belt DODGE NEON 1999 Service Workshop Manual

DODGE NEON 1999 Service Workshop Manual NEON 1999 DODGE DODGE https://www.carmanualsonline.info/img/12/56911/w960_56911-0.png DODGE NEON 1999 Service Workshop Manual

Page 734 of 1200

DODGE NEON 1999  Service Workshop Manual (8) Install A/C compressor and hoses. Refer to
Group 24, Heater and Air Conditioning for procedure.
(9) Install accessory drive belts. Refer to Group 7,
Cooling System Accessory Drive Section for belt

Page 735 of 1200

DODGE NEON 1999  Service Workshop Manual (4) Apply MopartStud and Bearing Mount or
equivalent to a new tube approximately 1 mm from
theendina3mmwide area.
(5) Install sealer end of tube into the cylinder
head. Then carefully install the tube

Page 736 of 1200

DODGE NEON 1999  Service Workshop Manual ²Zero the dial indicator.
²Move camshaft forward to limits of travel and
read dial indicator.
²End play travel: 0.13 - 0.33 mm (0.005 - 0.013
in.).
(5) Install front camshaft seal. Camshaft must be

Page 737 of 1200

DODGE NEON 1999  Service Workshop Manual NOTE: Inspect the rocker arm for scoring, wear on
the roller or damage to the rocker arm (Fig. 24)
Replace if necessary. Check the location where the
rocker arms mount to the shafts for wear or dam-
a

Page 738 of 1200

DODGE NEON 1999  Service Workshop Manual INSTALLATION
(1) Install valve seal/valve spring seat assembly
as outlined in the Valve Installation procedure in this
section.
(2) Using Special Tool MD-998772A compress valve
springs only enough to

Page 740 of 1200

DODGE NEON 1999  Service Workshop Manual For the rest of installation, reverse removal proce-
dure.
(3) Perform camshaft and crankshaft timing
relearn procedure as follows:
²Connect the DRB scan tool to the data link
(diagnostic) connector.

Page 741 of 1200

DODGE NEON 1999  Service Workshop Manual CAMSHAFT OIL SEAL
REMOVAL
CAUTION: Do Not Rotate the camshaft or crank-
shaft when timing belt is removed damage to the
engine may occur.
(1) Remove front timing belt cover, timing belt and
tensioner

Page 742 of 1200

DODGE NEON 1999  Service Workshop Manual REMOVALÐTIMING BELT
(1) Remove accessory drive belts. Refer to Group 7,
Cooling System for procedure outlined in that sec-
tion.
(2) Raise vehicle on a hoist and remove right inner
splash shield (Fig

Page 743 of 1200

DODGE NEON 1999  Service Workshop Manual (3) Remove crankshaft damper bolt. Remove
damper using the large side of Special Tool 1026 and
insert 6827-A (Fig. 42).
(4) Lower vehicle and place a jack under engine.
(5) Remove right engine mount.

Page 744 of 1200

DODGE NEON 1999  Service Workshop Manual through the body and plunger to retain plunger in
place until tensioner is installed.
(4) Set crankshaft sprocket to TDC by aligning the
sprocket with the arrow on the oil pump housing,
then back off