Check engine NISSAN TIIDA 2007 Service Repair Manual
[x] Cancel search | Manufacturer: NISSAN, Model Year: 2007, Model line: TIIDA, Model: NISSAN TIIDA 2007Pages: 5883, PDF Size: 78.95 MB
Page 2832 of 5883
![NISSAN TIIDA 2007 Service Repair Manual TIMING CHAIN
EM-185
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
18. Secure crankshaft pulley (1) using tool (A).
19. Apply new engine oil to thread and seat surfaces of crankshaft
pu NISSAN TIIDA 2007 Service Repair Manual TIMING CHAIN
EM-185
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
18. Secure crankshaft pulley (1) using tool (A).
19. Apply new engine oil to thread and seat surfaces of crankshaft
pu](/img/5/57395/w960_57395-2831.png)
TIMING CHAIN
EM-185
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
18. Secure crankshaft pulley (1) using tool (A).
19. Apply new engine oil to thread and seat surfaces of crankshaft
pulley bolt.
20. Tighten crankshaft pulley bolt in three steps.
21. Put a paint mark (B) on crankshaft pulley (2), matching with any
one of six easy to recognize angle marks (A) on crankshaft pul-
ley bolt (1) flange.
22. Turn another 60 degrees clockwise (angle tightening) using
Tool.
Check the tightening angle with movement of one angle mark.
23. Make sure that crankshaft rotates clockwise smoothly.
24. Installation of the remaining components is in the reverse order of removal.Step 1 : 68.6 N·m (7.0 kg-m, 51 ft-lb)
Step 2 : 0 N·m (0 kg-m, 0 ft-lb)
Step 3 : 29.4 N·m (3.0 kg-m, 22 ft-lb)
PBIC3961E
Tool number : KV10112100 (BT-8653-A)
PBIC3963E
Page 2840 of 5883
![NISSAN TIIDA 2007 Service Repair Manual CAMSHAFT
EM-193
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
10. Install camshaft sprocket (EXH) (2).
NOTE:
Secure the hexagonal part (A) of camshaft (EXH) using wrench
to tighten bol NISSAN TIIDA 2007 Service Repair Manual CAMSHAFT
EM-193
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
10. Install camshaft sprocket (EXH) (2).
NOTE:
Secure the hexagonal part (A) of camshaft (EXH) using wrench
to tighten bol](/img/5/57395/w960_57395-2839.png)
CAMSHAFT
EM-193
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
10. Install camshaft sprocket (EXH) (2).
NOTE:
Secure the hexagonal part (A) of camshaft (EXH) using wrench
to tighten bolt.
11. Install timing chain and related parts. Refer to EM-176
.
12. Inspect and adjust valve clearance. Refer to EM-148, "
Valve Clearance".
13. Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
The following are procedures for checking fluids leak, lubricates leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to GI-27, "
Recommended Chemical Products and Sealants".
Use procedure below to check for fuel leakage.
- Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
- Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal/installation, slack in the guide may
generate a pounding noise during and just after engine start. However, this is normal. Noise will stop after
hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil and
engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc.
Inspection of Camshaft Sprocket (INT) Oil Groove
CAUTION:
Perform this inspection only when DTC P0011 is detected in self-diagnostic results of CONSULT-III
and it is directed according to inspection procedure of EC section. Refer to EC-796, "
Diagnosis Pro-
cedure".
Check when engine is cold so as to prevent burns from the splashing engine oil.
1. Check engine oil level. Refer to LU-15, "
Inspection".
2. Perform the following procedure so as to prevent the engine from being unintentionally started while
checking.
a. Remove intake manifold. Refer to EM-156, "
Component".
b. Disconnect ignition coil and injector harness connectors.
3. Remove intake valve timing control solenoid valve. Refer to EM-176, "
Component".
1 : Camshaft sprocket (INT)
Camshaft sprocket
bolt (EXH): 88.2 N·m (9.0 kg-m, 65 ft-lb)
PBIC3454J
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
Page 2841 of 5883
![NISSAN TIIDA 2007 Service Repair Manual EM-194
< ON-VEHICLE REPAIR >[MR18DE]
CAMSHAFT
4. Clean the mating area of intake valve timing control solenoid
valve. Insert a clean shop cloth (with no oil adhesion) into the oil
hole (A) of the cyli NISSAN TIIDA 2007 Service Repair Manual EM-194
< ON-VEHICLE REPAIR >[MR18DE]
CAMSHAFT
4. Clean the mating area of intake valve timing control solenoid
valve. Insert a clean shop cloth (with no oil adhesion) into the oil
hole (A) of the cyli](/img/5/57395/w960_57395-2840.png)
EM-194
< ON-VEHICLE REPAIR >[MR18DE]
CAMSHAFT
4. Clean the mating area of intake valve timing control solenoid
valve. Insert a clean shop cloth (with no oil adhesion) into the oil
hole (A) of the cylinder head.
5. Install engine mounting bracket (RH), engine mounting insulator,
and torque rod (RH) under the Step 4 condition. (With intake
valve timing control solenoid valve removed, and a shop cloth
inserted into the oil hole.) Refer to EM-207, "
Component".
6. Crank engine, and then make sure that engine oil comes out
from intake valve timing control solenoid valve hole (A). End crank after checking.
Check engine oil leakage by oil amount adhered to the waste inserted into the oil hole.
WARNING:
Be careful not to touch rotating parts (drive belts, idler pulley, and crankshaft pulley, etc.).
CAUTION:
Do not perform cranking without installing right engine mount bracket, right engine mount insu-
lator, and right torque rod.
Prevent splashing by using a shop cloth so as to prevent the worker from injury from engine oil
and so as to prevent engine oil contamination.
Prevent splashing by using a shop cloth so as to prevent engine oil from being splashed to
engine and vehicle. Especially, be careful not to apply engine oil to rubber parts of drive belts,
engine mounting insulator, etc. Wipe engine oil off immediately if it is splashed.
7. Perform the following inspection if engine oil does not come out from intake valve timing control solenoid
valve oil hole of the cylinder head.
Remove oil filter (for intake valve timing control), and then clean it. Refer to EM-186, "
Component".
Clean oil groove between oil strainer and intake valve timing control solenoid valve. Refer to LU-11,
"Lubrication Circuit".
8. Remove components between intake valve timing control solenoid valve and camshaft sprocket (INT),
and then check each oil groove for clogging.
Clean oil groove if necessary. Refer to LU-11, "
Lubrication Circuit".
9. Installation of the remaining components is in the reverse order of removal
1 : Front cover
:Vehicle front
WBIA0781E
Page 2846 of 5883
![NISSAN TIIDA 2007 Service Repair Manual CYLINDER HEAD
EM-199
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
INSPECTION AFTER REMOVAL
Cylinder Head Bolts Outer Diameter
Cylinder head bolts are tightened by plastic zone tight NISSAN TIIDA 2007 Service Repair Manual CYLINDER HEAD
EM-199
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
INSPECTION AFTER REMOVAL
Cylinder Head Bolts Outer Diameter
Cylinder head bolts are tightened by plastic zone tight](/img/5/57395/w960_57395-2845.png)
CYLINDER HEAD
EM-199
< ON-VEHICLE REPAIR >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
INSPECTION AFTER REMOVAL
Cylinder Head Bolts Outer Diameter
Cylinder head bolts are tightened by plastic zone tightening
method. Whenever the size difference between “d1” and “d2”
exceeds the limit, replace them with a new one.
If reduction of outer diameter appears in a position other than “d2”,
use it as “d2” point.
Cylinder Head Distortion
NOTE:
When performing this inspection, cylinder block distortion should be also checked. Refer to EM-219, "
Inspec-
tion After Disassembly".
1. Wipe off engine oil and remove water scale (like deposit), gasket, sealant, carbon, etc. with a scraper.
CAUTION:
Use utmost care not to allow gasket debris to enter passages for engine oil or water.
2. At each of several locations on bottom surface of cylinder head,
measure the distortion in six directions using straightedge (A)
and feeler gauge (B).
If it exceeds the limit, replace cylinder head.
INSTALLATION
1. Install cylinder head gasket.
2. Apply new engine oil to threads and seating surface of bolts.
CAUTION:
If cylinder head bolts re-used, check their outer diameters before installation. Follow the "Cylinder
Head Bolts Outer Diameter" measurement procedure.
3. Install cylinder head, follow the steps below to tighten cylinder
head bolts in numerical order as shown.Limit (“d1” – “d2”): 0.15 mm (0.0059 in)
PBIC3994E
Limit: 0.1 mm (0.004 in)
PBIC3207J
Step a : 40 N·m (4.1 kg-m, 30 ft-lb)
Step b : 100° clockwise
Step c : Loosen to 0 N·m in the reverse order of tight-
ening.
Step d : 40 N·m (4.1 kg-m, 30 ft-lb)
Step e : 100° clockwise
Step f : 100° clockwise
PBIC3206J
Page 2847 of 5883
![NISSAN TIIDA 2007 Service Repair Manual EM-200
< ON-VEHICLE REPAIR >[MR18DE]
CYLINDER HEAD
: Engine front
CAUTION:
Check and confirm the tightening angle by using Tool (A) or
protractor. Never judge by visual inspection without the
tool.
4. NISSAN TIIDA 2007 Service Repair Manual EM-200
< ON-VEHICLE REPAIR >[MR18DE]
CYLINDER HEAD
: Engine front
CAUTION:
Check and confirm the tightening angle by using Tool (A) or
protractor. Never judge by visual inspection without the
tool.
4.](/img/5/57395/w960_57395-2846.png)
EM-200
< ON-VEHICLE REPAIR >[MR18DE]
CYLINDER HEAD
: Engine front
CAUTION:
Check and confirm the tightening angle by using Tool (A) or
protractor. Never judge by visual inspection without the
tool.
4. Installation of the remaining components is in the reverse order of removal.
ComponentINFOID:0000000001337806
Disassembly and AssemblyINFOID:0000000001337807
DISASSEMBLY
Tool number : KV10112100 (BT-8653-A)
PBIC3208J
1. Valve collet 2. Valve spring retainer 3.Va l v e s p r i n g ( E X H )
(with valve spring seat)
4. Valve oil seal 5. Valve guide (EXH) 6. Valve seat (EXH)
7. Valve (EXH) 8. Valve (INT) 9. Valve seat (INT)
10. Cylinder head 11. Valve guide (INT) 12. Spark plug
13.Valve spring (INT)
(with valve spring seat)
A. Refer to EM-202
B. Refer to EM-202
PBIC3543J
Page 2856 of 5883
![NISSAN TIIDA 2007 Service Repair Manual ENGINE ASSEMBLY
EM-209
< REMOVAL AND INSTALLATION >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
24. Remove the intake manifold to prevent the hanging chain from interfering. Refer to EM-156, "Removal
and NISSAN TIIDA 2007 Service Repair Manual ENGINE ASSEMBLY
EM-209
< REMOVAL AND INSTALLATION >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
24. Remove the intake manifold to prevent the hanging chain from interfering. Refer to EM-156, "Removal
and](/img/5/57395/w960_57395-2855.png)
ENGINE ASSEMBLY
EM-209
< REMOVAL AND INSTALLATION >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
24. Remove the intake manifold to prevent the hanging chain from interfering. Refer to EM-156, "Removal
and Installation".
25. Install engine slinger to cylinder head front left side (A) and rear
right side (B) and support the engine position with a hoist.
26. Support engine and transaxle assembly with a hoist and secure the engine in appropriate position.
27. Use a manual lift table caddy (A) or equivalently rigid tool such
as a transmission jack. Securely support bottom of the engine
and the transaxle, and simultaneously adjust hoist tension.
CAUTION:
Put a piece of wood or something similar as the supporting
surface, secure a completely stable condition.
28. Remove torque rod (RH) (1), engine insulator (RH) (2) and
engine bracket (RH) (3).
29. Remove engine through bolt-securing nut (C).
30. Remove the engine and the transaxle assembly from the vehicle downward by carefully operating sup-
porting tools.
CAUTION:
During the operation, make sure that no part interferes with the vehicle side.
Before and during this lifting, always check if any harnesses are left connected.
During the removal operation, always be careful to prevent the vehicle from falling off the lift due
to changes in the center of gravity.
If necessary, support the vehicle by setting jack or suitable tool at the rear.
During operation, securely support the engine by placing a piece of wood under the engine oil
pan and transaxle oil pan. Securely support the engine slingers with a hoist.
31. When the engine hoisting is not performed simultaneously, install engine slinger to cylinder head front left
side and rear right side. Refer to EM-207, "
Component".
32. Remove starter motor. Refer to STR-24, "
Removal and Installation".
33. Lift with a hoist and position above engine.
34. Separate the engine and the transaxle. Refer to EM-207, "
Component" .
INSTALLATION
Note the following, and install in the reverse order of removal.
Do not allow engine oil to get on engine mounting insulator. Be careful not to damage engine mounting insu-
lator.
: Engine front
Slinger bolts : 25.5 N·m (2.6 kg-m, 19 ft-lb)
LBIA0461E
PBIC3223J
4 : Engine insulator (LH)
A : Engine front side
B : Transaxle side
WBIA0784E
Page 2857 of 5883
![NISSAN TIIDA 2007 Service Repair Manual EM-210
< REMOVAL AND INSTALLATION >[MR18DE]
ENGINE ASSEMBLY
When installation directions are specified, install parts according to the directions. Refer to EM-207, "Com-
ponent".
Prior to installi NISSAN TIIDA 2007 Service Repair Manual EM-210
< REMOVAL AND INSTALLATION >[MR18DE]
ENGINE ASSEMBLY
When installation directions are specified, install parts according to the directions. Refer to EM-207, "Com-
ponent".
Prior to installi](/img/5/57395/w960_57395-2856.png)
EM-210
< REMOVAL AND INSTALLATION >[MR18DE]
ENGINE ASSEMBLY
When installation directions are specified, install parts according to the directions. Refer to EM-207, "Com-
ponent".
Prior to installing the upper torque rod, apply a light coat of silicone
lubricant (A) to the washer facing side of the bushing inner tube as
shown.
NOTE:
Apply silicone lubricant (A) by dabbing the outward facing tube
surface with a sponge or suitable tool.
Do not apply excess lubricant.
Make sure that each mounting insulator is seated properly, and tighten nuts and bolts.
Tighten engine mounting insulator (RH) bolts in the numerical
order shown.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to LU-15, "
Inspection", CO-35, "Inspection".
Use procedure below to check for fuel leakage.
- Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
- Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids includ-
ing engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle fluid, power steering fluid, brake fluid, etc.: Vehicle front
LBIA0470E
: Vehicle front
WBIA0785E
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
Page 2860 of 5883
![NISSAN TIIDA 2007 Service Repair Manual ENGINE UNIT
EM-213
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
Carefully handle knock sensor avoiding shocks.
7. Remove crankshaft position sensor (POS) cover and crankshaft p NISSAN TIIDA 2007 Service Repair Manual ENGINE UNIT
EM-213
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
Carefully handle knock sensor avoiding shocks.
7. Remove crankshaft position sensor (POS) cover and crankshaft p](/img/5/57395/w960_57395-2859.png)
ENGINE UNIT
EM-213
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
Carefully handle knock sensor avoiding shocks.
7. Remove crankshaft position sensor (POS) cover and crankshaft position sensor (POS).
CAUTION:
Avoid impacts such as a dropping.
Never disassemble.
Keep it away from metal particles.
Never place sensor in a location where it is exposed to magnetism.
8. Remove oil filter (for intake valve timing control).
9. Position crankshaft pin corresponding to connecting rod to be removed onto the bottom dead center.
NOTE:
Before removing piston and connecting rod assembly, check the connecting rod side clearance. Refer to
EM-219, "
Inspection After Disassembly".
10. Remove connecting rod cap.
11. Using a suitable tool, push piston and connecting rod assembly
out to the cylinder head side.
CAUTION:
Be careful not to damage matching surface with connect-
ing rod cap.
Be careful not to damage the cylinder wall and crankshaft
pin, resulting from an interference of the connecting rod
big end.
12. Remove connecting rod bearings.
CAUTION:
When removing them, note the installation position. Keep them in the correct order.
13. Remove piston rings form piston.
Before removing piston rings, check the piston ring side clearance. Refer to EM-219, "
Inspection After
Disassembly".
14. Using a suitable tool (A) remove piston rings.
CAUTION:
When removing piston rings, be careful not to damage the
piston.
Be careful not to damage piston rings by expanding them
excessively.
15. Using snap ring pliers (A), remove snap rings.
PBIC0259E
PBIC3233J
PBIC3230J
Page 2863 of 5883
![NISSAN TIIDA 2007 Service Repair Manual EM-216
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
ENGINE UNIT
9. Position crankshaft (2) and signal plate (1) using a dowel pin
(service part), and tighten bolts in numerical order as shown.
NOTE:
Dowel pin NISSAN TIIDA 2007 Service Repair Manual EM-216
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
ENGINE UNIT
9. Position crankshaft (2) and signal plate (1) using a dowel pin
(service part), and tighten bolts in numerical order as shown.
NOTE:
Dowel pin](/img/5/57395/w960_57395-2862.png)
EM-216
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
ENGINE UNIT
9. Position crankshaft (2) and signal plate (1) using a dowel pin
(service part), and tighten bolts in numerical order as shown.
NOTE:
Dowel pin of crankshaft and signal plate is provided as a set for
each.
10. Tighten bolts in numerical order as shown.
11. Remove dowel pin. (service parts)
CAUTION:
Be sure to remove dowel pin.
12. Install crankshaft to cylinder block.
While turning crankshaft by hand, make sure that it turns smoothly.
13. Install main bearing caps referring to the journal No. stamp (A)
and front mark (B) as shown.
NOTE:
Main bearing cap cannot be replaced as a single part, because it
is machined together with cylinder block.
14. Apply new engine oil to threads and seat surfaces of bolts.
15. Tighten main bearing cap bolts in two steps.
NOTE:
Tighten main bearing cap bolts in numerical order as shown:
After installing bolts, make sure that crankshaft can be rotated smoothly by hand.
Check crankshaft end play. Refer to EM-219, "
Inspection After Disassembly".
16. Using snap ring pliers, install new snap ring to the groove of the piston rear side.
Insert it fully into groove to install.
17. Assemble piston to connecting rod.
A : Dowel pin hole
PBIC3238J
: Engine front
PBIC3239J
: Engine front
Step 1 : 34.3 N·m (3.5 kg-m, 25 ft-lb)
Step2 60° clockwise
PBIC3235J
Tool number : KV10112100 (BT-8653-A)
PBIC3240J
Page 2864 of 5883
![NISSAN TIIDA 2007 Service Repair Manual ENGINE UNIT
EM-217
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
Using a suitable tool, heat the piston until the piston pin can be pushed in by hand without excess force
[app NISSAN TIIDA 2007 Service Repair Manual ENGINE UNIT
EM-217
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
Using a suitable tool, heat the piston until the piston pin can be pushed in by hand without excess force
[app](/img/5/57395/w960_57395-2863.png)
ENGINE UNIT
EM-217
< DISASSEMBLY AND ASSEMBLY >[MR18DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
N
P O
Using a suitable tool, heat the piston until the piston pin can be pushed in by hand without excess force
[approximately 60° to 70 °C (140° to 158 °F)]. From the front to the rear, insert piston pin into piston and
connecting rod.
Assemble so that the front mark (A) on the piston head and
the oil hole (B) and the cylinder number (C) on connecting rod
are positioned as shown.
18. Install new snap ring to the groove of the piston front side.
Insert it fully into groove to install.
After installing, make sure that connecting rod moves
smoothly.
19. Using a suitable tool, install piston rings.
CAUTION:
Be careful not to damage piston.
Be careful not to damage piston rings by expanding them excessively.
Position each ring with the gap as shown referring to the pis-
ton front mark.
CAUTION:
Never contact the rail end gap under the oil ring with the
oil drain cast groove of piston.
Install second ring with the stamped surface facing upward.
20. Install connecting rod bearing upper (2) and lower (3) to con-
necting rod (1) and connecting rod cap (4).
Install the connecting rod in the dimension shown.
Make sure that connecting rod bearing oil hole (A) is com-
pletely in the inside of connecting rod oil hole chamfered area
(B).
When installing connecting rod bearings, apply new engine oil
to the bearing surface (inside). Do not apply new engine oil to
the back surface, but thoroughly clean it.
NOTE:
There is no positioning tab.
Install the connecting rod bearings in the center of connect-
ing rod and connecting rod bearing cap as shown. For ser-
vice operation, the center position can be checked, visually.
21. Install piston and connecting rod assembly to crankshaft.
Position crankshaft pin corresponding to connecting rod to be installed onto the bottom dead center.
D : Big end diameter grade
E : Small end diameter grade
F : Front mark (connecting rod bearing cap)
A : Oil ring upper or lower rail gap
B : Front mark
C : Second ring and oil ring spacer gap
D : Top ring gap
E : Stamped mark
PBIC3587J
PBIC3588J
C : Oil hole (connecting rod)
D : Arrow view
: Engine front
PBIC4541E