oil ASTON MARTIN V8 VANTAGE 2010 Owner's Guide
[x] Cancel search | Manufacturer: ASTON MARTIN, Model Year: 2010, Model line: V8 VANTAGE, Model: ASTON MARTIN V8 VANTAGE 2010Pages: 947, PDF Size: 43.21 MB
Page 253 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-5
Maintenance
Upper Intake Manifold Assembly (LHD) - 
Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 
10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure  03.03.AD Coolant - Drain and Refill).
3. Remove cross brace (bolts x4).
Removal RH Side
4. Remove coil cover.
5. Disconnect breather hose (quick fit) move aside.
6. Release harness fir tree clips (x3) from cylinder head and  move aside.
7. Remove fuse box bracket fixings (bolt and nut) (allows  movement).
8. Remove ECM (see Workshop Manual procedure  03.14.BB Engine Contro l Module - RH - Renew).
9. Remove battery lead (1x nut and rubber cover) from  fuse box (2x leads).
10. Remove multiplugs (x10) from fusebox.
11. Remove earth terminal (x1 nut and rubber cover) from  fusebox.
12. Remove fuse box from bracket (bolt x2).
13. Release harness fir tree clips (x3) from engine bracket.
14. Feed harness from inner wing and over engine.
15. Remove purge pipe P-clip (bolt x1) and move pipe  aside.
16. Remove harness bracket from  engine (bolts x2, nut x1).
17. Release fuel feed hose from rail (clip x1) and move  aside.
18. Disconnect heater hose from pipe (quick fit).
19. Release heater hose (clips x2) and EGR vacuum line  (clips x2) from bracket.
20. Release harness from coolant pipe bracket (fir tree x3).
21. Disconnect EGR (x1), fuel ra il pressure sensor (x1) and 
injector (x4) multiplu gs, move harness aside. 22. Remove coolant pipe bracket (nuts x2 and bolts x2). 
23. Disconnect EGR vacuum pipe from sensor and 
manifold, move aside.
Removal LH Side
24. Remove corner cross brace.
25. Remove coil cover.
26. Disconnect breather hoses from cam cover (x2) for  access.
27. Disconnect purge line from  manifold (quickfit) and 
support clip for access.
28. Disconnect heater hose from pipe (quick fit).
29. Release heater hose (x2) and throttle body hose (x2)  from support bracket.
30. Remove booster hose from  manifold and support clip.
31. Remove harness support bracket (bolt x1, nut x2)  release harness clips (fir tree x3).
32. Release pipe support bracket (nuts x2, bolts x2) move  aside.
33. Disconnect injector multiplugs (x4).
34. Unclip injector harness from cam cover (x2).
35. Disconnect IAT multiplug.
36. Disconnect breather hose from manifold (quickfit).
Removal Manifold from Vehicle
37. Disconnect manifold heating hoses (x2).
38. Disconnect throttle body multiplug and harness clip.
39. Disconnect breather pipe quickfits (x2) from air cleaner  duct.
40. Disconnect air cleaner duct (clip x1).
41. Disconnect EGR vacuum hose. 
42. Disconnect EGR pipe union and tie aside.
43. Remove manifold bolts (x 10) (see Figure 1).
Figure 1
44. Remove bolts (x2) bracket to manifold (rear).
45. Move manifold (2x people) forward, remove bolt for  purge line P-clip, remove manifold.
46. Remove gaskets and clean mating faces. 
EGR pipe and exhaust manifold 
flanges.
25 18
Camshaft position (CMP) sensor 7 5
Torque Figures
DescriptionNm.lb/ft
Clearance Figures
Exhaust valve0.23mm - 0.27mm
Inlet Valve clearance 0.18mm - 0.22mm
Repair Operation Time (ROT)
A030113 
Page 254 of 947

Engine Structure (03.01)
3-1-6Workshop ManualIssue 4, November 2008
Removal Manifold Parts
47. Remove EGR valve (bolts x2) and gasket.
48. Remove IAT sensor.
49. Remove throttle body (bolts x4) and gasket.
50. Remove fuel rail (bolts x4) with injectors.
Installation
1. Install fuel rail (bolts x4) with injectors. (fit new O-rings 
to injectors).
2. Install throttle body (bolts x4) and new gasket.
3. Install IAT sensor.
4. Install EGR valve and new gasket.
Installation Manifold to Vehicle
5. Install new gaskets to cylinder block (glue in place).
6. Install manifold (allowing access to install bolt for purge  line P-clip). 
7. Install manifold bolts (x 10) (torque and tightening 
sequence).
8. Install bolts (x2) bracket to manifold (rear).
9. Connect EGR pipe union.
10. Connect EGR vacuum hose. 
11. Connect air cleaner duct (clip x1).
12. Connect breather pipe quickf its (x2) to air cleaner duct.
13. Connect throttle body multiplug and harness clip.
14. Connect manifold heating hoses (x2).
Installation RH Side
15. Connect EGR vacuum pipe to sensor and manifold.
16. Install coolant pipe bracket (bolt x2, nut x2).
17. Connect EGR (x1), fuel rail pressure sensor (x1) and  injector multiplugs (x4).
18. Refit harness to coolant pipe bracket (fir tree x3).
19. Connect heater hose to pipe (quick fit).
20. Refit heater hose (clipx2)  and EGR vacuum lines (clips 
x2) to bracket.
21. Install fuel feed pipe. 
22. Install purge pipe P-clip.
23. Install harness bracket to engine.
24. Feed harness into inner wing area.
25. Install fusebox to bracket. 
26. Install earth lead to fusebox. 
27. Install battery lead to fusebox (1x nut and rubber cover).
28. Install multiplugs to fuse box.
29. Install fusebox bracket fixings.
30. Refit harness fir tree clips to cylinder head.
31. Refit engine breather hose.
32. Install VVT solenoid multiplug, position coil and CMP  harness (1x edge clip).
33. Install ECM (see Workshop Manual procedure 03.14.BB  Engine Control Module - RH - Renew).
34. Install coil cover.
Installation LH Side
35. Connect breather hose to manifold (quickfit). 36. Connect IAT multiplug.
37. Unclip injector harness from cam cover (x2).
38. Connect injector multiplugs (x4).
39. Install pipe support bracket (nuts x2, bolts x2).
40. Install harness support bracket (bolt x1, nut x2) release 
harness clips (fir tree x3).
41. Connect booster hose to  manifold and support clip.
42. Connect heater hose from pipe (quick fit).
43. Install heater hose (x2) and throttle body hose (x2) from  support bracket.
44. Connect purge line to manifold and into support clip.
45. Connect breather hoses (x2) to cam cover.
46. Install coil cover.
47. Install corner cross brace (torque bolts with vehicle on  level ground).
48. Refill coolant (see Workshop Manual procedure  03.03.AD Coolant - Drain and Refill).
49. Install cross brace. (torque  bolts with vehicle on level 
ground).
Upper Intake Manifold Assembly (RHD) 
- Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure  10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure  03.03.AD Coolant - Drain and Refill).
3. Remove cross brace (bolts x4).
Removal RH Side
4. Remove coil cover.
5. Remove corner cross brace.
6. Disconnect breather hose (quick fit) move aside.
7. Remove purge pipe P-clip  (bolt x1) and move pipe 
aside.
8. Remove harness bracket from engine (bolts x2, nut x1).
9. Release fuel feed hose from rail (clip x1) and move  aside.
10. Disconnect heater hose  from pipe (quick fit).
11. Release heater hose (clips x2) and EGR vacuum line  (clips x2) from bracket.
12. Release harness from coolant pipe bracket (fir tree x3).
13. Disconnect EGR (x1), fuel rail pressure sensor (x1) and  injector (x4) multiplugs, move harness aside.
14. Remove coolant pipe bracke t (nuts x2 and bolts x2). 
15. Disconnect EGR vacuum  pipe from sensor and 
manifold, move aside. Note: The installation is not handed
Repair Operation Time (ROT)
ItemCode
Upper Intake Manifold Assembly-
Renew RHD
03.01.BE 
Page 255 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-7
Removal LH Side
16. Remove coil cover.
17. Disconnect breather hoses from cam cover (x2) for 
access.
18. Release harness fir tree clips (x3) from cylinder head and  move aside.
19. Remove fuse box bracket fixings (bolt and nut) (allows  movement).
20. Remove ECM (see Workshop Manual procedure  03.13.ND Module - Powe r Train Control - RHD - 
Renew).
21. Remove battery lead (1x nut and rubber cover) from  fuse box   (2x leads).
22. Remove multiplugs (x10) from fusebox.
23. Disconnect purge line from  manifold (quickfit) and 
support clip for access.
24. Remove earth terminal (1x nut and rubber cover) from  fusebox.
25. Remove fuse box from bracket (bolt x2).
26. Release harness fir tree clips (x3) from engine bracket.
27. Feed harness from inner wing and over engine.
28. Disconnect heater hose from pipe (quick fit).
29. Release heater hose (x2) and throttle body hose (x2)  from support bracket.
30. Remove booster hose from  manifold and support clip.
31. Remove harness support  bracket (bolt x1, nut x2) 
release harness clips (fir tree x3).
32. Release pipe support bracket (nuts x2, bolts x2) move  aside.
33. Disconnect injector  multiplugs (x4).
34. Unclip injector harness from cam cover (x2).
35. Disconnect IAT multiplug.
36. Disconnect breather hose  from manifold (quickfit).
Removal Manifold from Vehicle
37. Remove booster hose from support bracket.
38. Disconnect manifold  heating hoses (x2).
39. Disconnect throttle body multiplug and harness clip.
40. Disconnect breather pipe qu ickfits (x2) from air cleaner 
duct.
41. Disconnect air clea ner duct (clip x1).
42. Disconnect EGR vacuum hose. 
43. Disconnect EGR pipe union and tie aside. 44. Remove manifold bolts (x 10) (see Figure 1)
Figure 1
45. Remove bolts (x2) bracket to manifold (rear).
46. Move manifold (2x people) forward, remove bolt for 
purge line P-clip, remove manifold.
47. Remove gaskets and clean mating faces. 
48. Removal Manifold Parts
49. Remove EGR valve (bolts x2) and gasket.
50. Remove IAT sensor.
51. Remove throttle body (bolts x4) and gasket.
52. Remove fuel rail (bolts x4) with injectors.
Installation
1. Install fuel rail (bolts x4) wi th injectors. (fit new O-rings 
to injectors).
2. Install throttle body (bolts x4) and new gasket.
3. Install IAT sensor.
4. Install EGR valve and new gasket.
5. Installation Manifold to Vehicle
6. Install new gaskets to cyli nder block (glue in place).
7. Install manifold (allowing access to install bolt for purge  line P-clip).
8. Install manifold bolts (x10) (torque and tightening  sequence).
9. Install bolts (x2) bracket to manifold (rear).
10. Connect EGR pipe union.
11. Connect EGR vacuum hose. 
12. Connect air cleaner duct (clip x1).
13. Connect breather pipe quickf its (x2) to air cleaner duct.
14. Connect throttle body multiplug and harness clip.
15. Connect manifold heating hoses (x2).
16. Install booster hose to support bracket.
Installation RH Side
17. Connect EGR vacuum pipe to sensor and manifold.
18. Install coolant pipe bracket (bolt x2, nut x2).
19. Connect EGR (x1), fuel rail  pressure sensor (x1) and 
injector multiplugs (x4).
20. Refit harness to coolant pipe bracket (fir tree x3).
21. Connect heater hose to pipe (quick fit).
22. Refit heater hose (clipx2) and EGR vacuum lines (clips  x2) to bracket.
A030113 
Page 256 of 947

Engine Structure (03.01)
3-1-8Workshop ManualIssue 4, November 2008
23. Install fuel feed pipe. 
24. Install purge pipe P-clip.
25. Install harness bracket to engine.
26. Refit harness fir tree clips to cylinder head.
27. Refit engine breather hose.
28. Install VVT solenoid multiplug, position coil and CMP 
harness (1x edge clip).
29. Install corner cross brace (torque bolts with vehicle on  level ground).
30. Install coil cover.
Installation LH Side
31. Connect breather hose to manifold (quickfit).
32. Connect IAT multiplug.
33. Install injector harness to cam cover (x2).
34. Connect injector multiplugs (x4).
35. Install pipe support bracket (nuts x2, bolts x2).
36. Install harness support bracket (bolt x1, nut x2) release  harness clips (fir tree x3).
37. Connect booster hose to manifold and support clip.
38. Connect heater hose from pipe (quick fit).
39. Install heater hose (x2) and  throttle body hose (x2) from 
support bracket.
40. Connect purge line to manifold and into support clip.
41. Connect breather hoses (x2) to cam cover.
42. Feed harness into inner wing area.
43. Install fusebox to bracket. 
44. Install earth lead to fusebox. 
45. Install battery lead to fusebox (1x nut and rubber cover).
46. Install multiplugs to fuse box.
47. Install fusebox bracket fixings.
48. Install ECM (see Workshop Manual procedure  03.13.ND Module - Power Train Control - RHD - 
Renew).
49. Install coil cover.
50. Refill coolant (see Workshop Manual procedure  03.03.AD Coolant -  Drain and Refill).
51. Install cross brace. (torque  bolts with vehicle on level 
ground).
Upper Intake Manifold Assembly Gasket 
(LHD) - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure  10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure  03.03.AD Coolant -  Drain and Refill). 3. Remove cross brace (bolts x4).
Removal R/H Side
4. Remove coil cover.
5. Disconnect breather hose (quick fit) move aside.
6. Release (alt/inj) harness fir tr
ee clips (x3) from cylinder 
head and move aside.
7. Remove fuse box bracket fixings (bolt and nut) (allows  movement).
8. Remove ECM (see Workshop Manual procedure  03.13.NC Module - Powe r Train Control - Renew).
9. Remove battery lead (x1nut and rubber cover) from fuse  box (2x leads).
10. Remove multiplugs (x10) from fusebox.
11. Remove earth terminal (1x nut and rubber cover) from  fusebox.
12. Remove fuse box from bracket (bolt x2).
13. Release harness fir tree clips (x3) from engine bracket.
14. Feed harness from inner wing and over engine to gain  access to cam cover.
15. Remove purge pipe P-clip  (bolt x1) and move pipe 
aside.
16. Remove harness bracket from engine (bolts x2, nut x1).
17. Release fuel feed hose from rail (clip x1) and move  aside.
18. Disconnect heater hose  from pipe (quick fit).
19. Release heater hose (clips x2) and EGR vacuum line  (clips x2) from bracket.
20. Release (inj/alt) harness from coolant pipe bracket (fir  tree x3).
21. Disconnect EGR (x1), fuel rail pressure sensor (x1) and  injector multiplugs (x4), move harness aside.
22. Remove coolant pipe bracke t (nuts x2 and bolts x2). 
23. Disconnect EGR vacuum  pipe from sensor and 
manifold, move aside.
Removal L/H Side
24. Remove corner cross brace.
25. Remove coil cover.
26. Disconnect breather hoses from cam cover (x2) for  access.
27. Disconnect purge line from  manifold (quickfit) and 
support clip for access.
28. Disconnect heater hose  from pipe (quick fit).
29. Release heater hose (x2) and throttle body hose (x2)  from support bracket.
30. Remove booster hose from manifold and support clip.
31. Remove harness support bracket (bolt x1, nut x2)  release harness clips (fir tree x3).
32. Release pipe support bracket (nuts x2, bolts x2) move  aside.
33. Disconnect injector multiplugs (x4).
34. Unclip injector harness from cam cover (x2).
35. Disconnect IAT multiplug.
36. Disconnect breather hose from manifold (quickfit).
Repair Operation Time (ROT) 
Page 257 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-9
Removal Manifold
37. Disconnect manifold heating hoses (x2).
38. Disconnect throttle body multiplug and harness clip.
39. Disconnect breather pipe qu ickfits (x2) from air cleaner 
duct.
40. Disconnect air clea ner duct (clip x1).
41. Disconnect EGR vacuum hose. 
42. Disconnect EGR pipe union and tie aside.
43. Remove manifold bolts (x 10) (see Figure 1).
Figure 1
44. Remove bolts (x2) bracket to manifold (rear).
45. Move manifold (2x people) forward, remove bolt for  purge line P-clip, remove manifold.
46. Remove gaskets and clean mating faces. 
Installation
Manifold to Vehicle
1. Install new gaskets to cylinder block (glue in place).
2. Install manifold (allowing access to install bolt for purge  line P-clip). 
3. Install manifold bolts (x10) (torque and tightening  sequence).
4. Install bolts (x2) bracket to manifold (rear).
5. Connect EGR pipe union.
6. Connect EGR vacuum hose. 
7. Connect air cleaner duct (clip x1).
8. Connect breather pipe quickf its (x2) to air cleaner duct.
9. Connect throttle body multiplug and harness clip.
10. Connect manifold heating hoses (x2).
Installation RH Side
11. Connect EGR vacuum pipe to sensor and manifold.
12. Install coolant pipe bracket (bolt x2, nut x2).
13. Connect EGR (x1), fuel rail  pressure sensor (x1) and 
injector multiplugs (x4).
14. Refit (inj/alt) harness to coolant pipe bracket (fir tree x3).
15. Connect heater hose to pipe (quick fit).
16. Refit heater hose (clipx2) and EGR vacuum lines (clips  x2) to bracket.
17. Install fuel feed pipe. 
18. Install purge pipe P-clip.
19. Install harness bracket to engine. 20. Feed harness into inner wing area.
21. Install fusebox to bracket. 
22. Install earth lead to fusebox. 
23. Install battery lead to fusebox (1x nut and rubber cover).
24. Install multiplugs to fuse box.
25. Install fusebox bracket fixings.
26. Refit harness fir tree clips to cylinder head.
27. Refit engine breather hose.
28. Install VVT solenoid multip
lug, position coil and CMP 
harness (1x edge clip).
29. Install ECM (see Workshop Manual procedure 03.13.NC  Module - Power Train Control - Renew).
30. Install coil cover.
Installation LH Side
31. Connect breather hose  to manifold (quickfit).
32. Connect IAT multiplug.
33. Unclip injector harness from cam cover (x2).
34. Connect injector multiplugs (x4).
35. Install pipe support bracket (nuts x2, bolts x2).
36. Install harness support bracket (bolt x1, nut x2) release  harness clips (fir tree x3).
37. Connect booster hose to manifold and support clip.
38. Connect heater hose from pipe (quick fit).
39. Install heater hose (x2) and throttle body hose (x2) from  support bracket.
40. Connect purge line to manifold and into support clip.
41. Connect breather hoses (x2) to cam cover.
42. Install coil cover.
43. Install corner cross brace (t orque bolts with vehicle on 
level ground).
44. Refill coolant (see Workshop Manual procedure  03.03.AD Coolant - Drain and Refill).
45. Install cross brace. (torque  bolts with vehicle on level 
ground).
Upper Intake Manifold Assembly Gasket 
(RHD) - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure  10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure  03.03.AD Coolant - Drain and Refill).
3. Remove cross brace (bolts x4).
Removal RH Side
4. Remove coil cover.
5. Remove corner cross brace.
A030113
Note: The installation is not  handed
Repair Operation Time (ROT) 
Page 258 of 947

Engine Structure (03.01)
3-1-10Workshop ManualIssue 4, November 2008
6. Disconnect breather hose (quick fit) move aside.
7. Remove purge pipe P-clip (bolt x1) and move pipe 
aside.
8. Remove harness bracket from engine (bolts x2, nut x1).
9. Release fuel feed hose from rail (clip x1) and move  aside.
10. Disconnect heater hose from pipe (quick fit).
11. Release heater hose (clips x2) and EGR vacuum line  (clips x2) from bracket.
12. Release harness from coolant pipe bracket (fir tree x3).
13. Disconnect EGR (x1), fuel rail pressure sensor (x1) and  injector (x4) multiplugs, move harness aside.
14. Remove coolant pipe bracket (nuts x2 and bolts x2). 
15. Disconnect EGR vacuum pipe from sensor and  manifold, move aside.
Removal LH Side
16. Remove coil cover.
17. Disconnect breather hoses from cam cover (x2) for  access.
18. Release harness fir tree clips (x3) from cylinder head and  move aside.
19. Remove fuse box bracket fixings (bolt and nut) (allows  movement).
20. Remove ECM (see Workshop Manual procedure  03.13.ND Module - Power Train Control - RHD - 
Renew).
21. Remove battery lead (1x nu t and rubber cover) from 
fuse box   (2x leads).
22. Remove multiplugs (x10) from fusebox.
23. Disconnect purge line from manifold (quickfit) and  support clip for access.
24. Remove earth terminal (1x nut and rubber cover) from  fusebox.
25. Remove fuse box from bracket (bolt x2).
26. Release harness fir tree clips (x3) from engine bracket.
27. Feed harness from inner wing and over engine.
28. Disconnect heater hose from pipe (quick fit).
29. Release heater hose (x2) and throttle body hose (x2)  from support bracket.
30. Remove booster hose from manifold and support clip.
31. Remove harness support bracket (bolt x1, nut x2)  release harness clips (fir tree x3).
32. Release pipe support brack et (nuts x2, bolts x2) move 
aside.
33. Disconnect injector multiplugs (x4).
34. Unclip injector harness from cam cover (x2).
35. Disconnect IAT multiplug.
36. Disconnect breather hose  from manifold (quickfit).
Removal Manifold from Vehicle
37. Remove booster hose from support bracket.
38. Disconnect manifold  heating hoses (x2).
39. Disconnect throttle body multiplug and harness clip. 40. Disconnect breather pipe qu
ickfits (x2) from air cleaner 
duct.
41. Disconnect air cleaner duct (clip x1).
42. Disconnect EGR vacuum hose. 
43. Disconnect EGR pipe union and tie aside.
44. Remove manifold bolts (x 10) (see Figure 1)
Figure 1
45. Remove bolts (x2) bracket to manifold (rear).
46. Move manifold (2x people) forward, remove bolt for  purge line P-clip,  remove manifold.
47. Remove gaskets and clean mating faces. 
Installation
1. Install new gaskets to cylinder block (glue in place).
2. Install manifold (allowing access to install bolt for purge  line P-clip). 
3. Install manifold bolts (x 10) (torque and tightening 
sequence).
4. Install bolts (x2) bracket to manifold (rear).
5. Connect EGR pipe union.
6. Connect EGR vacuum hose. 
7. Connect air cleaner duct (clip x1).
8. Connect breather pipe quickfits (x2) to air cleaner duct.
9. Connect throttle body multiplug and harness clip.
10. Connect manifold heating hoses (x2).
11. Install booster hose to support bracket.
Installation RH Side
12. Connect EGR vacuum pipe  to sensor and manifold.
13. Install coolant pipe bracket (bolt x2, nut x2).
14. Connect EGR (x1), fuel rail pressure sensor (x1) and  injector multiplugs (x4).
15. Refit harness to coolant pipe bracket (fir tree x3).
16. Connect heater hose  to pipe (quick fit).
17. Refit heater hose (clipx2)  and EGR vacuum lines (clips 
x2) to bracket.
18. Install fuel feed pipe. 
19. Install purge pipe P-clip.
20. Install harness bracket to engine.
21. Refit harness fir tree clips to cylinder head.
22. Refit engine breather hose.
A030113 
Page 259 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-11
23. Install VVT solenoid multiplug, position coil and CMP 
harness (1x edge clip).
24. Install corner cross brace (t orque bolts with vehicle on 
level ground).
25. Install coil cover.
Installation LH Side
26. Connect breather hose  to manifold (quickfit).
27. Connect IAT multiplug.
28. Install injector harness to cam cover (x2).
29. Connect injector multiplugs (x4).
30. Install pipe support bracket (nuts x2, bolts x2).
31. Install harness support bracket (bolt x1, nut x2) release  harness clips (fir tree x3).
32. Connect booster hose to manifold and support clip.
33. Connect heater hose from pipe (quick fit).
34. Install heater hose (x2) and throttle body hose (x2) from  support bracket.
35. Connect purge line to mani fold and into support clip.
36. Connect breather hoses (x2) to cam cover.
37. Feed harness into inner wing area.
38. Install fusebox to bracket. 
39. Install earth lead to fusebox. 
40. Install battery lead to fusebox (1x nut and rubber cover).
41. Install multiplugs to fuse box.
42. Install fusebox bracket fixings.
43. Install ECM (see Workshop Manual procedure  03.13.ND Module - Powe r Train Control - RHD - 
Renew)
44. Install coil cover.
45. Refill coolant (see Workshop Manual procedure  03.03.AD Coolant - Drain and Refill).
46. Install cross brace. (torque  bolts with vehicle on level 
ground).
Intake Manifold Assembly - Remove for 
Access and Refit (With Engine Removed
)
Removal
1. Remove RH coil cover.
2. Disconnect breather hose (quick fit).
3. Release alternator and injector harness fir tree clips (x3)  from cylinder head.
4. Remove nut and bolts (x2)  securing harness bracket to 
engine, remove bracket.
5. Release heater hose (clips x2) and EGR vacuum line  (clips x2) from bracket.
6. Release alternator and injector harness fir tree clips (x3)  from coolant pipe bracket. 7. Disconnect multiplugs from EGR valve, fuel rail pressure 
sensor and injectors (x4).
8. Remove nuts (x2) and bolts  (x2) securing coolant pipe 
bracket, remove bracket.
9. Disconnect EGR vacuum pipe from sensor and  manifold.
10. Remove LH coil cover.
11. Disconnect breather hoses (x2) from LH engine cover.
12. Disconnect purge line from  manifold (quickfit) and 
support clip for access.
13. Disconnect heater hose from pipe (quick fit).
14. Release heater hose (x2) and throttle body hose (x2)  from support bracket.
15. Remove bolt and nuts (x2) securing harness support  bracket, release harness clips (fir tree x3). Remove 
bracket.
16. Remove nuts (x2) and bolts (x2) pipe support bracket.
17. Disconnect injector multiplugs (x4).
18. Release injector harness clip s (x2) from LH engine cover.
19. Disconnect IAT multiplug.
20. Disconnect breather hose from manifold (quickfit).
21. Disconnect manifold heating hoses (x2).
22. Disconnect throttle body multiplug and harness clip.
23. Disconnect EGR vacuum hose. 
24. Loosen and disconnect EGR pipe union from EGR valve.
25. Remove bolts (x2) securing  EGR pipe to RH exhaust 
manifold, remove pi pe, discard gasket.
26. Progressively loosen and remove bolts (x 10) securing  intake manifold to cylinder heads (see Figure 1).
Figure 1
27. Carefully remove intake ma nifold from cylinder heads. 
28. Remove and discard gaskets (x2).
Installation
1. Clean intake manifold and mating faces on cylinder  heads.
2. Install new gaskets to cyli nder block (glue in place).
3. Install intake manifold (allowing access to install bolt for  purge line P-clip). 
4. Install and torque tighten in take manifold bolts (x10) in 
the correct sequence.
5. Clean EGR pipe and mating face on exhaust manifold.
Repair Operation Time (ROT)
A030113 
Page 260 of 947

Engine Structure (03.01)
3-1-12Workshop ManualIssue 4, November 2008
6. Install new gasket on exhaust manifold.
7. Install EGR pipe to exhaust manifold and EGR valve., 
8. Install EGR pipe to EGR valve, install pipe union. Do not 
torque tighten at this stage.
9. Install and torque tighten bolts (x2), EGR pipe to exhaust  manifold. Torque tighten pipe union.
10. Connect EGR vacuum hose. 
11. Connect throttle body multiplug and harness clip.
12. Connect manifold heating hoses (x2).
13. Connect EGR vacuum pipe to sensor and manifold.
14. Install coolant pipe bracket, install and torque tighten  bolts (x2) and nuts (x2).
15. Connect multiplugs to EGR  valve, fuel rail pressure 
sensor and injectors.
16. Install alternator and injector harness fir tree clips (x3) to  coolant pipe bracket.
17. Install heater hose clips (x2) and EGR vacuum lines clips  (x2) to bracket.
18. Install harness bracket to engine.
19. Refit harness fir tree clips to cylinder head.
20. Refit engine breather hose.
21. Install VVT solenoid multiplug, position coil and CMP  harness (1x edge clip).
22. Install coil cover.
23. Connect breather hose to manifold (quickfit).
24. Connect IAT multiplug.
25. Secure injector harness clips (x2) to LH engine cover.
26. Connect injector multiplugs (x4).
27. Install pipe support bracket,  install and tighten nuts (x2 
and bolts(x2).
28. Install harness support bracket, install and tighten bolt  (x1) and, nut (x1). 
29. Install heater hoses (x2) an d throttle body hoses (x2) in 
support bracket.
30. Connect breather hoses (x2) to engine cover.
31. Install coil cover.
RH/LH Cylinder Head Gasket - Renew
Removal
1. Re-install front subframe to body, install and tighten  bolts (x6), remove support trolley.
2. Install and tighten engine mounting nuts (x2).
3. With assistance, remove engine lifting beam (SPX  M553D). 4. Remove SAI pump and bracket assembly (see Workshop 
Manual procedure 03.08.DB/03.08.DJ Pump and 
Bracket Assembly - Secondary Air Injection - Renew).
5. Disconnect multiplugs (x2) from knock sensors.
6. Disconnect multiplug from camshaft timing sensor.
7. Remove RH/LH exhaust manifold (see Workshop  Manual procedure 09.00.CC/09.00.CD Gasket - 
Exhaust Manifold - RH/LH - Renew).
8. Remove RH/LH intake camshaft (see Workshop Manual  procedure 03.09.AT/03.09.AV Camshaft - Intake - RH/
LH - Renew).
9. Remove RH exhaust camshaft bearing cap retaining  bolts (x10) evenly and in  stages (see Figure 1). 
Figure 1
10. Note their orientation and markings and remove the RH 
exhaust camshaft bearing caps.
11. Remove RH exhaust camshaft (see Figure 2).   
12. Remove bolts (x2) securing  front end of RH cylinder 
head to cylinder block.
Repair Operation Time (ROT)
Figure 2
A0309258
A0309260 
Page 261 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-13
13. Remove bolts (x10), evenly and in stages securing RH 
cylinder head to cylinder block (see Figure 3).   
Figure 3
14. With assistance, remove RH  cylinder head assembly.
15. Remove and discard cylinder head gasket.
Installation
1. Thoroughly clean RH cylind er head face and retaining 
bolt pockets.
2. Thoroughly clean RH cylinder block face.
3. Thoroughly clean and dry RH  cylinder head retaining 
bolts.
4. Install new RH cylinder gasket, locate on dowels.
5. With assistance, install RH cylinder head, locate on  dowels.
6. Install and torque tighten cylinder head bolts (x12) in  the correct sequence.
7. Lubricate RH exhaust camsha ft journals, camshaft lobes, 
bearing surfaces on cylinder head and bearing caps with 
clean engine oil.
8. Install RH exhaust camshaft, install bearing caps (x5) in  their original positions.
9. Install bolts (x10) and torque tighten in the sequence  specified.
10. Install sprocket retaining Torx bolt in camshaft.
11. Rotate camshaft accordingly and check each valve  clearance using feeler gauges.
12. Remove sprocket retaining Torx bolt.
13. Install RH/LH intake cams haft (see Workshop Manual 
procedure 03.09.AT/03.09.AV Camshaft - Intake - RH/
LH - Renew).
14. Install timing chain tensioni ng tool (303-532) into RH 
exhaust camshaft sprocket.
15. Apply a force to the tool (303-532) in an anti-clockwise  direction and torque tighten  RH sprocket Torx bolts. 
Remove special tool.
16. Connect multiplug to cam a haft timing sensor.
17. Connect multiplugs (x2) to knock sensors.
18. Install SAI pump and bracket assembly (see Workshop  Manual procedure 03.08.DB/03.08.DJ Pump and 
Bracket Assembly - Secondary Air Injection - Renew). 19. Install RH/LH exhaust manifold (see Workshop Manual 
procedure 09.00.CC/09.00.CD Gasket - Exhaust 
Manifold - RH/LH - Renew).
20. With assistance, position engine support beam (SPX  M553D) and secure to engine.
21. Position trolley, support front subframe, remove bolts  (x6), raise vehicle, remove trolley.
22. Install and torque tighten engine mounting nuts (x2).
RH/LH Cylinder Head - Overhaul
1. Remove cylinder head gasket - RH (see Workshop  Manual procedure 03.01.GU  Gasket - Cylinder Head - 
RH - Renew).
2. Remove Torx screws (x2) se curing EGR tube to cylinder 
head, remove tube.
3. Remove and discard gasket.
4. Remove bolt securing camshaf t timing sensor to cylinder 
head, remove sensor.
5. Remove bolts (x2) securing knock sensors (x2) to  cylinder head, remove sensors.
6. Remove spark plugs from cylinder head.
7. Remove selective tappet buckets, keep in their fitted  order.
8. Position valve spring compressor, compress valve spring  (see Figure 1).
Figure 1
9. Remove collets (x2), releas e/remove spring compressor, 
collect collar and valve spring.
10. Remove valve from cylinder.
11. Remove valve stem oil seal.
12. Repeat procedure for remaining valve assemblies.
13. Keep valves and springs in their fitted order.
A0310319
Repair Operation Time (ROT)
A0301310 
Page 262 of 947

Engine Structure (03.01)
3-1-14Workshop ManualIssue 4, November 2008
14. Inspect cylinder head face for warpage, across centre 
and from corner to corner.
15. Check condition and measure free length of valve  springs.
16. Decarbonise combustion chambers and exhaust ports.
17. Measure valve stem diameters.
18. Use new valves and check valve guide clearance.
Installation
1. Clean cylinder head face and inlet/exhaust manifold  faces. Use and air line to completely dry cylinder head 
surfaces.
2. Lubricate and install intake and exhaust valves (x16).
3. Install valve stem oil seals.
4. Install valve springs and collars.
5. Using valve spring compressor, compress valve spring,  install collets. 
6. Release/remove spring compressor.
7. Repeat procedure for remaining valve assemblies.
8. Install selective tappet buckets in their original fitted  positions.
9. Lubricate intake camshaft bearings and journals with  clean engine oil. 
10. Install intake camshaft, install bearing caps (x5), install  bolts (x10).
11. Torque tighten bearing cap bolts in the correct  sequence.
12. Lubricate exhaust camshaft be arings and journals with 
clean engine oil. 
13. Install exhaust camshaft, install bearing caps (x5), install  bolts (x10).
14. Torque tighten bearing cap bolts in the correct  sequence.
15. Install camshaft sprocket Torx bolts in intake and  exhaust camshafts.
16. Rotate intake camshaft clockwise, check and log each  valve clearance using feeler gauges.
17. Calculate the correct tappet bucket grade.
18. Repeat procedure for exhaust valve clearances.
19. Remove bearing cap bolts (x10), remove bearing caps  (x5), remove intake camshaft.
20. Remove tappet buckets, install selected tappet buckets. 
21. Repeat procedure for exhaust valve clearances.
22. Install intake camshaft, install bearing caps (x5), install  bolts (x10).
23. Torque tighten bearing cap bolts in the correct  sequence.
24. Rotate intake camshaft clockwise, re-check each valve  clearance using feeler gauges.
25. Repeat procedure and re-check exhaust valve  clearances.
26. Remove camshaft sprocket Torx bolts (x2).
27. Remove bearing cap bolts (x10), remove bearing caps  (x5), remove intake camshaft. 28. Remove bearing cap bolts (x10), remove bearing caps 
(x5), remove exhaust camshaft.
29. Clean EGR tube.
30. Install new gasket, install EGR tube to cylinder head,  install and torque tighten Torx screws (x2).
31. Clean Knock sensors (x2).
32. Install knock sensors (x2) to cylinder head, install and  torque tighten bolts (x2).
33. Clean camshaft timing sensor.
34. Install camshaft timing sensor, install and torque tighten  bolt.
35. Install spark plugs.
36. Install cylinder head gasket RH (see Workshop Manual  procedure 03.01.GU Gasket - Cylinder Head - RH - 
Renew).
Cylinder Head (Engine Set) - Overhaul
Removal
1. Remove cylinder head gaskets - engine set (see Workshop Manual procedure 03.10.AL Gasket - 
Cylinder Head - Engine Set - Renew).
2. Remove Torx screws (x4) securing EGR tubes to cylinder  heads, remove tubes.
3. Remove and discard gaskets.
4. Remove bolts (x2) securing camshaft timing sensors to  cylinder heads, remove sensors.
5. Remove bolts (x4) securing knock sensors (x4) to  cylinder heads, remove sensors.
6. Remove spark plugs from cylinder heads (x8).
7. Remove selective tappet buckets, keep in their fitted  order.
8. Position valve spring compressor, compress valve  springs.
9. Remove collets, release/remove spring compressor,  collect collars and valve springs.
10. Remove valves from cylinder heads.
11. Remove valve stem oil seals.
12. Keep valves and springs in their fitted order.
13. Inspect cylinder head face for warpage, across centre  and from corner to corner.
14. Check condition and measure free length of valve  springs.
15. Decarbonise combustion chambers and exhaust ports.
16. Use new valves and check valve guide clearances.
Installation
1. Clean cylinder head face and inlet/exhaust manifold  faces. Use and air line to completely dry cylinder head 
surfaces.
Repair Operation Time (ROT)
ItemCode
Cylinder Head (Engine Set)-Overhaul LHD03.01.GZ
Cylinder Head (Engine Set)-Overhaul RHD03.01.FZ