engine NISSAN NOTE 2016 Service Repair Manual

NISSAN NOTE 2016 Service Repair Manual NOTE 2016 NISSAN NISSAN https://www.carmanualsonline.info/img/5/57363/w960_57363-0.png NISSAN NOTE 2016 Service Repair Manual

Page 1059 of 3641

NISSAN NOTE 2016  Service Repair Manual EM-58
< REMOVAL AND INSTALLATION >[HR16DE]
TIMING CHAIN
CAUTION:
• Do not confirm torque afte
r the 5 minutes have elapsed.
• Then allow 30 minutes for the liquid gasket to set before
adding oil t

Page 1060 of 3641

NISSAN NOTE 2016  Service Repair Manual TIMING CHAINEM-59
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Secure crankshaft pulley with a suitable tool and tighten crankshaft pulley bolt.
a. Apply new engine oil to

Page 1061 of 3641

NISSAN NOTE 2016  Service Repair Manual EM-60
< REMOVAL AND INSTALLATION >[HR16DE]
CAMSHAFT
CAMSHAFT
Exploded ViewINFOID:0000000012431720
Removal and InstallationINFOID:0000000012431721
CAUTION:
The rotation direction 
indicated in the proc

Page 1062 of 3641

NISSAN NOTE 2016  Service Repair Manual CAMSHAFTEM-61
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
2. Remove camshaft sprocket (EXH) (1).
CAUTION:
• Hold the camshaft hexagonal pa rt (A), and then secure the
camsh

Page 1064 of 3641

NISSAN NOTE 2016  Service Repair Manual CAMSHAFTEM-63
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
4. Remove the camshaft sprocket (INT):
a. Keeping the camshaft hexagonal part (A) in place using suitable
tool, loos

Page 1066 of 3641

NISSAN NOTE 2016  Service Repair Manual CAMSHAFTEM-65
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
a. Put the matching marks (A) on a line extending from the knock
pin position of camshaft (EXH) (1) front surface.

Page 1067 of 3641

NISSAN NOTE 2016  Service Repair Manual EM-66
< REMOVAL AND INSTALLATION >[HR16DE]
CAMSHAFT
8. Tighten bolts of camshaft brackets in the following steps, in
numerical order as shown.
a. Tighten No. 9 to 11 in numerical order.
b. Tighten No.

Page 1069 of 3641

NISSAN NOTE 2016  Service Repair Manual EM-68
< REMOVAL AND INSTALLATION >[HR16DE]
CAMSHAFT
• Before starting engine, check oil/fluid levels, including engine coolant and engine oil. If less than required
quantity, fill to the specified l

Page 1072 of 3641

NISSAN NOTE 2016  Service Repair Manual CAMSHAFTEM-71
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Measure the outer diameter of valve lifter using suitable tool (A).
VALVE LIFTER HOLE DIAMETER
Measure the diame

Page 1073 of 3641

NISSAN NOTE 2016  Service Repair Manual EM-72
< REMOVAL AND INSTALLATION >[HR16DE]
CAMSHAFT
c. Disconnect ignition coil and injector harness connectors.
3. Remove intake valve timing control solenoid valve. Refer to 
EM-60, "
Exploded View"