warning DODGE NEON 2000 Service Repair Manual

DODGE NEON 2000 Service Repair Manual NEON 2000 DODGE DODGE https://www.carmanualsonline.info/img/12/56910/w960_56910-0.png DODGE NEON 2000 Service Repair Manual

Page 1 of 1285

DODGE NEON 2000  Service Repair Manual GROUP TAB LOCATORINIntroductionINaIntroduction0Lubrication and Maintenance2Suspension3Differential and Driveline5Brakes6Clutch7Cooling8ABattery8BStarting8CCharging System8DIgnition System8EInstrument

Page 8 of 1285

DODGE NEON 2000  Service Repair Manual JUMP STARTING, TOWING, AND HOISTING
TABLE OF CONTENTS
page page
DESCRIPTION AND OPERATION
JUMP STARTING PROCEDURE...............7
TOWING RECOMMENDATIONS...............7
HOISTING RECOMMENDATIONS.......

Page 9 of 1285

DODGE NEON 2000  Service Repair Manual onds, stop cranking engine and allow starter to cool
(15 minutes), before cranking again.
DISCONNECT CABLE CLAMPS AS FOLLOWS:
²Disconnect BLACK cable clamp from engine
ground on disabled vehicle.
²W

Page 10 of 1285

DODGE NEON 2000  Service Repair Manual FLAT TOWING WITH TOW BAR
²3-speed automatic transaxle vehicles can be flat
towed at speeds not to exceed 40 km/h (25 mph) for
not more than 25 km (15 miles). The steering column
must be unlocked and

Page 20 of 1285

DODGE NEON 2000  Service Repair Manual FRONT SUSPENSION
TABLE OF CONTENTS
page page
DESCRIPTION AND OPERATION
FRONT SUSPENSION SYSTEM...............9
STRUT ASSEMBLY (FRONT)................11
STEERING KNUCKLE.....................11
LOWER CO

Page 25 of 1285

DODGE NEON 2000  Service Repair Manual CAUTION: No attempt should be made to service
the headless grease fitting on the ball joint. It has
been purposely snapped off by the manufacturer to
avoid over-greasing.
STABILIZER BAR (FRONT)
Inspec

Page 26 of 1285

DODGE NEON 2000  Service Repair Manual (6) Remove the two bolts attaching the strut to the
steering knuckle (Fig. 1).
(7) Lower the vehicle just enough to open the
hood, but without letting the tires touch the floor.
(8) Remove the three n

Page 29 of 1285

DODGE NEON 2000  Service Repair Manual once installed. Install the nuts. Holding the bolts in
place tighten the nuts to a torque of 53 N´m (40 ft.
lbs.) plus an additional 90É turn after the specified
torque is met.
(6) Place the tie rod

Page 31 of 1285

DODGE NEON 2000  Service Repair Manual with the notch formed in the side of the ball joint
stud.
(4) If the right lower control arm has been ser-
viced, install the engine torque strut (Fig. 16). Follow
the procedure described in the ENGIN

Page 32 of 1285

DODGE NEON 2000  Service Repair Manual (4) Lower the vehicle.
NOTE: It may be necessary to put the vehicle on a
platform hoist or alignment rack to gain access to
the stabilizer bar mounting bolts with the vehicle at
curb height.
(5) Tight
Page:   1-10 11-20 21-30 31-40 41-50 ... 190 next >