ECU NISSAN 300ZX 1984 Z31 Steering System Workshop Manual
[x] Cancel search | Manufacturer: NISSAN, Model Year: 1984, Model line: 300ZX, Model: NISSAN 300ZX 1984 Z31Pages: 20, PDF Size: 0.7 MB
Page 11 of 20
POWER STEERING GEAR AND LINKAGE
1701.
I601
I501
Disassembly and
Rack and inner tube assembling
-
1
Insert rack packing into rack
damage by rack teeth Attach back-up
oat of automatic 80" fluid "Dexion * 1 - n '6 Type" to matlng surface of rack packing 1 ack
k pnrton
KV48103100 lJ342641
ackup collar and rack
1
Insert rack packing into mer tube with tool
SST211A
Tie-rod inner socket installation
After tightening inner socket, bend
lock plate securely and remove burrs
7 Lock plate
Inner socket
Apply locking sealer
78-98Nm ' I8 0 - 10 0 kern. 58.72 h-lbl / I Be sure lock plate ratchet gets into groove at rack end SST213A
Rack stroke
sembly (Cont'd)
Cylinder end housing and pinion housing lock nut
tightening
n : Locknut:
78 - 108 N m
(8.0 - 11.0 kg-m, 58 - 80 ft-lb)
Torque wrench
lJ288201 vc'
98 I101
88 I91
-
04050607 08 m
4' I1 51 I2 01 (2 51 Iff1
Effective length of torque wrench L ssT212A
Tie-rod installation
Lack nut Lock plate
Inner socket
Standard dimension L = 31 5 mm I1 476 In1 When installing tie-rod or adiustmg toe-,".
be careful not to twist boots Toe-," Refer to MA section
Pl"l.3"
Rear housing
I?-
- 62 lz.441 'Cylmder end housing /
SST'214A
iTie-rad inner socket
ICylmder
end hourlng sidel SSTZlBA IPinion sidel
ST-I 1
Page 12 of 20
POWER STEERING GEAR AND LINKAGE
Inspection and Adjustment
PINION PRELOAD AND RACK STARTING
FORCE
After disconnecting hydraulic line and draining
fluid, measure them
Pmon preload Less than 1 2 N m I12 kg-cm, 10 In-lbl
Turn shaft by wrappi towel or wnvl tape ar serrated portion
102100 (J288171
SST216A
Rack starting force 122 6.1863 N I12 5- 19 kg.276 -41 9 Ibl at Steernng Ce"t.3,
SST217A
If they are not within specifications, adjust
retainer adjusting screw
If retainer adjustment cannot be made proper-
ly, fully loosen retainer adjusting screw, and
then adjust pinion preload
Then readjust retainer adjusting screw
If pinion preload adjustment cannot be made
properly, replace steering gear assembly
Retainer adjustment
1
2
3
R
Remove retainer adjusting screw and clean old
locking
sealer off the threads
Apply new locking sealer to the threads
Tighten
the screw to approximately 3 N rn (0.3
kg-m, 2 2 h-lb) and back it off by 20 to 25"
If preload and starting force are within speci-
fied ranges, tighten lock nut securely (Check
rack for smooth movement over
its entire
stroke.)
Pinion preload:
Less than 1.2 Nm 112 kgcm, 10 in-lb)
Rack starting force:
122.6
- 186.3 N
(12.5-19kg,276 -41.9lb)
. Retainer adjusting screw lock nut
39 - 59 Nm
(4.0 - 6.0 kgm, 29 - 43 ft-lb)
Pinion preload adjustment
Before making pinion preload adjustment, make
sure retainer adjusting screw
is loosened com-
pletely
1 Screw in rear housing cover completely and
back it off by 180 to 360". Then turn pinion
a few rotations and then measure pinion
starting torque
KV48101700
I or
SST218A
Pinion starting torque T, :
Free play should not be allowed for pinion
Less than 0.7 Nm (7 kg-cm, 6.1 in-lb)
ST-1 2