engine MITSUBISHI 3000GT 1991 Workshop Manual

MITSUBISHI 3000GT 1991 Workshop Manual 3000GT 1991 MITSUBISHI MITSUBISHI https://www.carmanualsonline.info/img/19/57085/w960_57085-0.png MITSUBISHI 3000GT 1991 Workshop Manual

Page 66 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual 11-16ENGINE - Service Adjustment Procedures
MANIFOLD VACUUM INSPECTION
MllFNAR
(1) The vehicle should be repaired as follows before the
inspection.
lEngine coolant temperature: 80 - 95°C (176 - 205°

Page 67 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual ENGINE - Engine AssemblyII-17
ENGINE ASSEMBLY
/REMOVAL AND INSTALLATION
I
Pre-removal Operationl Release of Residual Pressure from HighPressure Fuel Hose(Refer to GROUP 13 -Service AdjustmentProcedure

Page 68 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual II-18ENGINE - Engine Assembly
19. ISC servo connector
20. TPS connector
21. Oil pressure switch and oil
pressure gauge unit connector22. Fuel injector harness connector
23. Knock sensor connector
24.

Page 69 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual ENGINE - Enaine AssemblvII-19
Engine mount bracketSERVICE POINTS OF REMOVALMllSBEH
15. DISCONNECTION OF Ail? CONDITIONER COMPRES-SOR 
/ 16. POWER STEERING OIL PUMP
Disconnect air conditioner compresso

Page 70 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual II-20ENGINE - Camshaft Oil Seals
CAMSHAFT OIL SEALS
RElVjOVAL AND INSTALLATION
MllZA-B
Pre-removal and Post-installation Operationl Removal and Installation of Timing Belt(Refer to P.l l-26.)l Removal

Page 71 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual ENGINE - Camshaft Oil SealsII-21
r
CamshaftOlM0032
Rear bank6
OlL105C(1) Only 
No. 5 bolt in the rear-bank differs from other bolts
in length.
Rear bank No. 5 bolt. . . . . . . . . . . . . . . . . . .

Page 72 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual II-22ENGINE - Oil Pan and Oil Screen
OIL PAN AND OIL SCREENREMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Draining and Refilling
l Engine Oil(Refer to GROUP 00 -Maintenance Servi

Page 73 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual ENGINE - Winder Head Gasket11-23
CYLINDER HEAD GASKETREMOVAL AND INSTALLATION
MllJA-6
Pre-removal and Post-installation Operation
Draining and Supplying
l Engine Coolant(Refer to GROUP 00 -Maintenance

Page 74 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual 11-24ENGINE - Cylinder Head Gasket
ldentlfrcatlonmark
01 N009iOlL0472
0111044
JI
j:: 1: :: ::p:i
c1
Q80401Q5 c
Frontbank074930296
- OlL105j8
TSB Revision
5SERVICE POINTS OF REMOVALMllJBBF
6. REMOVAL O

Page 75 of 1146

MITSUBISHI 3000GT 1991 Workshop Manual ENGINE - Cylinder Head Gasket11-25
Rear bank
6 011 010 09
Front bank
6
OlL105C6. INSTALLATION OF INTAKE CAMSHAFT SPROCKET
Using a wrench, hold the camshaft at its hexagon and
tighten the bolt to speci