belt DODGE NEON 2000 Service Manual PDF

DODGE NEON 2000 Service Manual PDF NEON 2000 DODGE DODGE https://www.carmanualsonline.info/img/12/56910/w960_56910-0.png DODGE NEON 2000 Service Manual PDF

Page 760 of 1285

DODGE NEON 2000  Service Manual PDF CYLINDER HEAD
REMOVAL
(1) Perform fuel system pressure release procedure
before attempting any repairs.Refer to Group 14,
Fuel System
(2) Disconnect negative battery cable.
(3) Remove power steering/a

Page 763 of 1285

DODGE NEON 2000  Service Manual PDF (13) Install ignition coil and spark plug cables.
Connect coil electrical connector.
(14) Install intake manifold. Refer to procedure in
this section.
(15) Install upper radiator hose.
(16) Install gr

Page 764 of 1285

DODGE NEON 2000  Service Manual PDF (2) Install crankshaft damper bolt. Using Special
Tool 6847 and a torque wrench, tighten bolt to 136
N´m (100 ft. lbs.) (Fig. 63).
(3) Install accessory drive belts. Refer to Group 7,
Cooling System

Page 765 of 1285

DODGE NEON 2000  Service Manual PDF INSTALLATION
(1) Install rear timing cover and tighten bolts to
12 N´m (105 in. lbs.) (Fig. 65).
(2) Install camshaft sprocket. While holding
sprockets with Special Tools C-4687 and modifiedAdaptor C

Page 766 of 1285

DODGE NEON 2000  Service Manual PDF TIMING BELT
CHECKING BELT TIMINGÐCOVER INSTALLED
²Remove number one spark plug.
²Using a dial indicator, set number one cylinder
to TDC on the compression stroke.
²Remove the access plug from the

Page 767 of 1285

DODGE NEON 2000  Service Manual PDF (11) Inserta8mmAllen wrench into the hexagon
opening located on the front of the belt tensioner pul-
ley (Fig. 72). Rotate the pulley counterclockwise until
it contacts the stop. While holding tension

Page 768 of 1285

DODGE NEON 2000  Service Manual PDF CAMSHAFT AND CRANKSHAFT TIMING
PROCEDURE AND BELT INSTALLATION
(1) Set crankshaft sprocket to TDC by aligning the
sprocket with the arrow on the oil pump housing,
then back off to 3 notches before TDC

Page 769 of 1285

DODGE NEON 2000  Service Manual PDF (10) Install right engine mount to engine mount
bracket through bolt.
(11) Remove jack from under engine.
(12) Install upper torque strut.
(13) Install power steering pump assembly.
(14) Raise vehicle

Page 770 of 1285

DODGE NEON 2000  Service Manual PDF (5) Remove camshaft seal by carefully using a suit-
able pry tool. Be careful not to nick or damage thecamshaft seal surface or cylinder head seal retaining
bore.
CAUTION: Do not nick shaft seal surfa

Page 771 of 1285

DODGE NEON 2000  Service Manual PDF (2) Apply MopartSilicone Rubber Adhesive Seal-
ant at the oil pump to engine block parting line (Fig.
83).
(3) Position a new oil pan gasket onto pan.
(4) Install oil pan and tighten screws to 12 N´m