ECU ASTON MARTIN V8 VANTAGE 2010 Workshop Manual
[x] Cancel search | Manufacturer: ASTON MARTIN, Model Year: 2010, Model line: V8 VANTAGE, Model: ASTON MARTIN V8 VANTAGE 2010Pages: 947, PDF Size: 43.21 MB
Page 260 of 947

Engine Structure (03.01)
3-1-12Workshop ManualIssue 4, November 2008
6. Install new gasket on exhaust manifold.
7. Install EGR pipe to exhaust manifold and EGR valve.,
8. Install EGR pipe to EGR valve, install pipe union. Do not
torque tighten at this stage.
9. Install and torque tighten bolts (x2), EGR pipe to exhaust manifold. Torque tighten pipe union.
10. Connect EGR vacuum hose.
11. Connect throttle body multiplug and harness clip.
12. Connect manifold heating hoses (x2).
13. Connect EGR vacuum pipe to sensor and manifold.
14. Install coolant pipe bracket, install and torque tighten bolts (x2) and nuts (x2).
15. Connect multiplugs to EGR valve, fuel rail pressure
sensor and injectors.
16. Install alternator and injector harness fir tree clips (x3) to coolant pipe bracket.
17. Install heater hose clips (x2) and EGR vacuum lines clips (x2) to bracket.
18. Install harness bracket to engine.
19. Refit harness fir tree clips to cylinder head.
20. Refit engine breather hose.
21. Install VVT solenoid multiplug, position coil and CMP harness (1x edge clip).
22. Install coil cover.
23. Connect breather hose to manifold (quickfit).
24. Connect IAT multiplug.
25. Secure injector harness clips (x2) to LH engine cover.
26. Connect injector multiplugs (x4).
27. Install pipe support bracket, install and tighten nuts (x2
and bolts(x2).
28. Install harness support bracket, install and tighten bolt (x1) and, nut (x1).
29. Install heater hoses (x2) an d throttle body hoses (x2) in
support bracket.
30. Connect breather hoses (x2) to engine cover.
31. Install coil cover.
RH/LH Cylinder Head Gasket - Renew
Removal
1. Re-install front subframe to body, install and tighten bolts (x6), remove support trolley.
2. Install and tighten engine mounting nuts (x2).
3. With assistance, remove engine lifting beam (SPX M553D). 4. Remove SAI pump and bracket assembly (see Workshop
Manual procedure 03.08.DB/03.08.DJ Pump and
Bracket Assembly - Secondary Air Injection - Renew).
5. Disconnect multiplugs (x2) from knock sensors.
6. Disconnect multiplug from camshaft timing sensor.
7. Remove RH/LH exhaust manifold (see Workshop Manual procedure 09.00.CC/09.00.CD Gasket -
Exhaust Manifold - RH/LH - Renew).
8. Remove RH/LH intake camshaft (see Workshop Manual procedure 03.09.AT/03.09.AV Camshaft - Intake - RH/
LH - Renew).
9. Remove RH exhaust camshaft bearing cap retaining bolts (x10) evenly and in stages (see Figure 1).
Figure 1
10. Note their orientation and markings and remove the RH
exhaust camshaft bearing caps.
11. Remove RH exhaust camshaft (see Figure 2).
12. Remove bolts (x2) securing front end of RH cylinder
head to cylinder block.
Repair Operation Time (ROT)
Figure 2
A0309258
A0309260
Page 261 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-13
13. Remove bolts (x10), evenly and in stages securing RH
cylinder head to cylinder block (see Figure 3).
Figure 3
14. With assistance, remove RH cylinder head assembly.
15. Remove and discard cylinder head gasket.
Installation
1. Thoroughly clean RH cylind er head face and retaining
bolt pockets.
2. Thoroughly clean RH cylinder block face.
3. Thoroughly clean and dry RH cylinder head retaining
bolts.
4. Install new RH cylinder gasket, locate on dowels.
5. With assistance, install RH cylinder head, locate on dowels.
6. Install and torque tighten cylinder head bolts (x12) in the correct sequence.
7. Lubricate RH exhaust camsha ft journals, camshaft lobes,
bearing surfaces on cylinder head and bearing caps with
clean engine oil.
8. Install RH exhaust camshaft, install bearing caps (x5) in their original positions.
9. Install bolts (x10) and torque tighten in the sequence specified.
10. Install sprocket retaining Torx bolt in camshaft.
11. Rotate camshaft accordingly and check each valve clearance using feeler gauges.
12. Remove sprocket retaining Torx bolt.
13. Install RH/LH intake cams haft (see Workshop Manual
procedure 03.09.AT/03.09.AV Camshaft - Intake - RH/
LH - Renew).
14. Install timing chain tensioni ng tool (303-532) into RH
exhaust camshaft sprocket.
15. Apply a force to the tool (303-532) in an anti-clockwise direction and torque tighten RH sprocket Torx bolts.
Remove special tool.
16. Connect multiplug to cam a haft timing sensor.
17. Connect multiplugs (x2) to knock sensors.
18. Install SAI pump and bracket assembly (see Workshop Manual procedure 03.08.DB/03.08.DJ Pump and
Bracket Assembly - Secondary Air Injection - Renew). 19. Install RH/LH exhaust manifold (see Workshop Manual
procedure 09.00.CC/09.00.CD Gasket - Exhaust
Manifold - RH/LH - Renew).
20. With assistance, position engine support beam (SPX M553D) and secure to engine.
21. Position trolley, support front subframe, remove bolts (x6), raise vehicle, remove trolley.
22. Install and torque tighten engine mounting nuts (x2).
RH/LH Cylinder Head - Overhaul
1. Remove cylinder head gasket - RH (see Workshop Manual procedure 03.01.GU Gasket - Cylinder Head -
RH - Renew).
2. Remove Torx screws (x2) se curing EGR tube to cylinder
head, remove tube.
3. Remove and discard gasket.
4. Remove bolt securing camshaf t timing sensor to cylinder
head, remove sensor.
5. Remove bolts (x2) securing knock sensors (x2) to cylinder head, remove sensors.
6. Remove spark plugs from cylinder head.
7. Remove selective tappet buckets, keep in their fitted order.
8. Position valve spring compressor, compress valve spring (see Figure 1).
Figure 1
9. Remove collets (x2), releas e/remove spring compressor,
collect collar and valve spring.
10. Remove valve from cylinder.
11. Remove valve stem oil seal.
12. Repeat procedure for remaining valve assemblies.
13. Keep valves and springs in their fitted order.
A0310319
Repair Operation Time (ROT)
A0301310
Page 262 of 947

Engine Structure (03.01)
3-1-14Workshop ManualIssue 4, November 2008
14. Inspect cylinder head face for warpage, across centre
and from corner to corner.
15. Check condition and measure free length of valve springs.
16. Decarbonise combustion chambers and exhaust ports.
17. Measure valve stem diameters.
18. Use new valves and check valve guide clearance.
Installation
1. Clean cylinder head face and inlet/exhaust manifold faces. Use and air line to completely dry cylinder head
surfaces.
2. Lubricate and install intake and exhaust valves (x16).
3. Install valve stem oil seals.
4. Install valve springs and collars.
5. Using valve spring compressor, compress valve spring, install collets.
6. Release/remove spring compressor.
7. Repeat procedure for remaining valve assemblies.
8. Install selective tappet buckets in their original fitted positions.
9. Lubricate intake camshaft bearings and journals with clean engine oil.
10. Install intake camshaft, install bearing caps (x5), install bolts (x10).
11. Torque tighten bearing cap bolts in the correct sequence.
12. Lubricate exhaust camshaft be arings and journals with
clean engine oil.
13. Install exhaust camshaft, install bearing caps (x5), install bolts (x10).
14. Torque tighten bearing cap bolts in the correct sequence.
15. Install camshaft sprocket Torx bolts in intake and exhaust camshafts.
16. Rotate intake camshaft clockwise, check and log each valve clearance using feeler gauges.
17. Calculate the correct tappet bucket grade.
18. Repeat procedure for exhaust valve clearances.
19. Remove bearing cap bolts (x10), remove bearing caps (x5), remove intake camshaft.
20. Remove tappet buckets, install selected tappet buckets.
21. Repeat procedure for exhaust valve clearances.
22. Install intake camshaft, install bearing caps (x5), install bolts (x10).
23. Torque tighten bearing cap bolts in the correct sequence.
24. Rotate intake camshaft clockwise, re-check each valve clearance using feeler gauges.
25. Repeat procedure and re-check exhaust valve clearances.
26. Remove camshaft sprocket Torx bolts (x2).
27. Remove bearing cap bolts (x10), remove bearing caps (x5), remove intake camshaft. 28. Remove bearing cap bolts (x10), remove bearing caps
(x5), remove exhaust camshaft.
29. Clean EGR tube.
30. Install new gasket, install EGR tube to cylinder head, install and torque tighten Torx screws (x2).
31. Clean Knock sensors (x2).
32. Install knock sensors (x2) to cylinder head, install and torque tighten bolts (x2).
33. Clean camshaft timing sensor.
34. Install camshaft timing sensor, install and torque tighten bolt.
35. Install spark plugs.
36. Install cylinder head gasket RH (see Workshop Manual procedure 03.01.GU Gasket - Cylinder Head - RH -
Renew).
Cylinder Head (Engine Set) - Overhaul
Removal
1. Remove cylinder head gaskets - engine set (see Workshop Manual procedure 03.10.AL Gasket -
Cylinder Head - Engine Set - Renew).
2. Remove Torx screws (x4) securing EGR tubes to cylinder heads, remove tubes.
3. Remove and discard gaskets.
4. Remove bolts (x2) securing camshaft timing sensors to cylinder heads, remove sensors.
5. Remove bolts (x4) securing knock sensors (x4) to cylinder heads, remove sensors.
6. Remove spark plugs from cylinder heads (x8).
7. Remove selective tappet buckets, keep in their fitted order.
8. Position valve spring compressor, compress valve springs.
9. Remove collets, release/remove spring compressor, collect collars and valve springs.
10. Remove valves from cylinder heads.
11. Remove valve stem oil seals.
12. Keep valves and springs in their fitted order.
13. Inspect cylinder head face for warpage, across centre and from corner to corner.
14. Check condition and measure free length of valve springs.
15. Decarbonise combustion chambers and exhaust ports.
16. Use new valves and check valve guide clearances.
Installation
1. Clean cylinder head face and inlet/exhaust manifold faces. Use and air line to completely dry cylinder head
surfaces.
Repair Operation Time (ROT)
ItemCode
Cylinder Head (Engine Set)-Overhaul LHD03.01.GZ
Cylinder Head (Engine Set)-Overhaul RHD03.01.FZ
Page 268 of 947

Engine Structure (03.01)
3-1-20Workshop ManualIssue 4, November 2008
4. Position valve spring compressor, compress valve springs
(see Figure).
Figure 1
5. Remove collets, release/re move spring compressor,
collect collars and valve springs.
6. Inspect cylinder head face for warpage, across centre and from corner to corner.
Installation
1. Clean cylinder head face and inlet/exhaust manifold faces. Use and air line to completely dry cylinder head
surfaces.
2. Install exhaust valve springs and collars.
3. Using valve spring compressor, compress valve spring, install collets.
4. Release/remove spring compressor.
5. Install exhaust selective tappet buckets in their original fitted positions.
6. Lubricate both exhaust camshaft bearings and journals with clean engine oil.
7. Install both exhaust camshafts , install bearing caps (x10),
install bolts (x20).
8. Torque tighten bearing cap bolts in the correct sequence.
9. Install camshaft sprocket Torx bolts in both exhaust camshafts.
10. Rotate exhaust camshafts clockwise, check and log each valve clearance using feeler gauges.
11. Calculate the correct tappet bucket grade.
12. Remove bearing cap bolts (x20), remove bearing caps (x10), remove both exhaust camshafts.
13. Remove tappet buckets, install selected tappet buckets.
14. Install exhaust camshafts, install bearing caps (x10), install bolts (x20).
15. Torque tighten bearing cap bolts in the correct sequence.
16. Rotate both exhaust camshafts clockwise, re-check each valve clearance using feeler gauges.
17. Remove camshaft sprocket Torx bolts (x4). 18. Remove bearing cap bolts (x20), remove bearing caps
(x10), remove both exhaust camshafts.
19. Install spark plugs.
20. Install cylinder head gaskets - engine set (see Workshop Manual procedure 03.10.AL Gasket - Cylinder Head -
Engine Set - Renew).
RH/LH Cylinder Head Gasket - Renew
(with Engine Removed
)
Removal
1. Remove SAI pump and bracket assembly (see Workshop Manual procedure 03.08. EB Pump and Bracket
Assembly - Secondary Ai r Injection - Renew).
2. Disconnect multiplugs (x2) from knock sensors.
3. Disconnect multiplug from camshaft timing sensor.
4. Remove nuts (x8) securing RH/LH exhaust manifold to
cylinder head.
5. Remove exhaust manifold, remove and discard gasket.
6. Remove RH/LH intake camshaft (see Workshop Manual procedure 03.09.BT/03.09.BV Camshaft - Intake - RH/
LH - Renew With Engine Removed).
7. Remove RH exhaust camshaft bearing cap retaining bolts (x10) evenly and in stages (see Figure)
Figure 1
8. Note their orientation and markings and remove the RH/LH exhaust camshaft bearing caps.
A0301310
Repair Operation Time (ROT)
ItemCode
Cylinder Head Gasket-Renew RH03.01.HU
Cylinder Head Gasket-Renew LH03.01.HV
A0309258
Page 269 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-21
9. Remove RH/LH exhaust camshaft (see Figure 2).
Figure 2
10. Remove bolts (x2) securing front end of RH/LH cylinder
head to cylinder block.
11. Remove bolts (x10), evenly and in stages securing RH/ LH cylinder head to cylinder block (see Figure 3).
Figure 3
12. With assistance, remove RH /LH cylinder head assembly.
13. Remove and discard cylinder head gasket.
Installation
1. Thoroughly clean RH/LH cylinder head face and retaining bolt pockets.
2. Thoroughly clean RH/LH cylinder block face.
3. Thoroughly clean and dry RH cylinder head retaining
bolts.
4. Install new RH/LH cylinder gasket, locate on dowels.
5. With assistance, install RH/LH cylinder head, locate on dowels.
6. Install and torque tighten cylinder head bolts (x12) in the correct sequence.
7. Lubricate RH exhaust camsha ft journals, camshaft lobes,
bearing surfaces on cylinder head and bearing caps with
clean engine oil.
8. Install RH exhaust camshaft, install bearing caps (x5) in their original positions.
9. Install bolts (x10) and torque tighten in the sequence specified.
10. Install sprocket retaining Torx bolt in camshaft. 11. Rotate camshaft accordingly and check each valve
clearance using feeler gauges.
12. Remove sprocket retaining Torx bolt.
13. Install RH intake camsha ft (see Workshop Manual
procedure (03.09.BT/03.09.BV) Camshaft - Intake - RH/
LH - Renew With Engine Removed).
14. Install timing chain tensioni ng tool (303-532) into RH/
LH exhaust camshaft sprocket.
15. Apply a force to the tool (3 03-532) in an anti-clockwise
direction and torque tighten RH/LH sprocket Torx bolts.
Remove special tool.
16. Connect multiplug to camshaft timing sensor.
17. Connect multiplugs (x2) to knock sensors.
18. Clean RH/LH exhaust manifold.
19. Install new RH/LH exhaust manifold gasket, install exhaust manifold.
20. Install and torque tighten RH/LH exhaust manifold nuts (x8).
21. Install SAI pump and bracket assembly (see Workshop Manual procedure 03.08. EB Pump and Bracket
Assembly - Secondary Air Injection - Renew).
Cylinder Head Gasket (Engine Set) -
Renew (with Engine Removed)
Removal
1. Remove SAI pump and bracke t assembly (see Workshop
Manual procedure 03.08.EB Pump and Bracket
Assembly - Secondary Air Injection - Renew).
2. Disconnect multiplugs (x4) from LH and RH knock sensors.
3. Disconnect multiplugs (x2) from LH and RH camshaft
timing sensors.
4. Remove nuts (x8) securing LH exhaust manifold to cylinder head.
5. Remove LH exhaust manifold, remove and discard gasket.
6. Remove LH intake camshaft (see Workshop Manual procedure 03.09.BV Camshaft - Intake - LH - Renew
With Engine Removed).
A0309260
A0310319
Repair Operation Time (ROT)
Page 270 of 947

Engine Structure (03.01)
3-1-22Workshop ManualIssue 4, November 2008
7. Remove LH exhaust camshaft bearing cap retaining
bolts (x10) evenly and in stages (see Figure).
Figure 1
8. Note their orientation and markings and remove the LH exhaust camshaft bearing caps.
9. Remove LH exhaust ca mshaft (see Figure 2).
Figure 2
10. Remove bolts (x2) securing front end of LH cylinder
head to cylinder block.
11. Remove bolts (x10), evenly and in stages securing LH cylinder head to cylinder block (see Figure 3).
Figure 3
12. With assistance, remove LH cylinder head assembly.
13. Remove and discard cylinder head gasket.
14. Remove nuts (x8) securing RH exhaust manifold to cylinder head.
15. Remove LH exhaust manifold, remove and discard gasket.
16. Remove Torx bolts (x2), spacer on exhaust Torx bolt, securing RH intake and exhaust camshaft sprockets to
camshafts (see Figure 4).
Figure 4
17. Remove bolts (x2) securing RH secondary timing chain
tensioner to cylinder head (see Figure 5).
Figure 5
A0309270
A0309272
A0310319
A0309252
A0309253
Page 271 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-23
18. Remove RH camshaft sprockets complete with timing
chain and tensioner from camshafts (see Figure 6).
Figure 6
19.Remove bolts (x3) securing tool (303-1215) to cylinder head, remove special tool (see Figure 7).
Figure 7
20. Remove RH intake camshaft bearing cap retaining bolts (x10) evenly and in stages (see Figure 8).
Figure 8
21. Note their orientation and markings and remove the RH intake camshaft bearing caps.
22. Remove RH intake camshaft (see Figure 9).
Figure 9
A0309254A0309271
A0309258
A0309259
Page 272 of 947

Engine Structure (03.01)
3-1-24Workshop ManualIssue 4, November 2008
23. Remove RH exhaust camshaft bearing cap retaining
bolts (x10) evenly and in stages (see Figure 10).
Figure 10
24. Note their orientation and markings and remove the RH exhaust camshaft bearing caps.
25. Remove RH exhaust camshaft (see Figure 11).
Figure 11
26. Remove bolts (x2) securing front end of RH cylinder head to cylinder block.
27. Remove bolts (x10), evenly and in stages securing RH cylinder head to cylinder block (see Figure 12).
Figure 12
28. With assistance, remove RH cylinder head assembly.
29. Remove and discard cylinder head gasket.
Installation
1. Thoroughly clean LH and RH cylinder head faces and retaining bolt pockets.
2. Thoroughly clean LH and RH cylinder block faces.
3. Thoroughly clean and dry LH and RH cylinder head retaining bolts.
4. Install new RH cylinder gasket, locate on dowels.
5. With assistance, install RH cylinder head, locate on dowels.
6. Install and torque tighten cylinder head bolts (x12) in the correct sequence.
7. Lubricate camshaft journals , camshaft lobes, bearing
surfaces on cylinder head and bearing caps with clean
engine oil.
8. Install RH exhaust camshaft, install bearing caps (x5) in their original positions.
9. Install bolts (x10) and torque tighten in the sequence specified.
10. Install sprocket retaining Torx bolt in camshaft.
11. Rotate camshaft accordingly and check each valve clearance using feeler gauges.
12. Repeat procedure and install RH intake camshaft.
13. Remove sprocket retaining Torx bolt.
14. Rotate RH intake and exhaust camshafts until timing flats on each camshaft face uppermost.
15. Install tool (303-530) to RH cylinder head to secure camshafts, install and tighten bolts (x3).
16. Install new LH cylinder gasket, locate on dowels.
17. With assistance, install LH cylinder head, locate on dowels.
18. Install and torque tighten cylinder head bolts (x12) in the correct sequence.
19. Lubricate LH exhaust camshaf t journals, camshaft lobes,
bearing surfaces on cylinder head and bearing caps with
clean engine oil.
20. Install LH exhaust camshaft, install bearing caps (x5) in their original positions.
21. Install bolts (x10) and torque tighten in the sequence specified.
22. Install sprocket retaining Torx bolt in LH exhaust camshaft.
23. Rotate LH exhaust camshaft accordingly and check each valve clearance using feeler gauges.
24. Remove sprocket retaining Torx bolt.
25. Install LH intake camshaft (see Workshop Manual procedure 03.09.BV Camshaft - Intake - LH - Renew
With Engine Removed).
26. Install timing chain tensio ning tool (303-532) into RH
exhaust camshaft sprocket.
27. Apply a force to the tool (303-532) in an anti-clockwise direction and torque tighten RH sprocket Torx bolts.
Remove special tool.
28. Connect multiplugs to LH and RH camshaft timing sensors.
A0309258
A0309260
A0310319
Page 282 of 947

Lubrication System (03.02)
Engine (03.00)3-2-8 Workshop Manual Issue 5, Janauary 2010
13. Remove bolts (x16) that attach the sump to engine bedplate (refer to Figure 9).
14. Release and remove sump.
Installation
1. Clean old sealant from sump flange and engine bedplate.
2. Ensure that sump flange and mating face on engine bedplate are clean and dry.
3. Apply a continuous 3mm diameter bead of RTV sealant to sump flange as recommended.
4. Ensure that there are no gaps in sealant track.
5. Install sump, install bolts (x16). Do not torque tighten at this stage.
6. Install bolts (x4), sump to torque tube, lightly tighten bolts and then loosen bolts.
7. Torque tighten sump bolts (x16) in the recommended sequence.
8. Torque tighten sump to torque tube bolts (x4).
9. Install A/C compressor mounting bracket, install and torque tighten Torx bolts (x4).
10. Lubricate and install new O-ring seals to oil pipes.
11. Install oil pipes in sump, install and torque tighten bolts (x2)
12. Install compressor, install and torque tighten bolts (x4). 13. Connect multiplug to A/C compressor.
14. Install LH and RH HEGO
sensor multiplug brackets to
sump. Install and torque tighten bolts (x4).
15. Secure harness clips (x6) in sump.
16. Connect multiplug to crankshaft timing sensor.
17. Connect multiplug to engine electric coolant temperature sensor.
18. Connect multiplug to oil pressure sensor.
19. Install oil pump(s) drive chain (refer to Workshop
Manual procedure 03.02.AJ Chain - Oil Pump - Renew).
Oil Cooler - Renew
Removal
1. Raise vehicle on ramp.
2. Remove undertray (refer to Workshop Manual procedure 01.02.NB Undertray - Front - Renew).
3. Remove pipes from oil cooler (position container to catch oil) (refer to Figure).
Figure 1
4. Remove oil cooler from body (bolts x4).
5. Remove duct from oil cooler (bolts x4).
Installation
1. Install duct from to cooler (bolts x4) (torque).
2. Install oil cooler to body (bolts x4) (torque).
3. Install pipes to oil cooler (torque).
4. Install undertray (refer to Workshop Manual procedure 01.02.NB Undertray - Front - Renew).
5. Lower vehicle on ramp.
Figure 9
WAR NI NG
DO NOT GET USED ENGINE OIL ON YOUR SKIN. USED ENGINE OIL CAN BE HARMFUL.
A030206D
Repair Operation Time (ROT)
ItemCode
Oil Cooler - Renew 03.02.BX
WAR NI NG
DO NOT GET USED ENGINE OIL ON YOUR SKIN. USED ENGINE OIL CAN BE HARMFUL.
Caution
Make sure that all open ends of oil cooler pipes and oil cooler connections are plugged to prevent dirt or
foreign material entering the lubrication system.
Page 293 of 947

Lubrication System (03.02)
Engine (03.00)
Issue 5, Janauary 2010 Workshop Manual 3-2-19
11. Remove Torx bolts (x4) that attach the A/C compressor mounting bracket to engine bedplate and sump.
Remove bracket (refer to Figure 7).
12. Remove bolts (x16) that attach the sump to engine bedplate (refer to Figure 8).
13. Release and remove sump.
Installation
1. Clean old sealant from sump flange and engine bedplate.
2. Ensure that sump flange and mating face on engine bedplate are clean and dry.
3. Apply a continuous 3mm diameter bead of RTV sealant to sump flange as recommended.
4. Ensure that there are no gaps in sealant track. 5. Install sump, install and torque tighten bolts (x16) in the
correct sequence.
6. Install A/C compressor mounting bracket, install and torque tighten Torx bolts (x4).
7. Lubricate and install new O-ring seals to oil pipes.
8. Install oil pipes in sump, install and torque tighten bolts (x2)
9. Install compressor, install and torque tighten bolts (x4).
10. Connect multiplug to A/C compressor.
11. Install LH and RH HEGO se nsor multiplug brackets to
sump. Install and torque tighten bolts (x4).
12. Secure harness clips (x6) in sump.
13. Connect multiplug to crankshaft timing sensor.
14. Connect multiplug to engine electric coolant temperature sensor.
15. Connect multiplug to oil pressure sensor.
16. Install oil pump(s) drive chain (refer to Workshop Manual procedure 03.02.BJ Chain - Oil Pump - Renew
With Engine Removed).
Figure 7
Figure 8
A0302303
A030206D