fuel RENAULT TWINGO 2009 2.G Engine And Peripherals Owner's Guide

RENAULT TWINGO 2009 2.G Engine And Peripherals Owner's Guide TWINGO 2009 2.G RENAULT RENAULT https://www.carmanualsonline.info/img/7/1710/w960_1710-0.png RENAULT TWINGO 2009 2.G Engine And Peripherals Owner's Guide

Page 184 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-67
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
C44, and K9K
11A
PARTS AND CONSUMABLES FOR THE 
REPAIR WORK
aParts always to be replaced :
-axle sub-frame bolts,
-air inlet metal tube

Page 185 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-68
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
C44, and K9K
11A
aApply four beads (2) of SILICONE ADHESIVE
SEALANT, 2 mm in diameter.
II -  REFITTING OPERATION FOR PART 
CONCERNED
aR

Page 186 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-69
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 772
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aDisconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).

Page 187 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-70
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 772
11A
II -  REFITTING OPERATION FOR PART 
CONCERNED
aApply a bead (1) of SILICONE ADHESIVE SEAL-
ANT  (see Vehicle: Parts an

Page 188 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-71
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 780 or 782 or 784
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aDisconnect the battery (see Battery: Removal - Re-
fitting) (

Page 190 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-73
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 780 or 782 or 784
11A
aDisconnect the oil vapour rebreathing circuit unions 
(9) .
-on the inlet distributor,
-on the air filt

Page 191 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-74
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 780 or 782 or 784
11A
II -  REFITTING OPERATION FOR PART 
CONCERNED
aApply beads (1) of MASTIXO  (see Vehicle: Parts
and consu

Page 192 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-75
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 780 or 782 or 784
11A
aClip the upstream oxygen sensor wiring harness into
place.
aPosition the turbocharger air outlet pipe.

Page 193 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-76
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
K4M
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lift

Page 197 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Owners Guide 11A-80
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
K4M
11A
II -  REFITTING OPERATION
aRefit the rocker cover.
aPretighten rocker cover bolts 22, 23, 20 and 13
(initial torque) (8 N.m).
a