MAZDA PROTEGE 1992 Workshop Manual

MAZDA PROTEGE 1992 Workshop Manual PROTEGE 1992 MAZDA MAZDA https://www.carmanualsonline.info/img/28/57077/w960_57077-0.png MAZDA PROTEGE 1992 Workshop Manual
Trending: headlight aiming, fuse, brake rotor, towing, flat tire, maintenance schedule, fuse box diagram

Page 221 of 1164

MAZDA PROTEGE 1992  Workshop Manual ASSEMBLY B2 
03UOB2-111 
03UOB2-ill 
03UOB2-119 
No.3 Engine Mount Bracket 
1. Install the No.3 engine mount bracket. 
Tightening torque: 
93-l 17 N-m (9.5-l 1.9 m-kg, 69-86 ft-lb) 
Alternator and Dri

Page 222 of 1164

MAZDA PROTEGE 1992  Workshop Manual B2 ASSEMBLY 
03UOB2-15: 
I 
03UOB2-121 
3. Connect the harness and hose. 
--’ 
Distributor and High-tension Lead 
1. Apply grease to a new O-ring and the blade. 
2. Install the distributor and loose

Page 223 of 1164

MAZDA PROTEGE 1992  Workshop Manual ENGINE STAND DISMOUNTING 
ENGINE STAND DISMOUNTING 
PROCEDURE 
1. Remove the engine from the SST (engine stand). 
2. Remove the SST (engine hanger) from the engine. 
3. Install the parts shown in the

Page 224 of 1164

MAZDA PROTEGE 1992  Workshop Manual 92 ENGINE STAND DISMOUNTING 
03UOB2 122 
-l!----- - 0311082-70 
05UOEX-25 
__._.__ -- _... -- _____II-___p--.- 
051JOBX-25 
82-92 
Water Inlet Pipe 
1. Remove all foreign material from the water inlet

Page 225 of 1164

MAZDA PROTEGE 1992  Workshop Manual INSTALLATION 82 
INSTALLATION 
PROCEDURE 
1. Tighten all bolts and nuts to the specified torques. 
Step 1 
Torque Specifications 
ATX 34-49 
(3.5-5.0, 25-36) 
I 
\56-60 (6.6-6.2, 41-59) 
7-52 (3.6-5.3

Page 226 of 1164

MAZDA PROTEGE 1992  Workshop Manual 62 INSTALLATION 
03UOB2-12 
. , 
03UOB2-12’ 
13UOB2-01. 
Automatic transaxle 
1. Join the engine and transaxle. 
2. Install the transaxle mounting bolts shown in the figure. 
3. Tighten the bolts.

Page 227 of 1164

MAZDA PROTEGE 1992  Workshop Manual INSTALLATION B2 
Step 2 
Warning 
l Be sure the vehicle is securely supported on Safety stands. 
Torque Specifications 
‘4-l 03 
‘.5-10.5, 54-76) 
37-52 (3.8-5.3, 27-38) 
/ 
37-52 (3.8-5.3, 27-38)

Page 228 of 1164

MAZDA PROTEGE 1992  Workshop Manual B2 INSTALLATION 
L I I 
03UOBZ-132 
03UOB2-1 34 
Engine and transaxle assembly 
1. Suspend the engine and transaxle assembly. 
Caution 
l Do not damage any components in the engine com- 
partment. 
2.

Page 229 of 1164

MAZDA PROTEGE 1992  Workshop Manual INSTALLATION 
Step 3 
Torque Specifications 
16-23 (1.6-2.3, 12-17) 6.9-9.8 N.m (70-100 cm-kg, 61-87 in-lb) 
I 
 
m- ,, 
// / 31-46 (3.2-4.7, 23-34) 
ATX 
Y 
16-23 (1.6-2.3, 12-17) I 37-52 (3.8-5.3, 2

Page 230 of 1164

MAZDA PROTEGE 1992  Workshop Manual B2 INSTALLATION 
I 1 
OBUOEP-138 
I 
J 13UOB2-024 
Tie-rod end 
1. Install the tie-rod end to the knuckle. 
Tightening torque: 
42-57 N-m (4.3-5.8 m-kg, 31-42 ft-lb) 
2. Install the new split pin. 
St
Trending: coolant temperature, seat adjustment, brakes, maintenance schedule, torque, oil viscosity, power steering fluid