ignition NISSAN TEANA 2014 Service Manual
[x] Cancel search | Manufacturer: NISSAN, Model Year: 2014, Model line: TEANA, Model: NISSAN TEANA 2014Pages: 4801, PDF Size: 51.2 MB
Page 2140 of 4801
![NISSAN TEANA 2014 Service Manual
EM-142
< PERIODIC MAINTENANCE >[VQ35DE]
COMPRESSION PRESSURE
COMPRESSION PRESSURE
On-Vehicle ServiceINFOID:0000000009460536
CHECKING COMPRESSION PRESSURE
1. Run the engine until it reaches normal ope NISSAN TEANA 2014 Service Manual
EM-142
< PERIODIC MAINTENANCE >[VQ35DE]
COMPRESSION PRESSURE
COMPRESSION PRESSURE
On-Vehicle ServiceINFOID:0000000009460536
CHECKING COMPRESSION PRESSURE
1. Run the engine until it reaches normal ope](/img/5/57390/w960_57390-2139.png)
EM-142
< PERIODIC MAINTENANCE >[VQ35DE]
COMPRESSION PRESSURE
COMPRESSION PRESSURE
On-Vehicle ServiceINFOID:0000000009460536
CHECKING COMPRESSION PRESSURE
1. Run the engine until it reaches normal operating temperature.
2. Turn the ignition switch to OFF.
3. Release fuel pressure and leave t he fuel pump electrically disconnected.
Refer to EC-687, "Work Procedure"
.
4. Remove all six spark plugs. Refer to EM-132, "Removal and Installation"
.
5. Install the compression tester with the adapter into the spark plug hole. • Use compression tester whose end (a) (rubber portion) is
smaller than 20 mm (0.79 in) in diameter. Otherwise, it may be
caught by cylinder head during removal.
6. Depress accelerator pedal fully to keep the electric throttle control actuator butterfly-valve wide open to
maximize air intake flow.
7. Crank the engine and record the highest gauge indication.
8. Repeat the measurement on each cylinder (steps 5 - 7). NOTE:
Always use a fully charged battery to obtain specified engine speed.
Unit: kPa (kg/cm2, psi)/rpm
9. If compression in one or more cylinders is low:
a. Pour a small amount of engine oil into cylinders through the spark plug holes.
b. Retest compression (steps 5 - 8).
• If adding oil helps raise compression pressure, then the piston rings may be worn or damaged. If so, replace piston rings after checking piston.
• If the pressure stays low, a valve may be sticking or is seating improperly. Inspect and repair the valve and/
or valve seat. Refer to EM-212, "Inspection After Disassembly"
. If the valve and/or valve seat is damaged
replace as necessary.
• If compression stays low in two or more cylinders that are next to each other:
- The cylinder head gasket may be leaking.
- Both cylinders may have valve component damage. Inspect and repair as necessary.
JPBIA0171ZZ
Standard Minimum Difference limit between cylinders
1,275 (13.0, 185)/300 981 (10.0, 142)/300 98 (1.0, 14)/300
Revision: November 20132014 Altima NAM
Page 2148 of 4801
![NISSAN TEANA 2014 Service Manual
EM-150
< REMOVAL AND INSTALLATION >[VQ35DE]
INTAKE MANIFOLD
6. Loosen the bolts in the order as shown, and remove the intake
manifold.
INSPECTION AFTER REMOVAL
Surface Distortion
• Using straighte NISSAN TEANA 2014 Service Manual
EM-150
< REMOVAL AND INSTALLATION >[VQ35DE]
INTAKE MANIFOLD
6. Loosen the bolts in the order as shown, and remove the intake
manifold.
INSPECTION AFTER REMOVAL
Surface Distortion
• Using straighte](/img/5/57390/w960_57390-2147.png)
EM-150
< REMOVAL AND INSTALLATION >[VQ35DE]
INTAKE MANIFOLD
6. Loosen the bolts in the order as shown, and remove the intake
manifold.
INSPECTION AFTER REMOVAL
Surface Distortion
• Using straightedge and feeler gauge, inspect the surface distortion of the intake manifold. Refer to EM-146, "Removal and Installa-
tion".
INSTALLATION
Installation is in the reverse order of removal. Fo llow the procedure below for specific tightening sequences
and procedures.
CAUTION:
Do not reuse intake manifold gaskets.
• Install intake manifold nuts and bolts in two steps in the numerical order as shown.
NOTE:
After installation, it is necessary to re-calibrate the electric throttle control actuator as follows:
1. Perform the "Throttle Valve Closed Position Learning" when harness connector of the electric throttle con-
trol actuator is disconnected. Refer to EC-682, "Work Procedure"
.
2. Perform the "Idle Air Volume Learning" when the electric throttle control actuator is replaced. Refer to EC-
683, "Work Procedure".
3. Install the quick connector. Refer to EM-163, "Removal and Installation"
.
INSPECTION AFTER INSTALLATION
Make sure there are no fuel leaks at the connections as follows:
1. Apply fuel pressure to fuel lines by turning ignition switch ON (with engine stopped). Then check for fuel leaks at connections.
2. Start the engine and rev it up and check for fuel leaks at connections. WARNING:
Do not touch engine immediately after stopping as engine is extremely hot.
NOTE:
Use mirrors for checking on connections out of the direct line of sight.
ALBIA0232ZZ
Standard : 0.1 mm (0.004 in)
WBIA0052E
Step 1 : 7.3 N·m (0.74 kg-m, 65 in-lb)
Step 2 : 25.5 N·m (2.6 kg-m, 19 ft-lb)
ALBIA0233ZZ
Revision: November 20132014 Altima NAM
Page 2158 of 4801
![NISSAN TEANA 2014 Service Manual
EM-160
< REMOVAL AND INSTALLATION >[VQ35DE]
OIL PAN AND OIL STRAINER
4. Apply a bead of sealant to the cylinder block mating surface of
the upper oil pan to a limited portion as shown.
• Use Genui NISSAN TEANA 2014 Service Manual
EM-160
< REMOVAL AND INSTALLATION >[VQ35DE]
OIL PAN AND OIL STRAINER
4. Apply a bead of sealant to the cylinder block mating surface of
the upper oil pan to a limited portion as shown.
• Use Genui](/img/5/57390/w960_57390-2157.png)
EM-160
< REMOVAL AND INSTALLATION >[VQ35DE]
OIL PAN AND OIL STRAINER
4. Apply a bead of sealant to the cylinder block mating surface of
the upper oil pan to a limited portion as shown.
• Use Genuine Silicone RTV Sealant, or equivalent. Refer to GI-
21, "Recommended Chemical Products and Sealants".
• Be sure the sealant is applied to a limited portion as shown, and the sealant is 4.5 - 5.5 mm (0.177 - 0.217 in) wide.
• Attaching should be done within 5 minutes after coating.
CAUTION:
The components must be instal led within 5 minutes of the
liquid gasket applicat ion. Then allow 30 minutes for the liq-
uid gasket to set before operating the engine.
5. Install new O-rings on the cylinder block and oil pump body. CAUTION:
Do not reuse O-rings.
6. Install the upper oil pan. • Tighten upper oil pan bolts in the order as shown.
• Wait at least 30 minutes before refilling the engine with oil.
7. Install the lower oil pan. Refer to EM-156, "Removal and Installation (Lower Oil Pan)"
.
8. Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
• Before starting engine, check oil/fluid levels incl uding engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-11, "FOR USA AND CANADA : Fluids and Lubricants"
.
• Use procedure below to check for fuel leakage.
• Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak- age at connection points.
• Start engine. With engine speed increased, che ck again for fuel leakage at connection points.
:Engine front
:Cut here
AWBIA1350ZZ
SEM159F
WBIA0327E
LBIA0359E
Revision: November 20132014 Altima NAM
Page 2160 of 4801
![NISSAN TEANA 2014 Service Manual
EM-162
< REMOVAL AND INSTALLATION >[VQ35DE]
IGNITION COIL
IGNITION COIL
Exploded ViewINFOID:0000000009460551
Removal and Installation LHINFOID:0000000009460552
REMOVAL
1. Remove engine room cover. Re NISSAN TEANA 2014 Service Manual
EM-162
< REMOVAL AND INSTALLATION >[VQ35DE]
IGNITION COIL
IGNITION COIL
Exploded ViewINFOID:0000000009460551
Removal and Installation LHINFOID:0000000009460552
REMOVAL
1. Remove engine room cover. Re](/img/5/57390/w960_57390-2159.png)
EM-162
< REMOVAL AND INSTALLATION >[VQ35DE]
IGNITION COIL
IGNITION COIL
Exploded ViewINFOID:0000000009460551
Removal and Installation LHINFOID:0000000009460552
REMOVAL
1. Remove engine room cover. Refer to
EM-143, "Removal and Installation".
2. Disconnect ignition coil harness connector.
3. Remove the ignition coil. CAUTION:
Do not shock ig nition coil.
INSTALLATION
Installation is in the reverse order of removal.
Removal and Installation RHINFOID:0000000009460553
REMOVAL
1. Disconnect the battery negative terminal. Refer to PG-73, "Removal and Installation (Battery)".
2. Remove the intake manifold collector. Refer to EM-146, "Removal and Installation"
.
3. Disconnect ignition coil harness connector.
4. Remove the ignition coil. CAUTION:
Do not shock ig nition coil.
INSTALLATION
Installation is in the reverse order of removal.
1. Ignition coil 2. Spark plug 3. Rocker cover (RH)
4. Rocker cover (LH)
AWBIA1347ZZ
Revision: November 20132014 Altima NAM
Page 2166 of 4801
![NISSAN TEANA 2014 Service Manual
EM-168
< REMOVAL AND INSTALLATION >[VQ35DE]
ROCKER COVER
ROCKER COVER
Exploded ViewINFOID:0000000009460556
Removal and Installation LHINFOID:0000000009460557
REMOVAL
1. Remove front air duct. Refer t NISSAN TEANA 2014 Service Manual
EM-168
< REMOVAL AND INSTALLATION >[VQ35DE]
ROCKER COVER
ROCKER COVER
Exploded ViewINFOID:0000000009460556
Removal and Installation LHINFOID:0000000009460557
REMOVAL
1. Remove front air duct. Refer t](/img/5/57390/w960_57390-2165.png)
EM-168
< REMOVAL AND INSTALLATION >[VQ35DE]
ROCKER COVER
ROCKER COVER
Exploded ViewINFOID:0000000009460556
Removal and Installation LHINFOID:0000000009460557
REMOVAL
1. Remove front air duct. Refer to
EM-144, "Removal and Installation".
2. Remove blow by hose and breather hose from rocker cover.
3. Remove camshaft position sensor (LH). CAUTION:
• Handle carefully to avoid dropping and shocks.
• Do not disassemble.
• Do not allow metal powder to adhere to magnetic part at
sensor tip (A).
• Do not place sensors in a location where they are exposed to magnetism.
4. Disconnect the ignition coil harness connectors.
5. Remove the ignition coils. Refer to EM-162, "Removal and Installation LH"
.
CAUTION:
Do not shock ig nition coils.
1. Camshaft position sensor (LH) 2. O-ring 3. Camshaft position sensor (RH)
4. O-ring 5. Rocker cover (RH) 6. Breather (RH)
7. Blow by vent (RH) 8. Blow by vent (LH) 9. Rocker cover gasket (RH)
10. Rocker cover gasket (LH) 11. B reather (LH) 12. Rocker cover (LH)
Engine front A. Refer to INSTALLATION
AWBIA1339ZZ
ALBIA0258ZZ
Revision: November 20132014 Altima NAM
Page 2167 of 4801
![NISSAN TEANA 2014 Service Manual
ROCKER COVEREM-169
< REMOVAL AND INSTALLATION > [VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
NP
O
6. Remove LH rocker cover bolts from cylinder head in order as
shown.
INSTALLATION
Installation is in the rev NISSAN TEANA 2014 Service Manual
ROCKER COVEREM-169
< REMOVAL AND INSTALLATION > [VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
NP
O
6. Remove LH rocker cover bolts from cylinder head in order as
shown.
INSTALLATION
Installation is in the rev](/img/5/57390/w960_57390-2166.png)
ROCKER COVEREM-169
< REMOVAL AND INSTALLATION > [VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
NP
O
6. Remove LH rocker cover bolts from cylinder head in order as
shown.
INSTALLATION
Installation is in the reverse order of removal.
• Apply sealant to the areas on the front corners using suitable tool.
• Use Genuine Silicone RTV Sealant or equivalent. Refer to EM-
124, "Precaution for Liquid Gasket".
CAUTION:
The components must be instal led within 5 minutes of the liq-
uid gasket application. Then allow 30 minutes for the liquid
gasket to set before operating the engine.
• Tighten the rocker cover bolts in two steps in the order as shown.
Removal and Installation RHINFOID:0000000009460558
REMOVAL
1. Remove the engine room cover. Refer to EM-143, "Removal and Installation".
2. Remove the intake manifold collector. Refer to EM-146, "Removal and Installation"
.
3. Disconnect the ignition coil harness connectors.
4. Remove ignition coils. Refer to EM-162, "Removal and Installation RH"
.
CAUTION: :Engine front
AWBIA0702ZZ
PBIC2474E
: Engine front
Rocker cover bolts
Step 1 : 1.96 N·m (0.20 kg-m, 17 in-lb)
Step 2 : 8.33 N·m (0.85 kg-m, 74 in-lb)
AWBIA0703ZZ
Revision: November 20132014 Altima NAM
Page 2179 of 4801
![NISSAN TEANA 2014 Service Manual
FRONT TIMING CHAIN CASEEM-181
< REMOVAL AND INSTALLATION > [VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
NP
O
• Before starting engine, check oil/fluid levels incl
uding engine coolant and engine oil. If le NISSAN TEANA 2014 Service Manual
FRONT TIMING CHAIN CASEEM-181
< REMOVAL AND INSTALLATION > [VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
NP
O
• Before starting engine, check oil/fluid levels incl
uding engine coolant and engine oil. If le](/img/5/57390/w960_57390-2178.png)
FRONT TIMING CHAIN CASEEM-181
< REMOVAL AND INSTALLATION > [VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
NP
O
• Before starting engine, check oil/fluid levels incl
uding engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-11, "FOR USA AND CANADA : Fluids and Lubricants"
.
• Use procedure below to check for fuel leakage.
• Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
• Start engine. With engine speed increased, check again for fuel leakage at connection points.
• Run engine to check for unusual noise and vibration. NOTE:
If hydraulic pressure inside timing chain tensioner dr ops after removal and installation, slack in the guide
may generate a pounding noise during and just after engine start. However, this is normal. Noise will stop
after hydraulic pressure rises.
• Warm up engine thoroughly to make sure there is no leak age of fuel, exhaust gas, or any oils/fluids including
engine oil and engine coolant.
• Bleed air from passages in lines and hoses, such as in cooling system.
• After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to spec- ified level, if necessary.
• Summary of the inspection items:
*Power steering fluid, brake fluid, etc. Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Transmission/
transaxle fluid CVT Models Leakage Level/Leakage Leakage
Other oils and fluids* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gas — Leakage —
Revision: November 20132014 Altima NAM
Page 2200 of 4801
![NISSAN TEANA 2014 Service Manual
EM-202
< REMOVAL AND INSTALLATION >[VQ35DE]
CAMSHAFT
• Using inside micrometer, measure diameter of valve lifter bore of
cylinder head. Refer to EM-247, "Camshaft"
EM-247, "Camshaft".
• If out of NISSAN TEANA 2014 Service Manual
EM-202
< REMOVAL AND INSTALLATION >[VQ35DE]
CAMSHAFT
• Using inside micrometer, measure diameter of valve lifter bore of
cylinder head. Refer to EM-247, "Camshaft"
EM-247, "Camshaft".
• If out of](/img/5/57390/w960_57390-2199.png)
EM-202
< REMOVAL AND INSTALLATION >[VQ35DE]
CAMSHAFT
• Using inside micrometer, measure diameter of valve lifter bore of
cylinder head. Refer to EM-247, "Camshaft"
EM-247, "Camshaft".
• If out of the specified range, replace the cylinder head assembly.
Calculation of Valve Lifter Clearance
• (Valve lifter clearance) = (hole diameter for valve li fter) – (outer diameter of valve lifter) Refer to EM-247,
"Camshaft".
• If out of specified range, replace either or both valve lifter and cylinder head assembly.
Inspection after InstallationINFOID:0000000009460570
INSPECTION OF CAMSHAFT SPROCKET (INT) OIL GROOVE
WARNING:
• Check when engine is cold so as to pr event burns from any splashing engine oil.
CAUTION:
• Perform this inspection only when DTC P0011 is detected in self-diagnostic results of CONSULT and
it is directed according to inspection procedure of EC section. Refer to EC-716, "Diagnosis Proce-
dure".
1. Check engine oil level. Refer to MA-26, "ENGINE OIL : Inspection"
.
2. Perform the following procedure so as to prevent the engine from being unintentionally started while
checking.
a. Release fuel pressure. Refer to FL-5, "Inspection"
.
b. Disconnect ignition coil and injector harness connectors if practical.
3. Remove intake valve timing control solenoid valve.
4. Crank engine, and then make sure that engine oil comes out from intake valve timing control solenoid valve cover oil hole.
End cranking after checking.
WARNING:
Be careful not to touch rotating parts (drive belts, idler pul-
ley, and crankshaft pulley, etc.).
CAUTION:
• Engine oil may squirt from intake valve timing control solenoid valve installation hole during cranking. Use a
shop cloth to prevent engi ne oil from splashing on
worker, engine components and vehicle.
• Do not allow engine oil to get on rubber components such
as drive belts or engine mount insulators. I mmediately wipe off any splashed engine oil.
5. Clean oil groove between oil strainer and intake valve timing control solenoid valve if engine oil does not come out from intake valve timing control solenoid valve cover oil hole.
6. Remove components between intake valve timing c ontrol solenoid valve and camshaft sprocket (INT),
and then check each oil groove for clogging.
• Clean oil groove if necessary.
7. After inspection, installation of the remaining components is in the reverse order of removal.
SEM867E
KBIA2686E
Revision: November 20132014 Altima NAM
Page 2220 of 4801
![NISSAN TEANA 2014 Service Manual
EM-222
< UNIT REMOVAL AND INSTALLATION >[VQ35DE]
ENGINE ASSEMBLY
• (B): LH cylinder head
25. Remove rear cover plate.
26. Remove the torque converter nuts.
27. Remove nuts of stabilizer connectin NISSAN TEANA 2014 Service Manual
EM-222
< UNIT REMOVAL AND INSTALLATION >[VQ35DE]
ENGINE ASSEMBLY
• (B): LH cylinder head
25. Remove rear cover plate.
26. Remove the torque converter nuts.
27. Remove nuts of stabilizer connectin](/img/5/57390/w960_57390-2219.png)
EM-222
< UNIT REMOVAL AND INSTALLATION >[VQ35DE]
ENGINE ASSEMBLY
• (B): LH cylinder head
25. Remove rear cover plate.
26. Remove the torque converter nuts.
27. Remove nuts of stabilizer connecting rods from struts. Refer to FSU-19, "Exploded View"
.
28. Remove front wheel speed sensors and position aside. Refer to BRC-124, "Removal and Installation -
Front Wheel Sensor".
29. Remove front brake rotors. Refer to BR-36, "BRAKE CALIPER ASSEMBLY : Removal and Installation"
.
30. Remove piston rod nut. Refer to FSU-19, "Exploded View"
.
31. Remove front drive shaft (LH/RH). Refer to FAX-10, "Removal and Installation (LH)"
and FAX-12,
"Removal and Installation (RH)".
32. Remove RH drive shaft center bearing bracket.
33. Remove lower steering column pinch bolt. Refer to ST-33, "Exploded View"
.
34. Remove three way catalyst (manifold) (bank 1) heat shield.
35. Disconnect front and rear engine mounting insulator vacuum hoses.
36. Remove front and rear engine mounting insulator nut.
37. Position a suitable support table under suspension member and engine assembly. TM-206, "Removal and
Installation"
38. Disconnect the engine mounting insulator (LH), upper torque rod, and engine mounting insulator (RH).
39. For additional safety, secure the engine in position with suitable tool.
40. Remove suspension member bolts. Refer to FSU-19, "Exploded View"
.
41. Carefully lower the engine, transaxle assembly and suspension member using Tool, avoiding interference
with the vehicle body.
CAUTION:
• Before and during this procedure, alw ays check if any harnesses are left connected.
• Avoid any damage to, or any oil/grease smearin g or spilling onto the engine mounting insula-
tors.
42. Remove the starter motor. Refer to STR-23, "VQ35DE : Removal and Installation"
.
43. Remove the crankshaft position sensor (POS).
44. Remove engine and transaxle harness.
45. Separate the engine and transaxle and mount the engine on a suitable engine stand.
INSTALLATION
Installation is in the reverse order of removal.
NOTE:
Tighten transmission bolts to specification. Refer to TM-206, "Removal and Installation"
.
INSPECTION AFTER INSTALLATION
• Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-11, "FOR USA AND CANADA : Fluids and Lubricants"
.
• Use procedure below to check for fuel leakage.
• Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
ALBIA0263GB
Tool number : KV101J0010 (J-47242)
Revision: November 20132014 Altima NAM
Page 2257 of 4801
![NISSAN TEANA 2014 Service Manual
EX-2
< PRECAUTION >[QR25DE]
PRECAUTIONS
PRECAUTION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000009951692
The Supplemental Re NISSAN TEANA 2014 Service Manual
EX-2
< PRECAUTION >[QR25DE]
PRECAUTIONS
PRECAUTION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000009951692
The Supplemental Re](/img/5/57390/w960_57390-2256.png)
EX-2
< PRECAUTION >[QR25DE]
PRECAUTIONS
PRECAUTION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000009951692
The Supplemental Restraint System such as “A IR BAG” and “SEAT BELT PRE-TENSIONER”, used along
with a front seat belt, helps to reduce the risk or severi ty of injury to the driver and front passenger for certain
types of collision. Information necessary to service the system safely is included in the SR and SB section of
this Service Manual.
WARNING:
• To avoid rendering the SRS inopera tive, which could increase the risk of personal injury or death in
the event of a collision which would result in air bag inflation, all maintenance must be performed by
an authorized NISS AN/INFINITI dealer.
• Improper maintenance, including in correct removal and installation of the SRS, can lead to personal
injury caused by unintent ional activation of the system. For re moval of Spiral Cable and Air Bag
Module, see the SR section.
• Do not use electrical test equipmen t on any circuit related to the SRS unless instructed to in this
Service Manual. SRS wiring harn esses can be identified by yellow and/or orange harnesses or har-
ness connectors.
PRECAUTIONS WHEN USING POWER TOOLS (AIR OR ELECTRIC) AND HAMMERS
WARNING:
• When working near the Airbag Diagnosis Sensor Unit or other Airbag System sensors with the Igni-
tion ON or engine running, DO NOT use air or electri c power tools or strike near the sensor(s) with a
hammer. Heavy vibration could activate the sensor( s) and deploy the air bag(s), possibly causing
serious injury.
• When using air or electric power tools or hammers , always switch the Ignition OFF, disconnect the
battery and wait at least three minutes before performing any service.
Revision: November 20132014 Altima NAM