ISUZU KB P190 2007 Workshop Repair Manual

Page 111 of 6020

HEATER AND AIR CONDITIONING 1-77













Important Operations - Installation
9. Control Lever Assembly
Air source control cable
RHD
1) Slide the control lever to the left (“CIRC” position).
2) Connect the control cable at the "CIRC" position of the link unit of blower assembly and fix it with the clip.
LHD
1) Slide the control lever to the right (“FRESH” position).
2) Connect the control cable at the "FRESH" position of the link unit of blower assembly and fix it with the clip.

Temperature control cable
RHD
1) Turn the control knob to the right (“FULL HOT” position).
2) Connect the control cable at the “FULL HOT” position of the mix lever of the heater unit and fix it with the clip.
LHD
1) Turn the control knob to the left (“FULL COLD” position).
2) Connect the control cable at the “FULL COLD” position o
f
the mix lever of the heater unit and fix it with the clip.

Air select control cable
RHD
1) Turn the control knob to the left (“VENT” position).
2) Connect the control cable at the “VENT” position of the mode control link of the heater unit and fix it with the clip.
LHD
1) Turn the control knob to the right (“DEF” position).
2) Connect the control cable at the “DEF” position of the mode control link of the heater unit and fix it with the clip.

4. Control Cables
Check control cable operation




BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 112 of 6020

1-78 HEATER AND AIR CONDITIONING

RTW 410MF000201


BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 113 of 6020

HEATER AND AIR CONDITIONING 1-79
CONTROL PANEL ILLUMINATION BULB
REMOVAL AND INSTALLATION





This illustration is based on RHD model
RTW 710MF000401

Removal Steps
1. Control lever assembly
2. Illumination bulb

Installation Steps
2. Illumination bulb
1. Control lever assembly


BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 114 of 6020

1-80 HEATER AND AIR CONDITIONING


RTW 710MH000101
Important Operations - Removal
1. Control lever assembly
Refer to “CONTROL LEVER ASSEMBLY” in this section.

2. Illumination Bulb
To remove the illumination bulb, insert a pliers (long nose) into
the cap at the back of the bulb. Turn the bulb counterclockwise
and pull it free.



BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 115 of 6020

HEATER AND AIR CONDITIONING 1-81
INSPECTION AND REPAIR



840R300005-X

Resistor
As for air-conditioning model, fixed on left (RHD) / right (LHD)
side of the evaporator unit.
As for heater only model, fixed on left (RHD) / right (LHD) side
of the duct placed between blower unit and heater unit.
Replace the resistor with a new on if the coil is found to be
open or if the resistance value deviates from the specified
range.




Terminal Resistance
3 – 2 2.04 Ω
3 – 4 0.88 Ω
3 – 1 0.31 Ω



Blower motor
Check blower motor for smooth rotation.
Connect the battery positive terminal to the No.1 terminal of the
blower motor and negative to the No.2.
Be sure to check to see if the blower motor operates correctly.


BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 116 of 6020

1-82 HEATER AND AIR CONDITIONING


RTW 710SH000801

Fan switch and A/C switch
Check for continuity between fan switch and A/C switch side
connector terminals.
(A/C (4JA1-T, 4JJ1-TC Standard Output, 4JJ1-TC High
Output, 4JK1-TC High Output))

B-13 B-57
Terminal No.
SW .
position
1234 5 6 2 3156
OFF

1
2
3
(FAN SW .)
4
OFF (A/C SW .)ON



RUW 710SH000501
(A/C (4JH1-TC, C24SE)).

B-13 B-57
Terminal
No.
SW .
position
123 4 5 6156
OFF
1
2
3
(FAN SW .)
4
OFF (A/C SW .)ON
D08R300070

(Cooler)

B-13 B-57
Terminal
No.
SW .
position
1 2 3 4 5 6 2 3 10 11
OFF
1
2
3
(FAN SW .)
4
OFF (A/C SW .)ON

BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 117 of 6020

HEATER AND AIR CONDITIONING 1-83


RTW 410SH000201

Electronic thermostat
Check for continuity between electronic thermostat side
connector terminals.
(A/C)


(Cooler)

BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 118 of 6020

1-84 HEATER AND AIR CONDITIONING



RTW 4A0SH000201

Triple Pressure switch
Disconnect pressure switch connector and check for continuity
between pressure switch side connector terminal.


825r300045


Heater and thermo switch relay.
Check for continuity between the relay terminals.
1 - 5 ⋅⋅⋅⋅⋅ No continuity
(W hen battery voltage is applied between 2 - 4 )
1 - 5 ⋅⋅⋅⋅⋅ Continuity
825r300023

Check for continuity between the relay terminals.
1 - 2 ⋅⋅⋅⋅⋅ No continuity
(W hen battery voltage is applied between 3 - 4 )
1 - 2 ⋅⋅⋅⋅⋅ Continuity




BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 119 of 6020

HEATER AND AIR CONDITIONING 1-85
TROUBLESHOOTING
FAN CONTROL KNOB (FAN SWITCH)
Current flows to the blower motor through the Heater & A/C relay (X-11) to activate the rotation of the blower motor
by turning “ON” the fan control knob (fan switch). Blower motor speed is controlled in stages by the resistor, by
operating the switch from “LOW ” to “HIGH.”



RTW 710LF004201

BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page 120 of 6020

1-86 HEATER AND AIR CONDITIONING
BLOWER MOTOR DOES NOT RUN


Replace
YES
• Is No.SBF-6 (30A) (except C24SE) or No.SBF-8
(30A) (C24SE) slow blow fuse OK?
• Is heater & A/C relay (X-11) OK?
YES
• Is resistor OK?
YES
• Is fan control knob (Fan switch) OK?
YES
YES
• Check to see if battery voltage is present at
chassis side connector terminal No.C105-1 is there a
battery voltage?
• Turn the ignition switch "ON" (Engine is running)
• Fan control knob (Fan switch) "ON"
• Is blower motor OK?
YES
Open circuit either between chassis side connector
terminal No.C105-2 and No.C104-3 or No.B13-1 and
body ground No.C-109.
NO
Replace
NO
Replace
NO
NO
Replace control lever
assembly
Replace
NO
NO
Open circuit between
No.SBF-6 (30A) (except
C24SE) or No.SBF-8 (30A)
(C24SE) slow blow fuse and
No.C105-1.


BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007

Page:   < prev 1-10 ... 71-80 81-90 91-100 101-110 111-120 121-130 131-140 141-150 151-160 ... 6020 next >