torque MAZDA PROTEGE 1992 Owner's Guide

MAZDA PROTEGE 1992 Owner's Guide PROTEGE 1992 MAZDA MAZDA https://www.carmanualsonline.info/img/28/57077/w960_57077-0.png MAZDA PROTEGE 1992 Owner's Guide

Page 114 of 1164

MAZDA PROTEGE 1992 Owners Guide Bl ASSEMBLY 
No.1 CYLINDER No.4 CYLINDER 
0311081-14 
No.1 CYLINDER 
No.4 CYLINDER 
INTAKE 
\. A 
0’ Y Y 0 1 
” 
P 
/ Y) 
6 
EXHAUST 
No.1, 2 CYLINDERS No.3, 4 CYLINDERS 
(IN & EX) (IN & EX) 
93UO

Page 115 of 1164

MAZDA PROTEGE 1992 Owners Guide ASSEMBLY 81 
23UOBl-05. 2 
Y@ 0311081-206 
03UOBl-20 
03UOBl-15’ 
2. Install the rocker arm and rocker shaft assembly. 
Caution 
l The bolts must be tightened gradually and in the or- 
der shown. 
3

Page 116 of 1164

MAZDA PROTEGE 1992 Owners Guide ASSEMBLY 
TIMING BELT 
Torque Specifications 
78-l 1 N-m (80-l 10 -kg, 69-95 in-lb) 
12-17 (1.25-1.75, 109-152) N-m (m-kg, Mb) 
03UOBl-15 2 
Timing Belt Tensioner 
1. Install the tensioner and the ten

Page 117 of 1164

MAZDA PROTEGE 1992 Owners Guide ASSEMBLY Bl 
CYLINDER HEAD 
MARKS 
03UOBl-15! 
TENSION 
SIDE 
03UOBl-15 
03UOBl-15 
03UOBl-158 
I 
98 N 
(10 kg, 22 lb) 
1 
03UOBl-159 
2. Verify that the camshaft pulley marks are aligned with the 
c

Page 118 of 1164

MAZDA PROTEGE 1992 Owners Guide Bl ASSEMBLY 
1IMING 
COVER 
Timing Belt Cover 
1. Install the lower and upper timing belt covers and new 
gaskets. 
Tightening torque: 
7.8-l 1 N-m (80-l 10 cm-kg, 69-95 in-lb) 
Crankshaft Pulley 
1.

Page 119 of 1164

MAZDA PROTEGE 1992 Owners Guide ASSEMBLY Bl 
AUXILIARY PARTS 
Torque Specifications 
DRIVE BELT 
INSTALLATION 
PAGE Bl-6 19-25 (1.9-2.6, 14-19) 
w-113 (9.5-11.5, 69-83) I _______ _ - ..- - -, 
(3.8-5.3, 27-38) 
 19-25 Il.9-2.8. 14-

Page 120 of 1164

MAZDA PROTEGE 1992 Owners Guide Bl ASSEMBLY 
05UOBX-24: 
Spark Plug 
1. Install the spark plugs. 
Tightening torque: 
15-23 N*m (1.5-2.3 m-kg, 1 I-17 ft-lb) 
Oil Level Gauge 
1. Install the oil level gauge. 
Oil Pressure switch 
1.

Page 121 of 1164

MAZDA PROTEGE 1992 Owners Guide ASSEMBLY Bl 
03UOBl-16 
03UOB1.21 38 
Injector and Distribution Pipe Assembly (BP SOHC) 
1. Install the injector and distribution pipe assembly with new 
insulators. 
Tightening torque: 
19-25 N-m (1.

Page 122 of 1164

MAZDA PROTEGE 1992 Owners Guide Bl ENGINE STAND DISMOUNTING 
ENGINE STAND DISMOUNTING 
PROCEDURE 
1. Remove the engine from the SST (engine stand). 
2. 
Remove the SST (engine hanger) from the engine. 
3. Install the parts shown in

Page 123 of 1164

MAZDA PROTEGE 1992 Owners Guide ENGINE STAND DISMOUNTING Bl 
VIEW A 
c==A 
03UOBi -17 
I 
03UOBi-2C 
05UOBX-25 
03UOBl-171 
OWOBX-25 
3. Apply a small amount of engine coolant to the new O-ring. 
4. Install the water bypass pipe. 
E