engine coolant ISUZU KB P190 2007 Workshop Repair Manual

ISUZU KB P190 2007 Workshop Repair Manual KB P190 2007 ISUZU ISUZU https://www.carmanualsonline.info/img/61/57177/w960_57177-0.png ISUZU KB P190 2007 Workshop Repair Manual

Page 2014 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6-14 ENGINE DIAGNOSIS (C24SE) 
Malfunction Indicator Lamp  
The instrument panel "CHECK ENGINE" Malfunction  
Indicator lamp (MIL) illuminates by self diagnostic 
system when the system checks the sta

Page 2016 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A-2 ENGINE MECHANICAL (C24SE) 
PAGE 
Camshaft Housing, Check for Plance Surface .........................................................   6A-39  
Cylinder Head, Removal and Installation............

Page 2025 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-11 
Main Data and Specifications 
Engine - General C24SE 
Engine type Four-cycle, water cooled cross-flow with single over head 
camshaft  
Micro-computer control, fuel in

Page 2027 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-13 
Valve System C24SE 
Actuation Type  Direct-acting Inverted Bucked Tappet 
Valve Clearance Adjustment  Hydraulic 
Valve Rotor Type  None 
Inlet-Valve Material Chromium

Page 2041 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-27 
 
 
 
Seal Ring, Camshaft Housing, Timing Side 
Removal 
  1.  Remove front toothed belt cover toothed belt from camshaft timing gear according to the corresponding

Page 2049 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-35 
  Camshaft Housing, Removal and  
Installation 
   Cylinder Head 
Important! 
Remove cylinder head only from cold engine (room  
temperature).  
 
 
 
Removal 
  1.  R

Page 2077 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-63 
OPERATIONS ON COOLING SYSTEM 
 Caution! 
Before working with the cooling system, be sure to confirm that  
the temperature of the engine is cooled down. 
Failure to ob

Page 2078 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A-64 ENGINE MECHANICAL (C24SE) 
 Important! 
Do not loosen or open the radiator cap when coolant is hot.  
Doing so may cause hot water or steam to splash out, resulting 
in burn. W hen opening the r

Page 2080 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A-66 ENGINE MECHANICAL (C24SE) 
 
Installation 
Follow the removal procedure in the reverse order to install the  
radiator.  
 
 
  
 Thermostat 
Removal 
  1.  Remove water outlet nozzles with ther

Page 2081 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-67 
 
 Coating sealing surfaces with Silicone Grease 
Installation 
  1.  Install water pump to cylinder block with new rubber O-ring. 
  2.  Apply tension to toothed belt