engine MITSUBISHI 3000GT 1991 Workshop Manual
[x] Cancel search | Manufacturer: MITSUBISHI, Model Year: 1991, Model line: 3000GT, Model: MITSUBISHI 3000GT 1991Pages: 1146, PDF Size: 76.68 MB
Page 66 of 1146

11-16ENGINE - Service Adjustment Procedures
MANIFOLD VACUUM INSPECTION
MllFNAR
(1) The vehicle should be repaired as follows before the
inspection.
lEngine coolant temperature: 80 - 95°C (176 - 205°F)‘dl Lights, electric cooling fan, and accessories: OFF
l Transaxle: Neutral
(P for A/T)l Steering wheel: neutral position
(2) Connect a tachometer. (Refer to P.l l-l 3.)
(3) Disconnect the vacuum hose from the nipple for taking off
fuel pressure regulator vacuum from the air intake plenum.
(4) Conncet a three-way joint between the removed vacuum
hose and the nipple and connect a vacuum gauge to the
joint.
(5) Start the engine and check that idle speed is within the
standard value range.
(6) Check the manifold vacuum.
Standard value:
*
Approx. 495 mmHg (19 in.Hg)LASH ADJUSTERS CHECK
Ml 1 FEAFIf an abnormal noise is heard from the lash adjusters, check as
follows.
(1) After warming up the engine, stop it.
(2) While installed to the cylinder head, press the part where
the rocker arm contacts the lash adjuster at the very top. If
the adjuster is normal, the part pressed will feel very hard.
d
(3) If it easily moves all the way downward when pressed,
there is a malfunction of the lash adjuster and it should be
replaced with a new one.
(4) If it feels spongy or elastic, probably oil with air mixed in it
has entered the lash adjuster. Check whether the amount
of oil is too much or is not enough and the cause of air
becoming mixed into the oil is a damaged oil screen or oil
screen gasket.
(5) After repairing the cause of the air leak, warm up the engine
and then drive the vehicle at low speed for a while. Stop the
engine and leave it off for a few minutes; then restart the
engine and drive at low speed. Repeat this procedure
several times during the course of about one hour so as to
remove the air from the oil.
TSB Revision
Page 67 of 1146

ENGINE - Engine AssemblyII-17
ENGINE ASSEMBLY
/REMOVAL AND INSTALLATION
I
Pre-removal Operationl Release of Residual Pressure from HighPressure Fuel Hose(Refer to GROUP 13 -Service AdjustmentProcedures,)l Removal of Cruise Control Pump andLink Assembly(Refer to GROUP 13 - Cruise Control.)l Removal of Hood(RefertoGROUP42A-Hood.)
l
Removal of Air Hose and Air Pipe
Post-installation Operationl Installation of Radiator(Refer to GROUP 14 - Radiator.)l Installation of Cruise Control Pump andLink Assembly(Refer to GROUP 13 -Cruise Control.)l Installation of Transaxle Assembly(Refer to GROUP 22,23 -Transaxle Assembly.)l lnstallatron of Front Exhaust Pipe(Refer to GROUP 15 - Exhaust Pipe and Main Muffler.)l Installation of Air Hose and Air Pipe
MllSA-B
4 ft.lbs.
6
40-45 Nm
29 - 33 fklbs.
Removal steps
1. Connection of accelerator cable11. Drive belt (Alternator and air conditioner)
2. Connection of brake booster vacuum hose(Refer to P.l l-l 1.)
3. Connection of booster vacuum12. Drive belt (Power steering)
hose
(Referto P.l l-l I.)4. Connection of fuel return hose13. Connection of alternator harness
5. Connection of fuel high pressure hose14. Oxygen sensor connector
6. Connection of ground cablel *15. Air conditioner compressor
7. Solenoid valve assembly4w
16. Power steering oil pump
8. Connection of vapor hose17. Oil pressure switch connector (Power steer-9. Connection of heater hoseing)10. EGR temperature sensor connector18. Connection of oil cooler pipes
OlFOO43
TSB Revision1
Page 68 of 1146

II-18ENGINE - Engine Assembly
19. ISC servo connector
20. TPS connector
21. Oil pressure switch and oil
pressure gauge unit connector22. Fuel injector harness connector
23. Knock sensor connector
24. Crankshaft angle sensor connector
25. Engine coolant temperature
switch connector (Air conditioner)
26. Engine coolant temperature
sensor connector
27. Engine coolant temperature
gauge unit connector
28. Condenser connector
29. Ignition coil connector
30. Power transistor connector
31. Fuel injector connector
32. Variable induction motor connector
33. Oxygen sensor connector
2930lOO-
120 Nm72 - 87 ft.lbs.
70 Nm
,51 ftlbs
** l * 34. Engine mounting bracket
35. Rear roll stopper bracket and engine
connection bolt36. Front roll stopper bracket and engineconnection bolt** l a 37. Engine assembly35 Nm
25 ft.lbs.
?I,---R
50-60 Nm36 - 43 ftlbs.
OlFOO19
TSB Revision
Page 69 of 1146

ENGINE - Enaine AssemblvII-19
Engine mount bracketSERVICE POINTS OF REMOVALMllSBEH
15. DISCONNECTION OF Ail? CONDITIONER COMPRES-SOR
/ 16. POWER STEERING OIL PUMP
Disconnect air conditioner compressor and power steering
oil pump (with the hose).
NOTEThe removed air conditioner compressor and power steer-
ing oil pump should be fastened (by using rope, etc.) in
.aposition that will not interfere with the removal/installation
of the engine assembly.
34. REMOVAL OF ENGINE MOUNT BRACKETBefore removing the engine mount bracket installation bolt,
use a chain block or similar arrangement to suspend the
engine assembly (to the extent that there is no looseness of
the chain).
37. REMOVAL OF ENGINE ASSEMBLYAfter checking that the cables, hoses, harness connectors,
etc. are all removed, slowly raise the chain block to lift the
engine assembly upward out of the engine compartment.
SERVICE POINTS OF INSTALLATIONMl
1SDBC
37. INSTALLATION OF ENGINE ASSEMBLYWhen mounting the engine, check to be sure that the
cables, hoses, harness connectors, etc. are all in the correct
position.
34. INSTALLATION OF ENGINE MOUNT BRACKETAttach the engine mounting bracket so that the arrow mark
on the mounting stopper is in the direction as shown in the
illustration.
TSB Revision
Page 70 of 1146

II-20ENGINE - Camshaft Oil Seals
CAMSHAFT OIL SEALS
RElVjOVAL AND INSTALLATION
MllZA-B
Pre-removal and Post-installation Operationl Removal and Installation of Timing Belt(Refer to P.l l-26.)l Removal and Installation of Intake Manifold(Refer to GROUP 15 - Intake Manifold.)3Nm
2.2 ftlbs.
3Nm
2.2 f’tlbs.
$1(Refer to GROUP 13 - Engine Control.)3Nm
90 Nm65 ft.lbs.
Removal steps
1. Center cover (front bank)
2. Connection for spark plug cables
3. Connection for breather hose
4. Connection for PCV hose
l *5. Rocker cover** l *6. Camshaft sprocketa* I)* 7. Camshaft oil seals
io01 NO040
01 NO042
1.4 in.) 4(.4 in.)
OlA0047
Sealant: 3M ATD PartNo. 8660 or equivalent
1 TSB Revision
Page 71 of 1146

ENGINE - Camshaft Oil SealsII-21
r
CamshaftOlM0032
Rear bank6
OlL105C(1) Only
No. 5 bolt in the rear-bank differs from other bolts
in length.
Rear bank No. 5 bolt. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20 mm (.79 in.)
Except rear bank No. 5 bolt
_................... 10 mm (.39 in.)
(2) Bolts are color-coded for the front and rear banks as
follows:
Front bank. . . . . . . . . . . . . . . . . .._....___.._______....__.._..._..... I.........Black
Rearbank. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Green(3) When the rocker cover gasket has been replaced,
tighten bolts in this order and then, retighten bolts 1 to 6
to 4 Nm (2.9 ft.lbs.).
1 TSB RevisionSERVICE POINTS OF REMOVALMllZBAG
6. REMOVAL OF CAMSHAFT SPROCKET
Using a wrench at the hexagonal part of the camshaft (to
prevent the crankshaft from turning), loosen the camshaft
sprocket bolt.
CautionDo not hold the camshaft sprocket with a tool, or a
damaged sprocket could result.7. REMOVAL OF CAMSHAFT OIL SEAL
(1) Cut out a portion in the camshaft oil seal lip.
\
(2)Cover the tip of a screwdriver with a cloth and apply it to
the cutout in the oil seal to pry off the oil seal.
Caution
Use care not to damage the camshaft and cylinder
head.SERVICE POINTS OF INSTALLATION
MllZDAI7. INSTALLATION OF CAMSHAFT OIL SEAL
(1) Apply a small amount of engine oil to the oil seal lip.
(2) Using the special tool, insert the oil seal.
6. INSTALLATION OF CAMSHAFT SPROCKET
Using a wrench at the hexagonal part of the camshaft (to
prevent the crankshaft from turning), tighten the camshaft
sprocket bolt.
CautionDo not hold the camshaft sprocket with a tool, or a
damaged sprocket could result.5. INSTALLATION OF ROCKER COVER
Tighten the rocker cover bolts in the order shown in the
illustration.
NOTE’
Page 72 of 1146

II-22ENGINE - Oil Pan and Oil Screen
OIL PAN AND OIL SCREENREMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Draining and Refilling
l Engine Oil(Refer to GROUP 00 -Maintenance Service.)Removal and Installationl Front Air Dam
,
(Refer to GROUP 22, 23 -Transfer Assembly.)
13 NmPI, ll.r
wOlLO156
Sealant: MITSUBISHI GENUINE Part
No. MD9971 10 or equivalent
9Nm- . .. .
60-70Nm -43 - 51 ft.lbs.
MllHA--
,9Nm7 ft.lbs.
26 ft.lbs.6Nm4ft.lbs.7
lt.lbS.
Removal steps
1. Left member7 Ctclrtny
3. Transaxle stay (front)4. Transaxle stay (rear)
Nm_ .43 - 51 ftms.
TSB Revision
7. Oil pan8. Oil screen^.L^^“1 wu06
1
Page 73 of 1146

ENGINE - Winder Head Gasket11-23
CYLINDER HEAD GASKETREMOVAL AND INSTALLATION
MllJA-6
Pre-removal and Post-installation Operation
Draining and Supplying
l Engine Coolant(Refer to GROUP 00 -Maintenance Service.)Removal-and Installationl Air Intake Manifold(Refer to GROUP 15 -Air intake Manifold.)l Turbocharger
10 Nm3Nm
2.2 klbs.P
~~(Refer to GROUP 13 - Engrne Control.)
10 Nm7 ft.lbs.
7 ft.lbs.\
120-nng
‘3, ;
%
;;
Water01 LO21
7
i2o-IjONmY rt.lDS.
87
- 94 ft.lbs.
76 - 83 ft.lbs.d
I. Pipe assembly
2. Blow-by hose
90
Nm3. Center cover (Front bank)
4. Spark plug cable
HI 5. Rocker cover4* l a
I
6. Intake camshaft sprocket7. Timing belt rear cover (Cent
7.----A//OlFOO218. Ignition coil9. Connection of heater hose10. Connection of water hoses
Rocker coverIOmm
410mm(.4 in.)1.4 in.)
OlA004;
Sealant: 3M ATD Part
No. 8660 or equivalent
.er)
tl-urbo>11. Connection of radiator hose
12. Thermostat housing
13. Connection of water inlet pipe** l + 14. Cylinder head assembly** 15. Cylinder head gasket
(Front bank)TSB Revision
Page 74 of 1146

11-24ENGINE - Cylinder Head Gasket
ldentlfrcatlonmark
01 N009iOlL0472
0111044
JI
j:: 1: :: ::p:i
c1
Q80401Q5 c
Frontbank074930296
- OlL105j8
TSB Revision
5SERVICE POINTS OF REMOVALMllJBBF
6. REMOVAL OF INTAKE CAMSHAFT SPROCKET
(1) Using a wrench, hold the camshaft at its hexagon and
remove the camshaft sprocket bolt.
Caution
Locking the camshaft sprocket with a tool damages
the sprocket.(2) Remove the camshaft sprockets.
14. REMOVAL CYLINDER HEAD ASSEMBLYUsing the special tool, remove the cylinder head assembly.
SERVICE POINTS OF INSTALLATION
MllJDEJ
15. INSTALLATION OF CYLINDER HEAD GASKET
(1) Make sure that the gasket has the proper identification
mark for the engine.
(2) Lay the cylinder head gasket on the cylinder block with
the identification mark at the front top.
14. INSTALLATION OF CYLINDER HEAD ASSEMBLY
(1)Use a scraper to clean the gasket surface of the cylinder
head assembly.
CautionTake care that no foreign material gets into the
cylinder, coolant passages or oil passages.
(2) Using the special tool and a torque wrench, tighten the
bolts to the specified torque in the order shown in the
illustration. (in two or three cycles)
CautionInstall the head bolt washers with shear droop
upward as shown in the illustration.
(3) Back off the bolts once and tighten them to the
specified torque as shown in step (2).
Page 75 of 1146

ENGINE - Cylinder Head Gasket11-25
Rear bank
6 011 010 09
Front bank
6
OlL105C6. INSTALLATION OF INTAKE CAMSHAFT SPROCKET
Using a wrench, hold the camshaft at its hexagon and
tighten the bolt to specification.
Caution
Locking the camshaft sprocket with a tool damages the
sprocket.5. INSTALLATION OF ROCKER COVER
Tighten the rocker cover bolts in the order shown in the
illustration.
NOTE(1) Only No. 5 bolt in the rear bank differs from other bolts
in length.
Rear bank No. 5 bolt._.._.._........._._____.__.._.. 20 mm (.79 in.)
Except rear bank No. 5 bolt
.._._............... 10 mm (.39 in.)
(2) Bolts are color-coded for the front and rear banks as
follows:
Front bank
__.._................_.......................................... Black
Rear bank . . . . . . . . . . ..___..................................._._._.............Green(3) When the rocker cover gasket has been replaced,
tighten bolts in this order, and then retighten bolts 1 to 6
to 4 Nm (2.9 ft.lbs.).
TSB Revision