hose DODGE NEON 2000 Service Workshop Manual

DODGE NEON 2000 Service Workshop Manual NEON 2000 DODGE DODGE https://www.carmanualsonline.info/img/12/56910/w960_56910-0.png DODGE NEON 2000 Service Workshop Manual

Page 197 of 1285

DODGE NEON 2000  Service Workshop Manual COOLANTÐADDING ADDITIONAL
NOTE: The radiator cap should not be removed.
When additional coolant is needed, it should be
added to the coolant recovery/reserve container (Fig.17). Use only 50/50 concen

Page 199 of 1285

DODGE NEON 2000  Service Workshop Manual (4) Rotate pump by hand to check for freedom of
movement.
(5) Install rear timing belt cover and camshaft
sprocket.
(6) Install timing belt tensioner and timing belt.
Refer to Group 9, Engine for proc

Page 200 of 1285

DODGE NEON 2000  Service Workshop Manual (3) Remove thermostat/engine outlet connector
bolts (Fig. 22).
(4) Remove thermostat and O-ring assembly.
INSTALLATION
(1) Clean all sealing surfaces.
(2) Place the new thermostat assembly into the
th

Page 201 of 1285

DODGE NEON 2000  Service Workshop Manual (10) Radiator can now be lifted free from engine
compartment.Care should be taken not to dam-
age radiator cooling fins or water tubes during
removal.
INSTALLATION
(1) Slide radiator down into positio

Page 202 of 1285

DODGE NEON 2000  Service Workshop Manual INSTALLATION
(1) Install the fan module into the clips on the
lower radiator tank.
(2) Install the fan module retaining screws and
tighten to 7.5 N´m (65 in. lbs.).
(3) Connect fan module electrical

Page 203 of 1285

DODGE NEON 2000  Service Workshop Manual (2) Connect recovery hose to water outlet connec-
tor/thermostat housing (Fig. 29).
(3) Fill container to proper level. Refer to Cooling
System Refilling in this section.
ENGINE BLOCK HEATER
REMOVAL
(

Page 207 of 1285

DODGE NEON 2000  Service Workshop Manual SHROUD
REMOVAL
(1) Remove cooling fan module. Refer to procedure
in this section.
(2) Remove fan and fan motor as previously
described.
INSTALLATION
(1) Install fan motor and fan as previously
describ

Page 208 of 1285

DODGE NEON 2000  Service Workshop Manual (3) Remove engine thermostat and reinstall ther-
mostat housing. A gasket may be needed to seal thehousing to cylinder head because the seal is part of
thermostat.
(4) Install suitable flushing gun to

Page 209 of 1285

DODGE NEON 2000  Service Workshop Manual SPECIFICATIONS
COOLING SYSTEM CAPACITY
TORQUE SPECIFICATIONSSPECIAL TOOLS
COOLING
6.2 Liters (6.5 qts.)
CAPACITY, Includes Heater and Coolant Reserve
System
DESCRIPTION N´m Ft.
Lbs.In.
Lbs.
A/C Conde

Page 242 of 1285

DODGE NEON 2000  Service Workshop Manual REMOVAL
(1) Remove brake booster hose and electrical con-
nector from holders on end of cylinder head cover
and reposition.
(2) Disconnect electrical connectors from camshaft
position sensor.
(3) Remo