NISSAN TEANA 2014 Service Manual

Page 301 of 4801


REPLACEMENT OPERATIONSBRM-23
< REMOVAL AND INSTALLATION >
C
D E
F
G H
I
J
L
M A
B
BRM
N
O P
REPLACEMENT OPERATIONS
DescriptionINFOID:0000000009464973
This section is prepared for technicians who have attai ned a high level of skill and experience in repairing col-
lision-damaged vehicles and also use modern servic e tools and equipment. Persons unfamiliar with body
repair techniques should not attempt to repair collision-damaged vehicles by using this section.
Technicians are also encouraged to read Body Repair M anual (Fundamentals) in order to ensure that the orig-
inal functions and quality of the vehicle can be mainta ined. The Body Repair Manual (Fundamentals) contains
additional information, including cautions and warning, that are not including in this manual. Technicians
should refer to both manuals to ensure proper repairs.
Please note that these information are prepared for wo rldwide usage, and as such, certain procedures might
not apply in some regions or countries.
Revision: November 20132014 Altima NAM

Page 302 of 4801


BRM-24
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
The symbols used in this section for cutting and welding/brazing operations are shown below.
PIIA0149E
Revision: November 20132014 Altima NAM

Page 303 of 4801


REPLACEMENT OPERATIONSBRM-25
< REMOVAL AND INSTALLATION >
C
D E
F
G H
I
J
L
M A
B
BRM
N
O P
• Front pillar butt joint can be determined anywhere within shaded area as shown. The best location for the butt joint is at position (A)
due to the construction of the vehicle. Refer to the front pillar sec-
tion.
• Determine cutting position and record distance from the locating indent. Use this distance when cutting the service part. Cut outer
front pillar over 60 mm above inner front pillar cut position.
• Prepare a cutting jig to make outer pillar easier to cut. Also, this will permit service part to be accurately cut at joint position.
• An example of cutting operation using a cutting jig is as follows.
1. Position of outer pillar (A) on cut line and inner pillar
2. Align cutting line with notch on jig. Clamp jig to pillar.
3. Cut outer pillar along groove of jig. (At position A)
4. Remove jig and cut remaining portions.
5. Cut inner pillar in the same manner.
PIIA0150E
PIIA0151E
PIIA0152E
PIIA0153E
Revision: November 20132014 Altima NAM

Page 304 of 4801


BRM-26
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
Hoodledge
INFOID:0000000009464974
AWKIA2316ZZ
Change parts z A. Hoodledge upper front z B. Core support upper z
C
D G. Strut housing (LH)
z D. Hoodledge connector z E. Hoodledge reinforcement z F. Hoodledge reinforcement rear
Revision: November 20132014 Altima NAM

Page 305 of 4801


REPLACEMENT OPERATIONSBRM-27
< REMOVAL AND INSTALLATION >
C
D E
F
G H
I
J
L
M A
B
BRM
N
O P
Unit: mm (in)
Front
AWKIA2222ZZ
Revision: November 20132014 Altima NAM

Page 306 of 4801


BRM-28
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
Front Side Member (Partial Replacement)
INFOID:0000000009464975
Front PillarINFOID:0000000009464976
FRONT PILLAR OUTER - EARLY PRODUCTION MODELS
ALKIA2585ZZ
Change parts z Front side member front assembly
Revision: November 20132014 Altima NAM

Page 307 of 4801


REPLACEMENT OPERATIONSBRM-29
< REMOVAL AND INSTALLATION >
C
D E
F
G H
I
J
L
M A
B
BRM
N
O P
Early Production Models
Work after hoodledge and hoodledge reinforcement rear has been removed.
Early Production Models
Manufacturing Plant Smyrna: built before 10/25/2012
Canton: built before 11/07/2012
AWKIA2473ZZ
Revision: November 20132014 Altima NAM

Page 308 of 4801


BRM-30
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
FRONT PILLAR OUTER - LATE PRODUCTION MODELS
Late Production Models
Work after hoodledge and hoodledge reinforcement rear has been removed.
Change parts
z Front pillar section of body side outer
A. Recommended sectioning location Front
Manufacturing Plant Smyrna: built on 10/25/2012 or later
Canton: built on 11/07/2012 or later
Revision: November 20132014 Altima NAM

Page 309 of 4801


REPLACEMENT OPERATIONSBRM-31
< REMOVAL AND INSTALLATION >
C
D E
F
G H
I
J
L
M A
B
BRM
N
O P
Late Production Models
FRONT PILLAR REINFORCEMENT
Work after front pillar outer has been removed.
AWKIA2458ZZ
Change parts
z Front pillar section of body side outer
A. Recommended sectioning location Front
Revision: November 20132014 Altima NAM

Page 310 of 4801


BRM-32
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
FRONT PILLAR INNER - EARLY PRODUCTION MODELS
Change parts
z Front pillar re inforcement
Front
AWKIA2225ZZ
Revision: November 20132014 Altima NAM

Page:   < prev 1-10 ... 261-270 271-280 281-290 291-300 301-310 311-320 321-330 331-340 341-350 ... 4810 next >