torque LEXUS SC400 1991 Service Repair Manual
[x] Cancel search | Manufacturer: LEXUS, Model Year: 1991, Model line: SC400, Model: LEXUS SC400 1991Pages: 4087, PDF Size: 75.75 MB
Page 1496 of 4087

(h) Apply a light coat of engine oil on the threads and under theheads of the bearing cap bolts.
(i) Install the oil feed pipe and 10 bolts.
HINT: Use bearing cap bolts 38 mm (1.50 in.) and 52 mm
(2.05 in.) in length. Use black colored 38 mm (1.50 in.) bolts.
Install the two 52 mm (2.05 in.) bolts in outside positions of
the oil feed pipe. Install the eight 38 mm (1.50 in.) bolts in the
other positions.
(j) Uniformly tighten the 8 bolts on the bearing caps of the exhaust camshaft in several passes, in the sequence shown.
Torque: 16 N Vm (160 kgf Vcm, 12 ft Vlbf)
(k) Alternately ti ghten the 2 bolts on the bearing cap of the intake
camshaft 2nd from the front in several passes.
Torque: 16 N Vm (160 kgf Vcm, 12 ft Vlbf)
(l) Boring the service bolt installed in the driven subgear upward
by turning the hexagon wrench head portion of the camshaft
with a wrench.
(m) Remove the service bolt.
8. CHECK AND ADJUST VALVE CLEARANCE (See steps 19 to 22 on pages EG±19 to 21)
Turn the camshaft and position the cam lobe upward, and
check and adjust the valve clearance.
Valve clearance (Cold):
Intake0.15 ± 0.25 mm (0.006 ± 0.010 in.)
Exhaust 0.25 ± 0.35 mm (0.010 ± 0.014 in.)
EG±120±
1UZ±FE ENGINE ENGINE MECHANICAL
WhereEverybodyKnowsYourName
Page 1498 of 4087

11. INSTALL CYLINDER HEAD COVER
(a) Remove any old packing (FIPG) material.
(b) Apply seal packing to the cylinder heads as shown in theillustration.
Seal packing:
Part No. 08826±00080 or equivalent
(c) Install the gasket to the cylinder head cover.
(d) Install the seal washer to the bolt.
(e) Install the cylinder head cover with the 8 bolts. Uniformlytighten the bolts in several passes. Install the 2 cylinder head
covers.
Torque: 5.9 N Vm (60 kgf Vcm, 52 in. Vlbf)
12. INSTALL ENGINE HANGERS
Install the engine hanger with the 2 bolts. Install the 2 engine
hangers.
Torque: 37 N Vm (380 kgf Vcm, 27 ft Vlbf)
13. INSTALL ENGINE WIRE TO CYLINDER HEADS
(a) Install the engine wire protector to the RH cylinder head with
the 2 bolts.
(b) Install the ground strap to RH cylinder head with the bolt.
EG±122
±
1UZ±FE ENGINE ENGINE MECHANICAL
WhereEverybodyKnowsYourName
Page 1499 of 4087

(c) Install the engine wire protector to the LH cylinder head withthe 5 bolts.
14. INSTALL EGR PIPE Install a new gasket and EGR pipe to the RH exhaust man-
ifold with 2 new nuts.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
15. INSTALL OIL DIPSTICK AND GUIDE FOR ENGINE
(a) Install a new O±ring to the dipstick guide.
(b) Apply soapy water to the O±ring.
(c) Push in the dipstick guide end into the guide hole of the No.1
oil pan.
(d) Install the dipstick guide with the bolt.
(e) Install the dipstick.
16. I N S TA L L O I L D I P S T I C K A N D G U I D E F O R TRANSMISSION
17. INSTALL REAR WATER BYPASS JOINT
(a) Install 2 new gaskets and the water bypass joint with the 4 nuts. Alternately tighten the nuts.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
(b) Install the water bypass pipe to the LH rear engine hanger
with the bolt.
18. INSTALL FRONT WATER BYPASS JOINT
(a) Install 2 new gaskets and the water bypass joint with the 4 nuts. Alternately tighten the nuts.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
±
1UZ±FE ENGINE ENGINE MECHANICALEG±123
WhereEverybodyKnowsYourName
Page 1500 of 4087

(b) Install the engine wire protector with the bolt.
(c) Connect the following connectors:(1) ECT sensor connector
(2) ECT sender gauge connector
19. INSTALL INTAKE MANIFOLD
(a) Place 2 new gaskets on the cylinder heads with white painted
mark facing upward.
NOTICE: Align the port holes of the gasket and cylinder head.
Be careful of the installation direction.
(b) Place the intake manifold on the cylinder heads with the
arrow mark facing forward.
NOTICE: Be careful of the installation direction.
(c) Install and uniformly tighten the 6 bolts and 4 nuts in severalpasses.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
HINT: Use bolt 30 mm (1.18 in.) in length.
20. INSTALL INJECTORS AND DELIVERY PIPE
(a) Install a new grommet to the injector.
(b) Apply a light coat of gasoline to a new O±ring, and install it to the injector.
(c) While turning the injector clockwise and counterclockwise, push it to the delivery pipe. Install the 8 injectors.
(d) Position the injector connector outward.
EG±124
±
1UZ±FE ENGINE ENGINE MECHANICAL
WhereEverybodyKnowsYourName
Page 1501 of 4087

(e) Place 8 new insulators and the 4 spacers in position on theintake manifold.
(f) Place the 8 injectors and 2 delivery pipes assembly in position on the intake manifold.
(g) Temporarily install the connector bracket and 4 nuts.
(h) Check that the injectors rotate smoothly.
HINT: If injectors do not rotate smoothly, the probable cause
is incorrect installation of O±rings. Replace the O±rings.
(i) Position the injector connector upward.
(j) Tighten the 4 nuts holding the delivery pipes to the intake manifold.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
21. INSTALL FUEL RETURN PIPE
(a) Temporarily install the fuel return pipe with the bolt, 2 new
gaskets and union bolt.
(b) Tighten the union bolt holding the return pipe to the fuel pressure regulator.
Torque: 35 N Vm (360 kgf Vcm, 26 ft Vlbf)
(c) Tighten the bolt holding the return pipe to the LH cylinder
head.
±
1UZ±FE ENGINE ENGINE MECHANICALEG±125
WhereEverybodyKnowsYourName
Page 1503 of 4087

25. CONNECT FUEL RETURN HOSE TO FUEL RETURN PIPE
26. CONNECT FUEL INLET HOSE TO LH DELIVERY PIPE
(a) Temporarily connect the fuel inlet hose to the delivery pipe with 2 new gaskets and pulsation damper.
(b) Install the bolt holding the fuel inlet hose to the delivery pipe.
(c) Using SST tighten the pulsation damper. SST 09631±22020
Torque:
39 NVm (400 kgf Vcm, 29 ft Vlbf)
33 N Vm (340 kgf Vcm, 24 ft Vlbf) for SST
HINT: Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.).
27. INSTALL HEATER WATER HOSES Connect the following noses:
(1) Water hose to water bypass pipe
(2) Water hose to rear water bypass joint
28. INSTALL AIR INTAKE CHAMBER
(a) Install the cold start injector, tube and lead wire assembly with
the 3 bolts.
Torque: 7.8 N Vm (80 kgf Vcm, 69 in. Vlbf)
(b) Place 4 new gaskets on the intake manifold.
HINT: Gaskets can only be used twice before being replaced.
(c) Place the air intake chamber on the intake manifold.
±
1UZ±FE ENGINE ENGINE MECHANICALEG±127
WhereEverybodyKnowsYourName
Page 1504 of 4087

(d) Install a new gasket to the EGR pipe.
(e) Temporarily connect the EGR pipe to the air intake chamberwith the 2 bolts.
HINT: Use bolt 20 mm (0.79 in.) in length.
(f) Temporarily install the air intake and and following parts with the 4 bolts and 8 nuts:
(1) VSV for fuel pressure control
(2) Except California:VSV for EGR
(3) Transmission throttle cable bracket
(4) DLC1
(g) Uniformly tighten the bolts and nuts several passes.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
HINT: Use bolt 40 mm (1.57 in.) in length.
(h) Tighten the 2 bolts holding the EGR pipe to the air intake chamber.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
(i) Tighten the bolt holding the EGR pipe to the RH cylinder
head.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
(j) Connect the cold start injector tube to the RH delivery pipe
with 2 new gaskets and the union bolt.
Torque: 15 N Vm (150 kgf Vcm, 11 ft Vlbf)
(k) Connect the following connectors:
wCold start injector connector
w VSV connector for fuel pressure control
w Except California:
VSV connector for EGR
EG±128
±
1UZ±FE ENGINE ENGINE MECHANICAL
WhereEverybodyKnowsYourName
Page 1505 of 4087

(l) Install the accelerator bracket with the bolt and stud bolt.
(m) Install 2 new gaskets and union with the union bolt.
Torque: 29 NVm (300 kgf Vcm, 22 ft Vlbf)
(n) Connect the following hoses:
(1) Brake booster vacuum hose to union on air intake cham-
ber
(2) Vacuum hose (from VSV for heater water valve to air in-
take chamber
29. INSTALL THROTTLE BODY
(a) Disconnect the following hoses: (1) PCV hose to throttle body
(2) Water bypass hose to throttle body
(b) Install a new gasket and throttle body with the 2 bolts and 2 nuts.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
HINT: Use bolt 40 mm (1.57 in.) in length.
(c) Install the water bypass pipe (from the rear bypass joint) to the clamp on the engine wire cover.
(d) Connect the following connectors: (1) Throttle position sensor connector
(2) w/ TRAC: Sub±throttle position sensor connector
(3) w/ TRAC: Sub±throttle actuator connector
±
1UZ±FE ENGINE ENGINE MECHANICALEG±129
WhereEverybodyKnowsYourName
Page 1506 of 4087

30. INSTALL HEATER WATER VALVE
(a) Install the water valve and bracket assembly with the 2 bolts.
(b) Install the engine wire with the bolt.
(c) Connect the VSV connector.
31. INSTALL IAC VALVE
(a) Install a new gasket and IAC valve with the 2 nuts.
Torque: 18 NVm (185 kgf Vcm, 13 ft Vlbf)
(b) Connect the water bypass hose (from the throttle body) to the
IAC valve.
(c) Connect the IAC valve connector.
32. INSTALL EGR VALVE ADAPTOR
(a) Install a new gasket, the EGR valve adaptor and EGR gas temperature sensor connector bracket with the 2 bolts and 2
nuts.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
HINT: Use bolt 20 mm (0.78 in.) in length.
NOTICE: Do not touch the air intake chamber and adaptor sur-
faces of the gasket with your hand.
(b) Connect the PCV hose to the cylinder head.
(c) Connect the EGR gas temperature sensor connector.
EG±130
±
1UZ±FE ENGINE ENGINE MECHANICAL
WhereEverybodyKnowsYourName
Page 1507 of 4087

33. California:INSTALL EGR VALVE
(a) Place a new gasket on the EGR valve apaptor.
NOTICE:
w Do not touch the adaptor and EGR valve surfaces of the
gasket with your hand.
w Align the port holes of the gasket and adaptor. Be careful
of the installation direction.
(b) Install the EGR valve with the 2 nuts.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
(c) Connect the following hoses:
(1) Water bypass hose to IAC valve
(2) Water bypass hose to water bypass pipe (from rear wa-ter bypass joint)
(d) Connect the EGR valve connector.
34. Except California: INSTALL EGR VALVE AND VACUUM MODULATOR
(a) Place a new gasket on the EGR valve adaptor.
NOTICE:
w Do not touch the adaptor and EGR valve surfaces of the
gasket with your hand.
w Align the port holes of the gasket and adaptor. Be careful
of the installation direction.
(b) Install the EGR valve and vacuum modulator assembly with
the bolt and 2 nuts.
Torque: 18 N Vm (185 kgf Vcm, 13 ft Vlbf)
±
1UZ±FE ENGINE ENGINE MECHANICALEG±131
WhereEverybodyKnowsYourName