camshaft JAGUAR X308 1998 2.G Workshop Manual
[x] Cancel search | Manufacturer: JAGUAR, Model Year: 1998, Model line: X308, Model: JAGUAR X308 1998 2.GPages: 2490, PDF Size: 69.81 MB
Page 747 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel return pipe. Locate
the fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the A-Bank injectors.
4. Fit the A-Bank intercooler. Refer to Operation 18.50.18.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 748 of 2490

12. Reconnect the air cleaner cover.
Fit the five clips which secu re the air cleaner cover.
13. Connect the intake tube to the throttle body.
1. Connect the intake tube to the throttle body.
2. Fit the two bolts which secure the intake tube to the throttle body.
14. Reconnect the air flow meter multi-plug.
15. Fit a new strap to secure the vacuum pipe to the induction
elbow.
16. Connect the breather pipe to the A-Bank camshaft cover.
1. Fit a new O-ring seal to the breather pipe.
2. Reconnect the breather pipe to the stub pipe.
17. Refill the cooling system. Refer to Operation (SC) (26.10.01).
18. Connect the battery and fit the battery cover.
Page 759 of 2490

Engine - Primary Timing Chain LH4.0L NA V8 - AJ27
In-vehicle Repair
Removal
Special Tool(s)
Camshaft setting
303 - 530
Timing chain tensioning
303 - 532
Wedges, primary chain
303 - 533
Crankshaft setting
303 - 531
1. Open the engine compartment and fit paintwork protection
sheets.
2. Set the engine compartment cover to the service access
position.
3. Disconnect the batt ery ground cable.
Remove the battery cover.
4. Remove the Timing Co ver. Refer to Operation 12.65.01 in this
Section.
5. Remove the VVT bush carrier from the A-Bank.
1. Remove the three bolts which secure the carrier to the cylinder block.
Page 761 of 2490

2. Remove the access grommet (for torque converter bolts) from the housing.
11. Fit the damper securing bolt (old one) to the crankshaft,
hand-tight only.
12. Rotate the crankshaft until the triangular arrow indent on
the drive plate is visible thro ugh the access hole; confirm
that the timing flat on ea ch camshaft is uppermost.
13. Fit the crankshaft setting peg 303 - 531 to the crankshaft
position sensor location.
1. Fit the crankshaft setting peg 303 - 531.
1. Position the crankshaft so that the setting peg engages fully into the timing slot.
2. Fit and tighten the bolt to secure the setting peg.
14. Remove the damper securing bolt from the crankshaft.
15. Lower the vehicle on the ramp.
16. Fit the camshaft locking tool 303 - 530 to the A-Bank
camshafts, aligning the shafts slightly as necessary.
17. Loosen the bolt which secures the sprocket to the camshaft.
Page 762 of 2490

18. Loosen the bolt which secures the VVT unit to the camshaft.
19. Remove the primary ch ain tensioner bolts.
20. Remove the tensioner assembly.
1. Remove the tensioner.
2. Remove the tensioner back-plate.
21. Remove the chain tensioner blade.
1. Remove the pivot bolt which secures the tensioner blade.
2. Remove the tensioner blade.
Page 763 of 2490

22. Remove the chain from the VVT unit and from the crankshaft
pulley.
23. Remove the camshaft locking tool 303 - 530 and transfer it to the B-Bank camshafts, aligning the shafts slightly as necessary.
24. Loosen the bolt which secures the sprocket to the camshaft.
25. Loosen the bolt which secures the VVT unit to the camshaft.
26. Remove the primary ch ain tensioner bolts.
Page 764 of 2490

Installation
27. Remove the tensioner assembly.
1. Remove the tensioner.
2. Remove the tensioner back-plate.
28. Remove the chain tensioner blade.
1. Remove the pivot bolt which secures the tensioner blade.
2. Remove the tensioner blade.
29. Reposition the VVT unit and exhaust camshaft sprocket
forward along the camshaft bosses and remove the chain from
the VVT unit and from th e crankshaft sprocket.
30. Note the orientation of the spro ckets relative to each other
(half a tooth out of line).
31. Clean and inspect all relevant components.
1. Fit the chain tensioning tool 303 - 532 to the exhaust camshaft
Page 765 of 2490

sprocket, B-Bank.
Reposition the sprocket (and the VVT unit) for the most
advantageous position for use of the tool.
Remove the tool.
2. Refit the primary timing chain, B-Bank.
1. Fit the primary chain over the crankshaft sprocket and the VVT unit sprocket. There must be no slack on
the drive side of the primary chain and the VVT unit
must not be rotate d on the camshaft.
Slide the VVT and exhaust sprocket fully rearwards onto
the respective camshafts.
3. Fit the primary chain tensioner blade.
1. Position the tensioner blade to the cylinder block.
2. Fit the retaining / pivot bolt and tighten it to 12 - 16 Nm.
4. Refit the primary chain tensione r assembly. Refer to Operation
12.65.55 in this Section.
Use a wedge 303 - 533 (or two if required) between the
primary chain tensioner and te nsioner blade, to take up
the slack in the chain.
5. Tighten the exhaust camshaft sprocket securing bolt.
1. Fit the chain tensioner tool 303 - 532 to the sprocket holes.
1. Apply force to the tool in an anti-clockwise direction
to tension the chain on its drive side.
2. Whilst applying the opposing force to the sprocket
Page 766 of 2490

and chain, tighten the sprocket securing bolt to 115 -
125 Nm.
6. Tighten the VVT unit securing bolt.
1. Whilst still applying the opposing force to the
sprocket and chain (using 303 - 532), check that the
wedges are still in place, tighten the VVT unit
securing bolt to 115 - 125 Nm.
Remove the chain tensioning tool and the wedge(s).
7. Remove the camshaft locking tool 303 - 530 and transfer it to
the A-Bank camshafts, aligning the shafts slightly as necessary.
8. Fit the chain tensioning tool 303 - 532 to the exhaust camshaft
sprocket, A-Bank.
Reposition the sprocket (and the VVT unit) for the most
advantageous position for use of the tool.
Remove the tool.
9. Refit the primary timing chain, A-Bank.
1. Fit the primary chain over the crankshaft sprocket and the VVT unit sprocket. There must be no slack on
the drive side of the primary chain and the VVT unit
must not be rotate d on the camshaft.
Page 767 of 2490

10. Fit the primary chain tensioner blade.
1. Position the tensioner blade to the cylinder block.
2. Fit the retaining / pivot bolt and tighten it to 12 - 16 Nm.
11. Refit the primary chain tens ioner assembly. Refer to
Operation 12.65.54 in this Section.
Use a wedge 303 - 533 (or two if required) between the
primary chain tensioner and te nsioner blade, to take up
the slack in the chain.
12. Tighten the exhaust camshaft sprocket securing bolt.
1. Fit the chain tensioner tool 303 - 532 to the sprocket holes.
1. Apply force to the tool in an anti-clockwise direction
to tension the chain on its drive side.
2. Whilst applying the opposing force to the sprocket and chain, tighten the sprock et securing bolt to 115 -
125 Nm.
13. Tighten the VVT unit securing bolt.
1. Whilst still applying the opposing force to the
sprocket and chain (using 303 - 532), check that the
wedges are still in place, tighten the VVT unit
securing bolt to 115 - 125 Nm.
Remove the chain tensioning tool and the wedge(s).