steering DODGE NEON 1999 Service Repair Manual

DODGE NEON 1999 Service Repair Manual NEON 1999 DODGE DODGE https://www.carmanualsonline.info/img/12/56911/w960_56911-0.png DODGE NEON 1999 Service Repair Manual

Page 687 of 1200

DODGE NEON 1999  Service Repair Manual Fig. 9 Visor/Vanity Connections
Fig. 10 Steering Column Connections
8W - 90 - 34 8W - 90 CONNECTOR/GROUND LOCATIONSPL
DESCRIPTION AND OPERATION (Continued)

Page 733 of 1200

DODGE NEON 1999  Service Repair Manual (8) Disconnect throttle body linkage.
(9) Disconnect engine wiring harness.
(10) Disconnect heater hoses.
(11) Discharge Air Conditioning System. Refer to
Group 24, Air Conditioning for procedure.
(12

Page 734 of 1200

DODGE NEON 1999  Service Repair Manual (8) Install A/C compressor and hoses. Refer to
Group 24, Heater and Air Conditioning for procedure.
(9) Install accessory drive belts. Refer to Group 7,
Cooling System Accessory Drive Section for belt

Page 736 of 1200

DODGE NEON 1999  Service Repair Manual ²Zero the dial indicator.
²Move camshaft forward to limits of travel and
read dial indicator.
²End play travel: 0.13 - 0.33 mm (0.005 - 0.013
in.).
(5) Install front camshaft seal. Camshaft must be

Page 738 of 1200

DODGE NEON 1999  Service Repair Manual INSTALLATION
(1) Install valve seal/valve spring seat assembly
as outlined in the Valve Installation procedure in this
section.
(2) Using Special Tool MD-998772A compress valve
springs only enough to

Page 740 of 1200

DODGE NEON 1999  Service Repair Manual For the rest of installation, reverse removal proce-
dure.
(3) Perform camshaft and crankshaft timing
relearn procedure as follows:
²Connect the DRB scan tool to the data link
(diagnostic) connector.

Page 743 of 1200

DODGE NEON 1999  Service Repair Manual (3) Remove crankshaft damper bolt. Remove
damper using the large side of Special Tool 1026 and
insert 6827-A (Fig. 42).
(4) Lower vehicle and place a jack under engine.
(5) Remove right engine mount.

Page 745 of 1200

DODGE NEON 1999  Service Repair Manual pulley bracket and tighten fasteners to 31 N´m (275
in. lbs.) (Fig. 51).
(11) Pull tensioner plunger pin. Pretension is cor-
rect when pin can be removed and installed.
(12) Rotate crankshaft 2 revol

Page 747 of 1200

DODGE NEON 1999  Service Repair Manual (3) Remove crankshaft damper bolt. Remove
damper using the large side of Special Tool 1026 and
insert 6827-A (Fig. 56).
(4) Lower vehicle and place a jack under engine.
(5) Remove right engine mount.

Page 748 of 1200

DODGE NEON 1999  Service Repair Manual CAMSHAFT AND CRANKSHAFT TIMING
PROCEDURE AND BELT INSTALLATIONÐ
SOHC ENGINE
(1) Set crankshaft sprocket to TDC by aligning the
sprocket with the arrow on the oil pump housing,
then back off to 3 notc