lock FORD MUSTANG 1969 Volume One Chassis

FORD MUSTANG 1969 Volume One Chassis MUSTANG 1969 FORD FORD https://www.carmanualsonline.info/img/11/56943/w960_56943-0.png FORD MUSTANG 1969 Volume One Chassis

Page 141 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-07-03 
Ford Design Non-Integral Power Steering System

03-07-03

5.
 Lower the vehicle and disconnect

the fluid return hose from the reser-

voir.

6. Disconnect the fluid pressure

hose from the

Page 142 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-07-04 
Ford Design Non-Integral Power Steering System

03-07-04

12.
 Stop the engine, and check the

control valve and hose connections for

fluid leaks. Correct the cause of any

leaks.

13.
 Ch

Page 146 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-08-02 
Ford Design Integral Power Steering Gear

03-08-02

-INPUT SHAFT

OUTLET PORT

INLET PORT

CONTROL VALVE HOUSING

SECTOR SHAFT COVER

SECTOR SHAFT ADJUSTMENT SCREW

LOCK NUT

IDENTIFICATION

Page 147 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-08-03 
Ford Design Integral Power Steering Gear

03-08-03

factory adjustments will change. These

changes in adjustment do not neces-

sarily affect the satisfactory operation

of the steering ge

Page 148 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-08-04 
Ford Design Integral Power Steering Gear

03-08-04

3.
 Turn the input shaft to either

stop then, turn it back approximately

1 3/4 turns to center the gear.

4.
 Remove the two sector sha

Page 149 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-08-05

Ford Design Integral Power Steering Gear

03-08-05

rque Wrench

Tool-T66P-3553-C

G1366-A

FIG.
 5—Installing Valve Housing Attaching
 Nut 
24.
 Align
 the
 lube passage
 in the

valve h

Page 150 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-08-06

Ford Design Integral Power Steering Gear

03-08-06

VALVE HOUSING

7W-T65P

C1239 -A

FIG. 7—Removing or Installing Lock

Nut

drain the remaining fluid from the

gear.

2.
 Mount the gea

Page 152 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-08-08 
Ford Design Integral Power Steering Gear

03-08-08

LONG END

AWAY FROM

SEAL 
Press Ram

G1375-A

FIG. 15— Installing Sector Shaft

Outer Seal

1.
 Mount the valve housing in the

holdin

Page 153 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-09-01 
Saginaw Design Integral Power Steering Gear

03-09-01

PART 3-9 Saginaw Design

Integral Power Steering Gear

COMPONENT INDEX

STEERING GEAR

Cleaning and Inspection (See Page 03-01)

Descr

Page 155 of 413

FORD MUSTANG 1969  Volume One Chassis 
03-09-03 
Saginaw Design Integral Power Steering Gear

03-09-03

shaft and install and tighten the attach-

ing bolts to specification.

6. Connect and tighten the fluid 
pressure and the return line