tow JEEP CJ 1953 Service Manual

JEEP CJ 1953 Service Manual CJ 1953 JEEP JEEP https://www.carmanualsonline.info/img/16/57040/w960_57040-0.png JEEP CJ 1953 Service Manual

Page 30 of 376

JEEP CJ 1953  Service Manual 
c 

TUNE-UP 
meter during this
 test
 Connect the red lead
 tc*
 dis­

tributor
 primary
 lead at the coil as shown in Fig. 
C-21.
 Connect black lead to the ground.
 Turn 

ignition switch on; with

Page 42 of 376

JEEP CJ 1953  Service Manual 
D 

HURRICANE
 F4
 ENGINE 
D-7.
 Remove Water Pump 
Remove the
 bolts
 and lockwashers that attach the 
water pump to the cylinder block. Remove the  water pump. 

D-8.
 Remove
 Exhaust
 Manifold 
Re

Page 49 of 376

JEEP CJ 1953  Service Manual 
Jeep
 UNIVERSAL SERIES
 SERVICE
 MANUAL 

D 

FIG.
 D-ll—CHECKING PISTON
 AND 
 CONNECTING
 ROD
 ALIGNMENT  1—
 Feeler
 Gauge 

2—
 Fixture 

the
 opposite
 side from the oil spray
 hole
 in

Page 51 of 376

JEEP CJ 1953  Service Manual 
-Jeep*
 UNIVERSAL
 SERIES SERVICE
 MANUAL 

E> 
[5,928 a
 5,926
 cm.] for all main bearings. Allowable 
taper or out-of-round of the journals is .001" 
 [0,0254
 mm.]. 

D-42.
 Checking Connecting Ro

Page 52 of 376

JEEP CJ 1953  Service Manual 
D 

HURRICANE
 F4
 ENGINE 

10442 

FIG.
 D-l6—SHIM
 STOCK
 IN
 POSITION
 ON 
 MAIN
 BEARING 

1—0.001"
 Feeler Stock H Wide  feeler stock with light
 engine
 oil and lay it on the 

bearing
 in

Page 63 of 376

JEEP CJ 1953  Service Manual 
Jeep
 UNIVERSAL SERIES SERVICE
 MANUAL 

D 
is .004" to .007"
 [0,102
 a 0,178 mm.] as measured 
by a dial indicator. Should a check
 show
 too little 
end play, place a shim of suitable thickness

Page 66 of 376

JEEP CJ 1953  Service Manual 
D 

HURRICANE
 F4
 ENGINE 

FIG.
 D-40—TIMING
 GEARS  Be
 sure
 to install a new rubber oil
 seal
 ring on each 

intake
 valve stem before installing the retainer 

locks.
 With
 the retainer and

Page 67 of 376

JEEP CJ 1953  Service Manual 
Jeep
 UNIVERSAL
 SERIES SERVICE
 MANUAL 

D 
Lubricate
 the connecting rod bearing surfaces 
generously with
 engine
 oil and install the bearing 
cap with the numbered side matched to the num­
be

Page 89 of 376

JEEP CJ 1953  Service Manual 
Dl 

Jeep5
 UNIVERSAL
 SERIES
 SERVICE
 MANUAL 

FIG.
 Dl-16—LEFT
 BANK
 PISTON 

AND
 ROD
 ASSEMBLY
 (No.
 1-3-5) 

1—
 Oil
 Spurt Hole Up 
2— Boss on Rod and Cap
 Rearward 

3—
 Notch on P

Page 90 of 376

JEEP CJ 1953  Service Manual 
DAUNTLESS
 V-6
 ENGINE 

Note:
 The rib on
 edge
 of cap and the conical
 boss 

on web of connecting rod must be toward
 rear
 of 
 engine
 in all connecting rod assemblies of left
 cyl­

inder
 ba
Page:   1-10 11-20 21-30 31-40 41-50 ... 60 next >