sensor SSANGYONG KORANDO 1997 Service Repair Manual
[x] Cancel search | Manufacturer: SSANGYONG, Model Year: 1997, Model line: KORANDO, Model: SSANGYONG KORANDO 1997Pages: 2053, PDF Size: 88.33 MB
Page 625 of 2053

1B3 -- 76 OM600 ENGINE MECHANICAL
D AEW OO M Y_2000
Removal Procedure
1. Remove the starter motor and install the engine lock
into the wheel ring gear.
Engine Lock 602 589 00 40 00
2. Remove the poly V-- belt.
3. Remove the cooling fan.
Notice
Keep the fan in vertical position.
4. Remove the cooling fan belt pulley (2).
5. Place alignment marks (arrow) on the vibration
damper (5) and crankshaft belt pulley (4).
6. Remove the timing sensor bracket.
Notice
Remove if necessary.
Page 628 of 2053

OM600 ENGINE MECHANICAL 1B3 -- 79
D AEW OO M Y_2000
5. Install the timing sensor bracket.
Notice
See the ’TDC setting’.
6. Install the cooling fan pulley.
Tightening Torque10 N∙m(89lb-in)
7. Install the cooling fan.
8. Install the fan belt.
9. Remove the engine lock.
Page 641 of 2053

1B3 -- 92 OM600 ENGINE MECHANICAL
D AEW OO M Y_2000
24. Insert the new connecting rod bearing shells into the
connecting rod and connecting rod bearing cap and
tighten the 12--sided stretch bolts (11).
Tightening Torque40 N∙m (30 lb-ft) + 90_
25. Measure inner diameter of connecting rod bearing.
26. Measure connecting rod bearing journal diameter
(K).
Notice
Refer to measurement of the crankshaft bearing
journal diameter.
27. Measure the radial clearance (L) of the connecting
rod bearing.
Example) Measured value ’J’ = 47.700mm
Measured value ’K’ = 47.653mm
——————————————
Clearance ’L’ = 0.047mm
Radial Clearance ’L’0.026 -- 0.068mm
Notice
If the clearance is out of standard, adjust the radial
clearance of connecting rod bearing by replacing the
connecting rod bearing shells.
28. Remove the connecting rod bearing cap.
29. Install the piston.
30. Rotate the crankshaft by hand and check whether it
rotates smoothly.
31. If the bearings are damaged,
-- replace the oil presser relief valve.
-- clean the oil pump and oil filter housing carefully
and replace the hose if necessary.
Notice
After assembling the engine, check the camshaft
timing, adjust the start of fuel injection and check the
TDC sensor bracket setting.
32. Fill oil and run the engine and then check the oil
pressure and oil level.
Notice
Install the original oil filter element and then change
the engine oil and oil filter element after 1,000 --
1,500km.
Page 743 of 2053

1D3 -- 8 OM600 ENGINE COOLING
D AEW OO M Y_2000
WATER PUMP HOUSING
Preceding Work : Removal of water pump
Removal of thermostat
Removal of generator
1 Gasket Replace..........................
2 Water Pump Housing
3 Connector
4Bolt 10N∙m (89 lb-in) .....................5 Coolant Hose
6ReturnPipe
7 O -- Ring
8 Temperature Sensor
Notice
The bolt on the arrow should be installed last.
Page 763 of 2053

D AEW OO M Y_2000
SECTION 1F3
OM600 ENGINE CONTROLS
Caution: Disconnect the negative battery cable before removing or installing any electrical unit or when a
tool or equipment could easily come in contact with exposed electrical terminals. Disconnecting this cable
will help prevent personal injury and damage to the vehicle. The ignition must also be in LOCK unless other -
wise noted.
TABLE OF CONTENTS
Specifications 1F3 -- 1............................
Fastener Tightening Specifications 1F3 -- 1..........
Maintenance and Repair 1F3 -- 2...................
On -- Vehicle Service 1F3 -- 2.........................
Fuel System 1F3 -- 2.............................
Fuel Injection Pump Coding 1F3 -- 3................
Fuel Tank 1F3 -- 4...............................
Vacuum Control System Test 1F3 -- 5..............
Vacuum Pump Test 1F3 -- 10......................
Vacuum Pump 1F3 -- 12..........................
Vacuum Unit Replacement 1F3 -- 14...............
Idle Speed Adjustment 1F3 -- 15...................Fuel Pump Test 1F3 -- 17.........................
Fuel Pump 1F3 -- 20.............................
Injection Nozzle Test 1F3-- 21.....................
Injection Nozzles 1F3-- 24........................
Injection Nozzle Repair 1F3 -- 26...................
Removal and Installation of
Injection Timing Device 1F3 -- 29.................
Injection Timing Device 1F3 -- 34...................
StartofDeliveryTest
(Position Sensor, RIV Method) 1F3 -- 36..........
Fuel Injection Pump 1F3 -- 45.....................
SPECIFICATIONS
FASTENER TIGHTENING SPECIFICATIONS
ApplicationN∙mLb-- FtLb-In
Fuel Tank Mounting Nut28 -- 4721 -- 35--
Fuel Pump Pressure Line1310--
Fuel Injection Nozzle35 -- 4026 -- 30--
Fuel Injection Pipe1813--
Nozzle Tensioning Nut8059--
Screw Plug3022--
Left -- Hand Thread Bolt4634--
Page 793 of 2053

1F3 -- 36 OM600 ENGINE CONTROLS
D AEW OO M Y_2000
START OF DELIVERY TEST (POSITION SENSOR, RIV METHOD)
1 Position Sensor
2 Battery
3 Fuel Injection Pump4 Seal Replace.............................
5 Screw Plug 30N∙m (22 lb-ft) ................
Service Data
Start of Delivery (RIV)AT DC 1 4_-- 1 6_
Page 794 of 2053

OM600 ENGINE CONTROLS 1F3 -- 37
D AEW OO M Y_2000
Tools Required
617 589 08 21 00 Position Sensor
Test Procedure
1. Remove the screw plug (5) and seal (4) and collect
oil in a suitable vessel.
2. Install the position sensor (1) into the governor
housing of the injection pump to be the guide pin of
the position sensor facing up.
3. Connect the battery terminal of position sensor (1)
to positive terminal (+) of battery.
Position Sensor 617 589 08 21 00
4. Rotate the crankshaft by hand (in direction of engine
rotation) until the lamp ’B’ lights up. Rotate the
crankshaft carefully further until both lamps ’A and
B’ come on. In this position, check the Rl value on
the crankshaft vibration damper.
SpecificationAT DC 1 4_-- 1 6_
Notice
If only lamp ’A’ lights up, repeat the test and if out of
specification, adjust start of delivery.
Page 795 of 2053

1F3 -- 38 OM600 ENGINE CONTROLS
D AEW OO M Y_2000
Digital Tester, RIV Method
(Connection Diagram for Testers Without Adapter)
1 Fuel Injection Pump
2 Rl Sensor
3 Digital Tester4 TDC Pulse Sender Unit
5 Battery
Page 796 of 2053

OM600 ENGINE CONTROLS 1F3 -- 39
D AEW OO M Y_2000
(Connection Diagram for Testers With Adapter)
1 Fuel Injection Pump
2 Rl Sensor
3 Digital Tester4 TDC Pulse Sender Unit
5 Battery
6 Rl Pulse Generator
Service Data
Start of Delivery (RIV)AT DC 1 4_-- 1 6_
Idle SpeedOM661LA : 720 -- 820 rpm, OM662LA : 750 -- 850 rpm
Page 797 of 2053

1F3 -- 40 OM600 ENGINE CONTROLS
D AEW OO M Y_2000
Tools Required
617 589 09 21 00 Rl Sensor
617589102100 TimingTester
667589002100 TDCPulseGenerator
Commercial Tools
ItemTools
Digigal TesterWith Pulse GeneratorBosch, MOT 001.03gg
Hartmann & Braun, EOMT3
Without Pulse GeneratorBosch, ETD 019.00
Sun, DIT 9000
ALV, Diesel -- Tester 875
Test Procedure
1. Remove the screw plug (7) and seal (8) collect oil in
a suitable vessel.
2. Install the Rl sensor into the governor housing of in-
jection pump (1).
Rl Sensor 617 589 10 21 00
3. Connect the digital tester and TDC pulse sender unit
according to connection diagram.
4. Run the engine at idle speed and check the Rl value
on the digital tester
Rl valueAT DC 1 4_-- 1 6_
Notice
If out of standard, adjust the start of delivery.
5. Stop the engine.
6. Remove the Rl sensor, digital tester and TDC pulse
sender unit.
7. Replace the seal and tighten the plug.
8. Check engine oil level and adjust if necessary.
Tightening Torque30 N∙m (22 lb-ft)