPAL
DISASSEMBLY AND REASSEMBLY
2=
-,_
1
L--15-22 Nm
11-15 ftlbs.
20-27 Nm15-19 ft.lbs.
Disassembly steps
1.Bolt2. Selec

Page 815 of 1216

MITSUBISHI ECLIPSE 1991 Workshop Manual MANUAL TRANSAXLE <AWD> - Clutch Housing Assembly21-121
CLUTCH HOUSING ASSEMBLY
-- DISASSEMBLY AND REASSEMBLY
NZlMPAH
-20-27 Nm
15-
19 ft.lbs.
15-22 Nm15 ft.lbs.18
Disassembly steps
I, Bolt
2. Select

Page 1128 of 1216

MITSUBISHI ECLIPSE 1991 Workshop Manual 23-84BODY - Floor Console
FLOOR CONSOLEN23lJBAP
REMOVAL AND INSTALLATIONGk2 /---I
Removal stew1 Plug
2. Side cover 
(A)3. Side cover (B)4. Cover 
(6)5. Manual transaxle shift lever knob
6. Cup holder7