roof NISSAN TEANA 2014 Workshop Manual
[x] Cancel search | Manufacturer: NISSAN, Model Year: 2014, Model line: TEANA, Model: NISSAN TEANA 2014Pages: 4801, PDF Size: 51.2 MB
Page 3672 of 4801

SYSTEMRF-7
< SYSTEM DESCRIPTION >
C
D E
F
G H
I
J
L
M A
B
RF
N
O P
• When ignition switch is ON again.
• When timer time passes. (45 seconds)
ANTI-PINCH FUNCTION
The CPU of moonroof motor assembly monitors t he moonroof motor operation and the moonroof position
(fully-closed or other) by the signals from moonroof motor.
When moonroof motor detects an interruption during t he following slide close and tilt down operation, moon-
roof switch controls the motor for open and the moonroof will operate until full up position (when tilt down oper-
ates) or 100 mm (3.94 in) or more in an open direction (when slide close operates):
• Close operation and tilt down when ignition switch is in the “ON” position
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3676 of 4801

MOONROOF MOTOR ASSEMBLYRF-11
< ECU DIAGNOSIS INFORMATION >
C
D E
F
G H
I
J
L
M A
B
RF
N
O P
MOONROOF MOTOR ASSEMBLY
Reference ValueINFOID:0000000009461298
TERMINAL LAYOUT
PHYSICAL VALUES
AWKIA1980ZZ
Te r m i n a l N o . (Wire color) Description
ConditionVoltage (V)
(Approx.)
+ - Signal name Input/
Output
1
(B) Ground Ground — — 0
3
(Y) Ground RAP signal Input Ignition switch ON Battery voltage
Within 45 second after ignition
switch is turned to OFF. Battery voltage
When driver side or passenger
side door is opened during re-
tained power operation. 0
5
(L) Ground Moonroof open switch signal Input Moonroof switch in following
position
•TILT DOWN
• SLIDE OPEN 0
Other than above Battery voltage
6
(R) Ground Moonroof power supply Input — Battery voltage
8
(O) Ground
Vehicle speed signal (2-
pulse) InputSpeedometer operated [When
vehicle speed is approx.40km/
h (25MPH)]
10
(G) Ground Moonroof close switch signal Input Moonroof switch in following
position
•TILT UP
•SLIDE CLOSE 0
Other than above Battery voltage
ELF1080D
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3677 of 4801

RF-12
< WIRING DIAGRAM >
MOONROOF SYSTEM
WIRING DIAGRAM
MOONROOF SYSTEM
Wiring DiagramINFOID:0000000009461299
AAKWA0815GB
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3678 of 4801

MOONROOF SYSTEMRF-13
< WIRING DIAGRAM >
C
D E
F
G H
I
J
L
M A
B
RF
N
O P
ABKIA3633GB
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3679 of 4801

RF-14
< WIRING DIAGRAM >
MOONROOF SYSTEM
ABKIA3634GB
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3680 of 4801

MOONROOF SYSTEMRF-15
< WIRING DIAGRAM >
C
D E
F
G H
I
J
L
M A
B
RF
N
O P
ABKIA3635GB
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3681 of 4801

RF-16
< WIRING DIAGRAM >
MOONROOF SYSTEM
AAKIA1928GB
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3682 of 4801

MOONROOF SYSTEMRF-17
< WIRING DIAGRAM >
C
D E
F
G H
I
J
L
M A
B
RF
N
O P
AAKIA1929GB
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3685 of 4801

RF-20
< BASIC INSPECTION >
INSPECTION AND ADJUSTMENT
INSPECTION AND ADJUSTMENT
ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT
ADDITIONAL SERVICE WHEN REPL ACING CONTROL UNIT : Description
INFOID:0000000009461301
MEMORY RESET PROCEDURE
1. Please observe the following instructi ons at confirming the moonroof operation.
NOTE:
Do not disconnect the electronic power while the moonroof is operating or within 5 seconds after the
moonroof stops. (to wipe-out the memory of lid position and operating friction.)
2. Initialization of system should be conducted after the following conditions. • When the moonroof motor is changed.
• When the moonroof does not operate normally. (Incomplete initialization conditions)
ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Re-
quirement
INFOID:0000000009461302
INITIALIZATION PROCEDURE
If the moonroof does not open or clos e automatically, use the following procedure to return moonroof opera-
tion to normal.
NOTE:
If the moonroof switch is released at any time duri ng step 4, the procedure must be started over again. Leave
the ignition switch ON for at least 2 seconds after this procedure.
1. Push the ignition switch to the ON position.
2. Hold the moonroof switch in the tilt up position. Release the switch when the moonroof has reached the
full tilt up position.
3. Hold the moonroof switch in the tilt up position agai n. After a delay, the moonroof will backup. Release the
switch.
4. Within 4 seconds of releasing the switch in step 3, hold the moonroof switch in the tilt up position again.
The moonroof will move from the full tilt-up → slide-close → slide-open → slide-close → tilt-up → slide-
close. Release the switch, initialization is complete if the moonroof operates normally.
ANTI-PINCH FUNCTION
1. Fully open the moonroof to the full open position.
2. Place a piece of wood at the fully closed position.
3. Close the moonroof completely with auto-slide close function.
4. Moonroof should make contact and then tilt up in reverse for 100mm (3.94 in.) (approx.).
CAUTION:
• Do not test the anti-pinch functi on with your hands or other part of body parts because they may be
pinched.
• Depending on environment and drivin g conditions, if a similar impact or load is applied to the moon-
roof it may lower.
• Test the auto-slide operation before inspectio n when the system initialization is performed.
• Perform the initialization proced ure when the auto-slide operation or anti-pinch function does not
operate normally.
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 3686 of 4801

POWER SUPPLY AND GROUND CIRCUITRF-21
< DTC/CIRCUIT DIAGNOSIS >
C
D E
F
G H
I
J
L
M A
B
RF
N
O P
DTC/CIRCUIT DIAGNOSIS
POWER SUPPLY AND GROUND CIRCUIT
BCM
BCM : Diagnosis ProcedureINFOID:0000000009941205
Regarding Wiring Diagram information, refer to BCS-55, "Wiring Diagram".
1. CHECK FUSE AND FUSIBLE LINK
Check that the following fuse and fusible link are not blown.
Is the fuse or fusible link blown?
YES >> Replace the blown fuse or fusible link after repairing the affected circuit.
NO >> GO TO 2
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connector M21.
2. Check voltage between BCM connector M21 terminals 131, 139 and ground.
Is the inspection result normal?
YES >> GO TO 3
NO >> Repair or replace harness or connectors.
3. CHECK GROUND CIRCUIT
Check continuity between BCM connector M21 terminals 134, 143 and ground.
Is the inspection result normal?
YES >> Inspection End.
NO >> Repair or replace harness or connectors.
MOONROOF MOTOR ASSEMBLY
MOONROOF MOTOR ASSEMBLY : DescriptionINFOID:0000000009461304
• BCM supplies power.
• CPU is integrated in moonroof motor assembly.
• Tilts up/down & slides open/close by moonroof switch operation.
• In order to close moonroof lid certainly with the signal from combination meter at the time of high speed run,
the moonroof motor torque at the time of tilt-down operation is controlled.
Terminal No. Signal name Fuse and fusible link No.
139 Fusible link battery power I (40A)
131 BCM battery fuse 1 (10A)
BCM GroundVo l ta g e
(Approx.)
Connector Terminal
M21 131
—Batteryvoltage
139
BCM Ground Continuity
Connector Terminal
M21 134
—Yes
143
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM