engine NISSAN ALMERA N15 1995 Service Manual
[x] Cancel search | Manufacturer: NISSAN, Model Year: 1995, Model line: ALMERA N15, Model: NISSAN ALMERA N15 1995Pages: 1701, PDF Size: 82.27 MB
Page 1067 of 1701

TROUBLEDIAGNOSIS FORNON-DETECTABLE ITEMS
Cooling FanControl (Cont'd)
AlT models
INSPECTION START
Checkcooling fanlow
speed control circuit.
(Go to
I
PROCEDURE A
I,
EC-350.)
NG
2. Turn ignition switch"ON".
3. Perform "COOLING FAN
CIRCUIT" in"FUNCTION
TEST" modewithCONSULT.
OR
2. Turn ignition switch"ON".
3. Perform "COOLING FAN"in
"ACTIVE TEST"modewith
CONSULT. OR
CHECK
COOLING FANLOW SPEED
OPERATION. 1. Disconnect coolingfan
re/ays-2
and
-3.
00
COOLING FAN
ROTATE ANDSTOP
EVERY 3SECONDS
I
•
COOLING FANCIRCUIT.
DOES
OK
NEXT
II
NO
II
YES
JF311F
(j)
I
With airconditioner
I
2. Start engine.
3. Set temperature leveratfull cold
position.
4. Turn airconditioner switch"ON".
5. Turn blower fanswitch "ON".
6. Run engine atidle forafew minutes
with airconditioner operating.
7. Make surethatcooling fanoperates
at low speed.
I
Without airconditioner
1
2. Start engine.
3. Keep engine speedatabout 2,000
rpm until engine iswarmed upsuffi-
ciently.
4. Make surethatcooling fanbegins to
operate atlow speed during warm-
up.
COOLAN
TEMPjS 88°C
•
ACTIVE TEST.
0
COOLING FAN
OFF
= ==
MONITOR
===
With airconditioner
lCOOtingfan
@l
~ID~
==H=I
=11L~W I
EC-348
Page 1068 of 1701

TROUBLEDIAGNOSIS FORNON-DETECTABLE ITEMS
Cooling FanControl (Cont'd)
• COOLING FANCIRCUIT.
DOES
Cooling fan
MEC475B
COOLING
FAN
•
Check
cooling fanhigh
speed control circuit.
(Go to
I
PROCEDURE B
I.
EC-351.)
NG
OK
CHECK
COOLING FANHIGH SPEED
OPERATION.
1. Turn ignition switch"OFF".
2. Reconnect coolingfanrelays-2 and
-3.
3. Disconnect coolingfanrelay-1.
(ij\
4.Turn ignition switch"ON".
~ 5.Perform "COOLING FAN
CIRCUIT" in"FUNCTION
TEST" modewithCONSULT.
OR
fiii\
4.Turn ignition switch"ON".
~ 5.Perform "COOLING FAN"in
"ACTIVE TEST"modewith
CONSULT.
OR
4. Turn airconditioner switch
and blower fanswitch "OFF"
(Models withairconditioner).
5. Disconnect enginecoolant
temperature sensorharness
connector.
6. Connect 150Qresistor to
engine coolant temperature
sensor harness connector.
7. Restart engineandmake sure
that cooling fanoperates at
higher speedthanlowspeed.
Ii
--- ---
150(1 resistor
ROTATE
ANDSTOP
EVERY 3SECONDS
"I
NEXT
II
NO
II
YES
I
MEF311F
COOLAN TEMP/S
•
ACTIVE TEST. D
COOLING FAN
OFF
= ==
MONITOR
clTJI
LOW
1.1-
MEF314F
Ii
Ii
INSPECTIONEND
EC-349
Page 1074 of 1701

MEC730B
•
INSPECTION
START
DIAGNOSTIC
PROCEDURE
CHECK OVERALL FUNCTION.
~
INSPECTION
END
I
1. Start engine andwarm itup suffi-
ciently.
00
2.
Perform "PW/STSIGNAL
CIRCUIT" in"FUNCTION
TEST" modewithCONSULT.
OR
@
2.
Check "PW/ST SIGNAL" in
"DATA MONITOR" modewith
CONSULT.
Steering isin neutral
position: OFF
Steering isturned:
ON
OR
@
2.
Check voltage between ECM
terminal
@
and ground.
Voltage:
When steering wheelis
turned quickly.
Approximately OV
Except above
Approximately 8-10V
~NG
+
-
SEF5911
MEF023E
TROUBLE
DIAGNOSIS FORNON-DETECTABLE ITEMS[][]
Power Steering OilPressure Switch(Cont'd)
COMPONENT DESCRIPTION
The power steering oilpressure switchisattached tothe power
steering high-pressure tubeanddetects apower steering load.
When apower steering loadisdetected, itsignals theECM. The
ECM adjusts theIACV-AAC valvetoincrease theidle speed and
adjust forthe increased load.
RECORD
NEXT
II
START
•
PW/ST SIGNAL CIRCUIT.
HOLD STEERING WHEEL
IN AFULL
LOCKED
POSITION
THEN
TOUCH START
-crMONITOR -crNOFAIL
0
PW/ST SIGNAL OFF
Hoodledge
RH~
m
1='
=EC=M
=.,~
CONNECTORII ~
is
43
00
[Y]
.".MEF315F
EC-355
Page 1075 of 1701

TROUBLEDIAGNOSIS FORNON-DETECTABLE ITEMS
mJ
Power Steering OilPressure Switch
(Cont'd)
~i5
dIb
~i5
II
ECM
~CONNECTORII
43 AEC760
SEF501Q
@
1
CHECK GROUND CIRCUIT. NG
Repair harness orcon-
1. Turn ignition switch"OFF".
--..
nectors.
2. Disconnect powersteering oilpres-
sure switch harness connector.
3. Check harness continuity between
terminal
@
and engine ground.
Continuity shouldexist.
If OK, check harness forshort.
OK
[!J
CHECK INPUTSIGNAL CIRCUIT. NG
Check thefollowing.
1. Disconnect ECMharness connector.
--..
•Harness connectors
2. Check harness continuity between
CID,@
ECM terminal
@
and terminal
CD.
•
Harness connectors
Continuity shouldexist.
@,@D
If OK, check harness forshort. •
Harness foropen or
OK short
between ECMand
power steering oilpres-
sure switch
If NG, repair harness or
connectors.
Power steering oilpressure switch
1. Disconnect powersteering oilpressure switchharness con-
nector thenstart engine.
2. Check continuity betweenterminals
CD
and
@.
~
to
ID
~
CHECK
COMPONENT
(Power steering oilpressure switch).
Refer to"COMPONENT INSPECTION"
below.
OK
Disconnect andreconnect harnesscon-
nectors inthe circuit. Thenretest.
Trouble isnot fixed.
Check ECMpinterminals fordamage
and check theconnection ofECM har-
ness connector. ReconnectECMhar-
ness connector andretest.
INSPECTION END
COMPONENT INSPECTION
Conditions
Steering wheelisbeing turned
Steering wheelisnot being turned NG
Replace powersteering
oil pressure switch.
Continuity
Yes
No
AEC762
IfNG, replace powersteering oilpressure switch.
EC-356
Page 1082 of 1701

TROUBLEDIAGNOSIS FORNON-DETECTABLE ITEMS
Heated Oxygen Sensor(H02S)(Cont'd)
SYSTEM DESCRIPTION
Heated oxygen sensorheatercontrol
ECMHeated
I
Crankshaft positionsensor
I
Engine speed (ECCS
~
oxygen
~
control sensor
module) heater
OPERATION •
--~-
The
ECM performs ON/OFFcontrolofthe heated
oxygen sensorheatercorresponding tothe
engine speed.
Enginespeedrpm
Above 3,200
Below 3,200
Heated
oxygen sensor
heater
OFF
ON
i
Heaterpad
Isolation
bearing Zirconia
i
tube
SEF406H COMPONENT
DESCRIPTION
The heated oxygen sensorisplaced intothefront tube. It
detects theamount ofoxygen inthe exhaust gascompared to
the outside air.The heated oxygen sensorhasaclosed-end
tube made ofceramic zirconia. Thezirconia generates voltage
from approximately 1Vinricher conditions to
av
inleaner con-
ditions. Theheated oxygen sensorsignalissent tothe ECM.
The ECM adjusts theinjection pulseduration toachieve the
ideal air-fuel ratio.Theideal air-fuel ratiooccurs neartherad-
ical change from1Vto
av.
2
1
::>
OJ
~
(5
>
"5
c.
"5
0
:'--
0
-
Rich ---
Ideal
ratio _
Lean
Mixture ratio
SEF288D
EC-363
Page 1083 of 1701

TROUBLEDIAGNOSIS FORNON-DETECTABLE ITEMS
Heated Oxygen Sensor(H02S)(Cont'd)
DIAGNOSTIC PROCEDURE
• MIXTURE RATIOTEST.
ACCELERATE TO2000
RPM AND HOLD THEN
TOUCH START.
INSPECTION
START
*
NO FAIL
0
II=]
1800 20002200
ij
NEXT
II
START
J
RECORD \ I/
'~/'
- CHECK-
/
......
/ I\
INSPECTION
END
OK
NG
CHECK
HEATED OXYGEN SENSOR
CIRCUIT.
1. Start engine andwarm itup suffi-
ciently.
rF.i\
2.Perform "MIXTURE RATIO
\J!J
TEST"in"FUNCTION TEST"
mode withCONSULT.
OR
rF.i\
2.Make surethat"M/R FIC
\J!J
MNT"in"DATA MONITOR"
mode indicates "RICH"and
"LEAN" periodically more
than 5times during 10 sec-
onds at2,000 rpm.
OR
~ 2.Stop engine andsetECM
~ Diagnostic TestMode II
(Heated oxygensensormoni-
tor).
3. Restart engineandrunitat
about 2,000rpmforabout 2
minutes underno-load.
4. Keep engine speedat2,000
rpm andmake surethatthe
malfunction indicatorlampon
the instrument panelgoeson
and offmore than5times dur-
ing 10seconds.
SEF815L
I
MEC782B
2000rpm
RICH
CMPSoRPM
(REF)
M/R FICMNT
*.
MONITOR
Repairharness orcon-
nectors.
NG
OK
@
SEF089PA
Malfunction
indicator
lamp
~
Heated oxygen '~~
sensor harness connector \
ij
~I 1-''--\
CHECK
INPUTSIGNAL CIRCUIT.
SEF051PA
1.Turn ignition switch"OFF".
'-------------------' 2.Disconnect heatedoxygen sensor
harness connector andECM harness
connector.
3. Check harness continuity between
ECM terminal
@
and terminal
@.
Continuity shouldexist.
4. Check harness continuity between
ECM terminal
@
(orterminal
@)
and ground.
Continuity shouldnotexist.
if OK, check harness forshort.
II
~i5
ECM
-er
CONNECTOR
II
19
~i5
~
MEC735B EC-364
Page 1084 of 1701

TROUBLEDIAGNOSIS FORNON-DETECTABLE ITEMS
Heated Oxygen Sensor(H02S) (Cont'd)
•
Repair harness orcon-
nectors. Go
to"CHECK
COMPONENT".
Check thefollowing.
• Harness connectors
aD,@
• 10A
fuse
• Harness foropen or
short between heated
oxygen sensorand
fuse
If NG, repair harness or
connectors.
OK
NG
NG
OK
CHECK
HEATED OXYGEN SENSOR
HEATER CIRCUIT.
1. Reconnect harnessconnectors.
2. Start engine.
3. Check voltage between ECMterminal
Gill
andground withCONSULT or
tester underthefollowing conditions.
Voltage: Engine speedisbelow 3,200rpm
Approximately OV
Engine speedisabove 3,200rpm
Battery voltage
CHECK POWER SUPPLY.
1. Stop engine.
2. Disconnect heatedoxygen sensor
harness connector.
3. Turn ignition switch"ON".
4. Check voltage between terminal
@
and ground.
Voltage: Batteryvoltage@
CHECK OUTPUT SIGNALCIRCUIT.
1. Turn ignition switch"OFF".
2. Disconnect ECMharness connector.
3. Check harness continuity between
terminal
G)
and ECM terminal
Gill.
Continuity shouldexist.
If
OK, check harness forshort.
SEF646P
MEC784B
~i5
cillID
MEC783B
~i5
ECM
J9"
CONNECTOR
II
111
@J
~i)~ID
II
ECM
J9"
CONNECTOR
II
111
OK
Loosen andretighten engineground
screws.
CHECK COMPONENT
(Heated oxygensensorheater).
Refer to"COMPONENT INSPECTION"
on next page.
OK
Disconnect andreconnect harnesscon-
nectors inthe circuit. Thenretest.
NG
Replace heatedoxygen
sensor.
Trouble isnot fixed
Check ECMpinterminals fordamage
and check theconnection ofECM har-
ness connector. ReconnectECMhar-
ness connector andretest.
INSPECTION END
EC-365
Page 1087 of 1701

TROUBLEDIAGNOSIS FORNON-DETECTABLE ITEMS~
Torque Converter ClutchSolenoid Valve(Cont'd)
SYSTEM DESCRIPTION
Throttle position sensor Throttle
valveopening angle
Engine coolant temperature sensorEnginecoolant temperature ECM
(ECCS
control
module) Torque
converter
clutch solenoid
valve
Vehicle speedsensor Vehicle
speed
The
AfT
lock-up iscontrolled bythe ECM through
the torque converter clutchsolenoid valve.When
the ECM detects anyofthe following conditions,
the ECM switches thetorque converter clutch
solenoid valveOFFtoaccomplish lock-upopera-
tion. While thevehicle isinconditions otherthan
below, thetorque converter clutchsolenoid valve
is always settoON, relea'sing thelock-up oper-
ation. •
Throttle position isopen .
• Engine coolant temperature is70°C (158°F) or
more .
• Vehicle speedis58 kmfh (36MPH) ormore.
~i3~
II
ECM
E[CONNECTORII
DIAGNOSTIC
PROCEDURE
INSPECTION START
115
OK
INSPECTION END
CHECK
COMPONENT
(Torque converter clutch
solenoid valve).
Refer to"Electrical Com-
ponents Inspection" in
AT section.
If
NG, replace torque
converter clutchsolenoid
valve.
Check thefollowing.
• Harness connectors
@,
• 10A fuse
• Harness foropen or
short between torque
converter clutchsole-
noid valve andfuse
If NG, repair harness or
connectors.
NG
OK
OK
@
CHECK
CONTROL FUNCTION.
1. Jack updrive wheels.
2. Start engine andwarm itup suffi-
ciently.
3. Shift selector leverto"0" position.
4. Check voltage between ECMterminal
GID
andground underthefollowing
conditions.
Voltage: Accelerator pedalIsdepressed
[Vehicle speedisabove
58 km/h (36MPH).]
Battery voltage
Accelerator pedalisfully
released
Approximately OV
CHECK POWER SUPPLY.
1. Stop engine.
2. Disconnect torqueconverter clutch
solenoid valveharness connector.
3. Turn ignition switch"ON".
4. Check voltage between terminal
@
and ground.
Voltage: Batteryvoltage
-
MEC785B
MEC279BA
Ef
CONNECTOR
II
115
II
ECM
~~
ID
cf8~-H
EC-368
Page 1091 of 1701

VE-TVPEINJECTION PUMP
G)
Engine slinger
@
Rear backcover
@
Injection pumpsprocket
@
Injection pumpbracket
@
Bracket
@
Bracket
(J)
Water hoses
@
Injection pump
@ Key
Removal
1. Put amatchmark acrossinjection pumpandinjection pump
bracket.
2. Disconnect battery
e
cable, electrical connectors and
accelerator wire.
3. Set No.1 piston atTDe onitscompression stroke.
TOC: Crankshaft pulleynotchwithout painted mark
4. Disconnect waterhoses forcold start device.
5. Remove fuelhoses (supply, returnandspill) andinjection
tubes.
6. Remove airduct andinjection pumptiming beltcover.
7. Remove injection pumptiming belt.
Refer toEM section ("Injection PumpTiming. Belt").
EC-372
Page 1093 of 1701

VE-TYPE INJECTION PUMP
SEF779A
Adjustment
INJECTION TIMINGADJUSTMENT (Plunger
lift
adjustment)
Preparation ofcold start device
1. Turn coldstart device linkage clockwise.
2. Set asuitable block[Thickness: about15mm (0.59 in)]
between coldstart device plunger andlinkage rod.
3. Turn crankshaft 2turns clockwise toset the device tonor-
mal position.
Checking
1. Set NO.1 piston atTDC onitscompression stroke.
TDC: Without paintedmark
2. Remove injection tubesandairbleeder onthe back ofinjec-
tion pump.
3. Set dial gauge soitsindicator pointstosomewhere between
1.0 and 2.0mm (0.039 and0.079 in)onthe scale.
4. Turn crankshaft 1turn clockwise andcheck thatdialgauge
indicates thesame value again.
5. Turn crankshaft counterclockwise about20to25 degrees,
then setdial gauge indicator to0mm (0in).
6. Turn crankshaft clockwiseandsetthe pump timing markto
the mark onthe crankshaft pulley.
Pump timing mark:Yellow painted mark
Injection timing:8
0
BTDC
7. Read plunger lift.
Plunger lift:
0.79 -0.85 mm(0.0311 -0.0335 in)atpump timing
mark
• When repeating thechecking, startwithstep 5.
Adjusting
1. Ifplunger liftisnot within thespecified value,adjust by
turning injection pump.
• Ifindication issmaller thanthespecified value,turnpump
body away fromengine.
• Ifindication islarger thanthespecified value,turnpump
body towards engine.
2. Tighten injection pumpsecuring boltsandnuts.
Nut:
~: 13-18 N.m (1.3-1.8 kg-m, 9-13 ft-Ib)
Bolt:
~: 49-59 N.m (5.0-6.0 kg-m, 36-43 ft-Ib)
3. Remove dialgauge andinstall airbleeder withnewwasher.
4. Install injection tubes.
Flare nut:
~: 22-25 N.m (2.2-2.5 kg-m, 16-18 ft-Ib)
5. Bleed airfrom fuelsystem.
Refer to"Water Draining, FuelFilter Check andReplacement"
of "ENGINE MAINTENANCE" inMA section.
EC-374