engine ACURA RL KA9 1996 Service Workshop Manual

ACURA RL KA9 1996 Service Workshop Manual RL KA9 1996 ACURA ACURA https://www.carmanualsonline.info/img/32/56992/w960_56992-0.png ACURA RL KA9 1996 Service Workshop Manual

Page 363 of 1954

ACURA RL KA9 1996  Service Workshop Manual 
Actuator Cable Adjustment

1. Check that the actuator cable moves smoothly with

no binding or sticking.

2. Measure the amount of movement of the output

linkage until the engine speed starts to inc

Page 365 of 1954

ACURA RL KA9 1996  Service Workshop Manual Engine Removal/Installatio n
Removal
Make sur e jack s an d safet y stand s ar e place d properl y
an d hois t bracket s ar e attache d to  th e correc t position s
o n  th e engine .
Mak e sur e th e

Page 366 of 1954

ACURA RL KA9 1996  Service Workshop Manual Engine Removal/Installatio n
Removal (cont'd )
7. Remov e th e intak e ai r duc t an d ai r cleane r housin g
assembly .
6 x  1. 0 m m12  N- m (1. 2 kgf-m ,
8. 7 Ibf-ft )
INTAK E AI RDUC T
AIR CLE

Page 367 of 1954

ACURA RL KA9 1996  Service Workshop Manual 12. Remov e th e vacuu m hose , the n remov e th e clam p
fro m th e under-hoo d fuse/rela y box .
VACUU MHOSE CLAM
P
13. Remov e th e alternato r an d batter y cable s fro m th e
under-hoo d fuse/rel

Page 368 of 1954

ACURA RL KA9 1996  Service Workshop Manual Engine Removal/Installatio n
Removal (cont'd )
18. Remov e th e evaporativ e emissio n (EVAP ) caniste r
hos e an d brak e booste r vacuu m hose .
BRAK E BOOSTE R
VACUU M HOS E
EVA P CONTRO L
CANI

Page 369 of 1954

ACURA RL KA9 1996  Service Workshop Manual 
22. Disconnect the spark plug voltage detection module

connector, and remove the engine ground cables.

6 x 1.0 mm

12 N-m (1.2 kgf-m,

8.7 Ibf-ft) 
GROUND

CABLES

SPARK PLUG VOLTAGE

DETECTION MOD

Page 370 of 1954

ACURA RL KA9 1996  Service Workshop Manual Engine Removal/Installatio n
Removal (cont'd )
26. Disconnec t th e powe r steerin g pressur e (PSP ) switc h
connector .
ADJUSTIN GBOLT
LOCKNU T8 x 1.2 5 mm22  N- m (2. 2 kgf-m ,
1 6  Ibf-ft )
PS

Page 372 of 1954

ACURA RL KA9 1996  Service Workshop Manual Engine Removal/Installatio n
Removal (cont'd )
44. Remov e th e hea t shield .
Loosen thes ebolts.
HEATSHIEL D
6 x  1. 0 m m9.8 N- m (1. 0 kgf-m , 7. 2 Ibf-ft )
45. Remov e th e AT F coole r hoses

Page 373 of 1954

ACURA RL KA9 1996  Service Workshop Manual 
54. Attach the chain hoist to the engine.

FUEL PRESSURE REGULATOR

29 N-m (3.0 kgf-m, 22 Ibf-ft)

NOTE: Loosen the locknut on the

fuel pressure regulator, then turn

the fuel pressure regulator 180

Page 374 of 1954

ACURA RL KA9 1996  Service Workshop Manual Engine Removal/Installatio n
Removal (cont'd )
55. Rais e th e hoist .
56. Remov e th e shif t cabl e guide .
CAUTION : Tak e car e no t t o ben d th e shif t cabl e
(see sectio n 14 ).
57 . Remov