torque DODGE NEON 1999 Service Workshop Manual

DODGE NEON 1999 Service Workshop Manual NEON 1999 DODGE DODGE https://www.carmanualsonline.info/img/12/56911/w960_56911-0.png DODGE NEON 1999 Service Workshop Manual

Page 135 of 1200

DODGE NEON 1999  Service Workshop Manual INSTALL
(1) Install park brake cable into floor pan of vehi-
cle making sure sealing grommet is installed in floor
pan as far as possible to insure proper seal.
(2) Install park brake cable into brake

Page 136 of 1200

DODGE NEON 1999  Service Workshop Manual to one-half specified torque. Then repeat pattern,
fully tightening stud nuts to 135 N´m (100 ft. lbs.).
(11) Lower vehicle.
(12) Grasp park brake cable to floor pan seal
grommet (Fig. 157) by hand,

Page 138 of 1200

DODGE NEON 1999  Service Workshop Manual (9) InstallA NEWhub and bearing assembly
retaining nut. Torque the hub and bearing assembly
retaining nut to 168 N´m (124 ft. lbs.).
(10) Install hub and bearing assembly dust cap.
(11) Install rear

Page 143 of 1200

DODGE NEON 1999  Service Workshop Manual (12) Inspect caliper piston for pitting, scratches, or
any physical damage. Replace piston if there is evi-
dence of scratches, pitting or physical damage.
CALIPER ASSEMBLY
CAUTION: Excessive vise pre

Page 148 of 1200

DODGE NEON 1999  Service Workshop Manual (3) Remove the rubber plug from the adjusting
hole in the brake shoe backing plate on both sides of
the vehicle.
(4)Driver (left) side park brake shoe adjust-
ment procedure.Insert a medium size screw

Page 149 of 1200

DODGE NEON 1999  Service Workshop Manual DESCRIPTION TORQUE
MASTER CYLINDER:
To Vacuum Booster Mounting Nut.28 N´m (250 in. lbs.)
BRAKE BOOSTER:
To Dash Panel Mounting Nuts . .28 N´m (250 in. lbs.)
REAR WHEEL CYLINDER:
To Support Plate Mou

Page 150 of 1200

DODGE NEON 1999  Service Workshop Manual ANTILOCK BRAKE SYSTEM±TEVES MARK 20
INDEX
page page
DESCRIPTION AND OPERATION
ABS BRAKE SYSTEM COMPONENTS........ 71
ABS BRAKES OPERATION AND VEHICLE
PERFORMANCE....................... 69
ABS COMPONE

Page 162 of 1200

DODGE NEON 1999  Service Workshop Manual For the specific procedure covering the inspection
of the brake fluid level and adding brake fluid to the
reservoir, refer to the Service Adjustments Section in
this group of the service manual.
BLEED

Page 165 of 1200

DODGE NEON 1999  Service Workshop Manual INSTALL
(1) Install the ICU on the mounting bracket.
(2) Install the 3 bolts attaching the HCU to the
mounting bracket (Fig. 25).
(3) Tighten the 3 mounting bolts to a torque of 11
N´m (97 in. lbs.)

Page 166 of 1200

DODGE NEON 1999  Service Workshop Manual CAUTION: When lubricating master cylinder push
rod, use only Mopar Silicone Dielectric Compound.
Using any other type of grease or lubricant on the
push rod, will not provide adequate long term lubri-