NISSAN TERRANO 2004 Service Repair Manual
Manufacturer: NISSAN, Model Year: 2004, Model line: TERRANO, Model: NISSAN TERRANO 2004Pages: 1833, PDF Size: 53.42 MB
Page 531 of 1833

Description
When the gear position is in ªNeutralº, neutral position is ªONº.
ECM detects the position because the continuity of the line (the
ªONº signal) exists.
CONSULT-II Reference Value in Data Monitor
Mode
Specification data are reference values.
MONITOR ITEMCONDITION SPECIFICATION
P/N POSI SW IIgnition switch: ON Shift lever: Park/Neutral ON
Except above OFF
ECM Terminals and Reference Value
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may damage the
ECM's transistor. Use a ground other than ECM terminals, such as the ground.
TER-
MINAL NO. WIRE
COLOR ITEM CONDITION DATA (DC Voltage)
22 BR/Y
(A/T
mod-
els)
G (M/T
mod-
els) Park/Neutral position
switch
Ignition switch ªONº
Gear position is ªNeutralº (M/T models)
Gear position is ªPº or ªNº (A/T models)
Approximately 0V
Ignition switch ªONº
Except the above gear position BATTERY VOLTAGE
(11 - 14V)
MEC029E
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
EC-256
http://vnx.su/
Page 532 of 1833

Wiring Diagram
YEC197A
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
EC-257
http://vnx.su/
Page 533 of 1833

Diagnostic Procedure
FOR M/T MODELS
1 CHECK OVERALL FUNCTION
With CONSULT-II
1. Turn ignition switch ªONº.
2. Select ªP/N POSI SWº in ªDATA MONITORº mode with CONSULT-II.
3. Check ªP/N POSI SWº signal under the following conditions.
SEF049Y
Without CONSULT-II
1. Turn ignition switch ªONº.
2. Check voltage between ECM terminal 22 and ground under the following conditions.
SEF419Y
OK or NG
OK EINSPECTION END
NG EGO TO 2.
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
EC-258
http://vnx.su/
Page 534 of 1833

2 CHECK PNP SWITCH GROUND CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch ªOFFº.
2. Disconnect park/neutral position (PNP) switch harness connector.
MEC029E
3. Check harness continuity between PNP switch terminal 2 and body ground. Refer to Wiring Diagram.Continuity should exist.
4. Also check harness for short to ground and short to power.
OK or NG
OK EGO TO 3.
NG ERepair open circuit or short to ground or short to power in harness or connectors.
3 CHECK PNP SWITCH INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Disconnect ECM harness connector.
2. Check harness continuity between ECM terminal 22 and PNP switch terminal 1. Refer to Wiring Diagram.
Continuity should exist.
3. Also check harness for short to ground and short to power.
OK or NG
OK EGO TO 5.
NG EGO TO 4.
4 DETECT MALFUNCTIONING PART
Check the following.
IHarness connectors M842, F135 (RHD models)
I Harness connectors F108, E225
I Harness for open or short between PNP switch and ECM
ERepair open circuit or short to ground or short to power in harness or connectors.
5 CHECK PARK/NEUTRAL POSITION SWITCH
Refer to MT section (ªPOSITION SWITCH CHECKº).
OK or NG
OK EGO TO 6.
NG EReplace park/neutral position switch.
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
Diagnostic Procedure (Cont'd)
EC-259
http://vnx.su/
Page 535 of 1833

6 CHECK INTERMITTENT INCIDENT
Refer to ªTROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENTº, EC-78.EINSPECTION END
FOR A/T MODELS
1 CHECK OVERALL FUNCTION
With CONSULT-II
1. Turn ignition switch ªONº.
2. Select ªP/N POSI SWº in ªDATA MONITORº mode with CONSULT-II.
3. Check ªP/N POSI SWº signal under the following conditions.
SEF049Y
Without CONSULT-II
1. Turn ignition switch ªONº.
2. Check voltage between ECM terminal 22 and ground under the following conditions.
SEF419Y
OK or NG
OK EINSPECTION END
NG EGO TO 2.
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
Diagnostic Procedure (Cont'd)
EC-260
http://vnx.su/
Page 536 of 1833

2 CHECK PARK/NEUTRAL POSITION RELAY POWER SUPPLY CIRCUIT
Without CONSULT-II
1. Turn ignition switch ªOFFº.
2. Disconnect park/neutral position (PNP) relay harness connector.
MEC029E
3. Turn ignition switch ªONº.
4. Check voltage between PNP relay terminal 2 and ground under the following conditions.
MEC981D
MTBL1320
OK or NG
OK EGO TO 7.
NG EGO TO 3.
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
Diagnostic Procedure (Cont'd)
EC-261
http://vnx.su/
Page 537 of 1833

3 CHECK PARK/NEUTRAL POSITION SWITCH POWER SUPPLY CIRCUIT
1. Turn ignition switch ªOFFº.
2. Disconnect park/neutral position (PNP) switch harness connector.
MEC029E
3. Check voltage between PNP switch terminal 1 and ground.
YEC710A
Voltage: Battery voltageOK or NG
OK EGO TO 5.
NG EGO TO 4.
4 DETECT MALFUNCTIONING PART
Check the following.
IHarness connectors F93, M788 (LHD models)
I Fuse block (J/B) connector F113 (LHD models)
I Fuse block (J/B) connector M834 (RHD models)
I 10A fuse
I Harness for open or short between PNP switch and fuse
ERepair harness or connectors.
5 CHECK PNP SWITCH GROUND CIRCUIT FOR OPEN AND SHORT
1. Check harness continuity between PNP switch terminal 2 and PNP relay terminal 2.
Refer to Wiring Diagram.
Continuity should exist.
2. Also check harness for short to ground and short to power.
OK or NG
OK EGO TO 6.
NG ERepair open circuit or short to ground or short to power in harness or connectors.
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
Diagnostic Procedure (Cont'd)
EC-262
http://vnx.su/
Page 538 of 1833

6 CHECK PARK/NEUTRAL POSITION SWITCH
Refer to AT section, ªPark/neutral position switchº.OK or NG
OK EGO TO 11.
NG EReplace PNP switch.
7 CHECK PNP RELAY GROUND CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch ªOFFº.
2. Check harness continuity between PNP relay terminals 1, 6 and engine ground.
Refer to Wiring Diagram.
Continuity should exist.
3. Also check harness for short to power.
OK or NG
OK EGO TO 8.
NG ERepair open circuit or short to power in harness or connectors.
8 CHECK PNP SWITCH INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Disconnect ECM harness connector.
2. Check harness continuity between ECM terminal 22 and PNP relay terminal 7.
Refer to Wiring Diagram.
Continuity should exist.
3. Also check harness for short to ground or short to power.
OK or NG
OK EGO TO 10.
NG EGO TO 9.
9 DETECT MALFUNCTIONING PART
Check the following.
IHarness connectors F93, M788 (LHD models)
I Harness for open or short between ECM and PNP relay
ERepair open circuit or short to ground or short to power in harness or connectors.
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
Diagnostic Procedure (Cont'd)
EC-263
http://vnx.su/
Page 539 of 1833

10 CHECK PNP RELAY
1. Apply 12V direct current between PNP relay terminals 1 and 2.
2. Check continuity between PNP relay terminals 3 and 5, 6 and 7.
SEF296X
OK or NG
OK EGO TO 11.
NG EReplace PNP relay.
11 CHECK INTERMITTENT INCIDENT
Perform ªTROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENTº, EC-78.
EINSPECTION END
PARK/NEUTRAL POSITION (PNP) SWITCHZD30DDTi
Diagnostic Procedure (Cont'd)
EC-264
http://vnx.su/
Page 540 of 1833

Component Description
The heat up switch is located on the lower side of the instrument
panel. This switch is used to speed up the heater's operation when
the engine is cold.
When the ECM received the heat up switch ªONº signal, the ECM
increases the engine idle speed to 1,100 to 1,200 rpm to warm up
engine quickly.
This system works when all conditions listed below are met.
Heat up switchON
Engine coolant temperature Below 105ÉC (221ÉF)
Shift lever ªPº or ªNº
Accelerator pedal Fully released
CONSULT-II Reference Value in Data Monitor
Mode
Specification data are reference values.
MONITOR ITEMCONDITION SPECIFICATION
WARM UP SW IIgnition switch: ON Heat up switch: ON ON
Heat up switch: OFF OFF
ECM Terminals and Reference Value
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may damage the
ECM's transistor. Use a ground other than ECM terminals, such as the ground.
TER-
MINAL NO. WIRE
COLOR ITEM CONDITION D ATA
(DC Voltage and Pulse Signal)
59 G Heat up switch Ignition switch ªONº
Heat up switch is ªOFFº.
0V
Ignition switch ªONº
Heat up switch is ªONº. BATTERY VOLTAGE
(11 - 14V)
HEAT UP SWITCHZD30DDTi
EC-265
http://vnx.su/