check engine DODGE NEON 1999 Service Owner's Guide

DODGE NEON 1999 Service Owner's Guide NEON 1999 DODGE DODGE https://www.carmanualsonline.info/img/12/56911/w960_56911-0.png DODGE NEON 1999 Service Owner's Guide

Page 238 of 1200

DODGE NEON 1999  Service Owners Guide Remember that an undercharged battery is often
caused by:
²Accessories being left on with the engine not
running
²A faulty or improperly adjusted switch that
allows a lamp to stay on. See Ignition-O

Page 242 of 1200

DODGE NEON 1999  Service Owners Guide These tests will show the amount of voltage drop
across the generator output wire from the generator
output (B+) terminal to the battery positive post.
They will also show the amount of voltage drop f

Page 243 of 1200

DODGE NEON 1999  Service Owners Guide performed at each (- ground) connection in this cir-
cuit to locate the excessive resistance.
(7) Testing (+ positive) circuitry:
(a) Touch the positive lead of voltmeter directly
to battery negativeP

Page 245 of 1200

DODGE NEON 1999  Service Owners Guide tail harness is attached directly to the sensor. The
opposite end of this harness connects the sensor to
the engine wiring harness.
(2) Disconnect the two-wire pigtail harness from
the engine harness.

Page 250 of 1200

DODGE NEON 1999  Service Owners Guide IGNITION SYSTEM
CONTENTS
page page
GENERAL INFORMATION
INTRODUCTION......................... 1
DESCRIPTION AND OPERATION
AUTOMATIC SHUTDOWN RELAY............ 3
CAMSHAFT POSITION SENSOR............. 4

Page 251 of 1200

DODGE NEON 1999  Service Owners Guide The major difference between the two engines is
component location which affects the ignition system
service procedures. There are various sensors that
are in different locations due to a different cy

Page 256 of 1200

DODGE NEON 1999  Service Owners Guide train Control Module (PCM) with an input signal
(voltage). The signal represents throttle blade posi-
tion. As the position of the throttle blade changes,
the resistance of the TPS changes.
The PCM su

Page 257 of 1200

DODGE NEON 1999  Service Owners Guide Use a new spark plug and spark plug cable
for the following test.
(1) Insert a new spark plug into the new spark
plug boot. Ground the plug to the engine (Fig. 17).
Do not hold with your hand.
(2) Sta

Page 258 of 1200

DODGE NEON 1999  Service Owners Guide ply circuit shorts to ground, neither sensor will pro-
duce a signal (output voltage to the PCM).
When the ignition key is turned and left in the On
position, the PCM automatically energizes the Auto

Page 259 of 1200

DODGE NEON 1999  Service Owners Guide Connect the DVM between the center and sensor
ground terminal. Refer to Group 8W - Wiring Dia-
grams for correct pinout.
With the ignition switch in the ON position, check
the output voltage at the ce