FORD MUSTANG 2003 Workshop Manual
Page 1111 of 4378
59. Install the stud bolt.
60. Position the engine wire harness.
61. Connect the crankshaft position sensor electrical connector.
62. Install the pin-
type retainer. Klj . 20 ba
282003 Mustang Workshop Manual
17. 11. 2011file:///C:/Ford/2000 - 2004/tsocache/SHEF_4464/S3B~us~en~ ...
Page 1112 of 4378
63. Connect the engine oil pressure sender electrical connector.
64. Connect the camshaft position (CMP) sensor electrical connector.
65. Connect the cylinder head temperature (CHT) sensor.
66. Install the fuel injectors and the fuel injection supply manifold as an assembly. For additional
information, refer to Section 303 - 04A .
67. Install a new upper intake manifold gasket. Klj . 21 ba
282003 Mustang Workshop Manual
17. 11. 2011file:///C:/Ford/2000 - 2004/tsocache/SHEF_4464/S3B~us~en~ ...
Page 1113 of 4378
68.
NOTE: Refer to the location note made during removal and make sure the bolts are installed in
the correct location.
Install the upper intake manifold. Tighten the bolts in two stages in the sequence shown.
zStage 1: Tighten to 10 Nm (89 lb- in).
z Stage 2: Rotate an additional 90 degrees.
69. Connect the exhaust gas recirculation (EGR) vacuum regulator solenoid electrical and vacuum connections. Klj . 22 ba
282003 Mustang Workshop Manual
17. 11. 2011file:///C:/Ford/2000 - 2004/tsocache/SHEF_4464/S3B~us~en~ ...
Page 1114 of 4378
70. Connect the differential pressure feedback EGR system electrical and vacuum connections.
71. Connect the vacuum hoses.
72. Install the positive crankcase ventilation (PCV) tube.
73. Connect the ignition coil and the radio interference capacitor electrical connectors.
74. Position and connect the LH spark plug wires. Klj . 23 ba
282003 Mustang Workshop Manual
17. 11. 2011file:///C:/Ford/2000 - 2004/tsocache/SHEF_4464/S3B~us~en~ ...