clock NISSAN NAVARA 2005 Repair Repair Manual
Page 3089 of 3171
TF-122
TRANSFER ASSEMBLY
7. Install the planetary carrier assembly and sun gear assembly to
the front case, using Tool.
8. Install the snap ring to the sun gear.
CAUTION:
lDo not reuse snap ring.
lDo not damage sun gear.
9. Set the L-H sleeve together with the L-H shift fork assembly onto
the planetary carrier assembly.
10. Install the control shift rod assembly to the front case.
CAUTION:
Set pin of L-H shift fork assembly into the groove of drum
cam.
11. Turn the control shift rod assembly fully counterclockwise.
12. Install the L-H shift rod assembly through the L-H shift fork
assembly opening to the front case.
CAUTION:
Set pin of L-H shift rod assembly into the groove of drum
cam.
13. Install the mainshaft to the sun gear assembly.Tool number : KV38100200
SDIA2791E
PDIA0099E
SDIA2438E
WDIA0215E
WDIA0216E
Page 3094 of 3171
TRANSFER ASSEMBLY
TF-127
C
E
F
G
H
I
J
K
L
MA
B
TF
38. Install the front oil seal until it is flush with the end face of the
front case, using Tool.
CAUTION:
lDo not reuse oil seal.
lApply petroleum jelly to oil seal.
39. Align the matching mark on the front drive shaft with the mark on
the companion flange, then install the companion flange.
40. Install the companion flange self-lock nut. Tighten to the speci-
fied torque, using Tool. Refer toTF-112, "
COMPONENTS".
CAUTION:
Do not reuse self-lock nut.
41. Install the O-ring to the transfer control device.
CAUTION:
lDo not reuse O-ring.
lApply petroleum jelly to O-ring.
42. Install the transfer control device to the rear case.
a. Turn the control shift rod fully counterclockwise using a flat-
bladed screwdriver, and then put a mark on the control shift rod.Tool number : KV38100500
PDIA0117E
SDIA2779E
Tool number : KV40104000
WDIA0219E
SDIA3378E
PDIA0119E